Sebo T L,A long range production/resource planning system using linear programming,Computers & Industrial Engineering,1986(1 - 4).
[2]
Billington P J,Mcclain J O,Thomas L J,Mathematical programming approaches to capacity constrained MRP systems:review,formulation and problem reduction,Management Science,1983(15).
Silva C R N,Morabito R,Performance evaluation and capacity planning in a metallurgical job-shop system using open queueing network models,International Journal of Production Research,2009(23).
[5]
S.Seshadri ;M.Pinedo,Optimal allocation of resources in a job shop environment,IIE Transactions?,1999, 31(3).
[6]
Masahiro Arakawa ;Masahiko Fuyuki ;Ichiro Inoue,An optimization-oriented method for simulation-based job shop scheduling incorporating capacity adjustment function,International Journal of Production Economics?,2003, 85(3).
Y. W. Guo ;W. D. Li ;A. R. Mileham ;G. W. Owen,Applications of particle swarm optimisation in integrated process planning and scheduling,Robotics and Computer-Integrated Manufacturing?,2009, 25(2).
Shahabudeen P,Krishnaiah K,Narayanan M T,Design of a two-card dynamic kanban system using a simulated annealing algorithm,International Journal of Advanced Manufacturing Technology,2003(10 - 11).