孙秋芹,李庆余,李庆民,等.特高压输电线路潜供电弧的物理模拟与建模综述[J].电网技术,2011,35(2):7-12.Sun Qiuqin,Li Qingyu,Li Qingmin,et al.Survey on physical simulation and mathematical modelling for secondary arcs of UHV transmission lines[J].Power System Technology,2011,35(2):7-12 (in Chinese).
[2]
王晓彤,班连庚,朱普轩,等.750kV同塔同窗同相序双回紧凑型线路的潜供电流和感应电压[J].电网技术,2011,35(1):84-90.Wang Xiaotong,Ban Liangeng,Zhu Puxuan,et al.Research on secondary-arc currents and induced voltages for 750 kV compact double-circuit transmission lines on the same tower with the same phase sequence in the same tower window[J].Power System Technology,2011,35(1):84-90 (in Chinese).
[3]
李振强,戴敏,娄颖,等.特高压线路地线布置方式对地线电能损耗及潜供电流的影响[J].电网技术,2010,35(2):24-28.Li Zhenqiang,Dai Min,Lou Ying,et al.Effect of UHV ground wire disposition on its electric energy loss and second arc current[J].Power System Technology,2010,35(2):24-28 (in Chinese).
[4]
Dommel H W.电力系统电磁暂态计算理论[M].北京:水利电力出版社,1991:68,78.
[5]
王晓彤,林集明,班连庚,等.稳态计算中2种EMTP线路模型的比较研究[J].中国电力,2009,42(12):15-19.Wang Xiaotong,Lin Jiming,Ban Liangeng,et al.Comparison between two kinds of EMTP line models in steady-state calculations [J].Electric Power,2009,42(12):15-19(in Chinese).
[6]
刘振亚.特高压电网[M].北京:中国经济出版社,2005:167-172.
[7]
陈亚伦,李志国.伊敏一冯屯500 kV同塔双回线不平衡度、感应电流及潜供电流研究[J].电网技术,1995,19(6):13-17.Chen Yalun,Li Zhiguo.Study of unbalance factor and induced current for Yimin-Fengtun 500 kV double-circuit tower line[J].Power System Technology,1995,19(6):13-17(in Chinese).
[8]
王晓彤,林集明,班连庚,等.1 000 kV同塔双回线路不平衡度及换位方式分析[J].电网技术,2009,33(5):1-5.Wang Xiaotong,Lin Jiming,Ban Liangeng,et al.Analysis on unbalance factor and transposing modes for 1 000 kV double-circuit transmission lines on the same tower[J].Power System Technology,2009,33(5):1-5(in Chinese).
[9]
陈恺,林章岁.1 000 kV特高压同塔双回输电线路相序排列和换位方式研究[J].电力与电工,2011,31(3):11-14.Chen Kai,Lin Zhangsui.Study on phase sequence arrangement and transposing modes for 1 000 kV UHV double circuit transmission lines[J].Electric Power and Electrical Engineering,2011,31(3):11-14(in Chinese).
张赟,曾嵘,张波.750 kV同塔双回输电线路相序排列方式的研究[J].陕西电力,2008,36(6):1-5.Zhang Yun,Zeng Rong, Zhang Bo.Study on phase-order arrangement of 750 kV double circuit transmission line in same tower[J].Shanxi Electric Power,2008,36(6):1-5(in Chinese).
[12]
曹荣江,顾霓鸿,盛勇.电力系统潜供电弧自灭特性的模拟研究[J].中国电机工程学报,1996,16(2):73-78.Cao Rongjiang,Gu Nihong,Sheng Yong.The study on self-extinction behavior of secondary arc on power system[J].Proceedings of the CSEE,1996,16(2):73-78(in Chinese).
[13]
和彦淼,宋杲,曹荣江.特高压同塔双回输电线路潜供电弧模拟试验等价性研究[J].电网技术,2008,32(22):4-7.He Yanmiao, Song Gao, Cao Rongjiang.The equivalence research for secondary arc simulation test of UHV with double circuit transmission lines[J].Power System Technology,2008,32(22):4-7(in Chinese).
[14]
和彦淼,宋杲,曹荣江,等.1 000 kV特高压输电线路潜供电弧试验研究[J].中国电机工程学报,2011,31(16):138-143.He Yanmiao,Song Gao, Cao Rongjiang,et al.Test research of secondary arc in 1 000 kV UHV double-circuit transmission lines[J].Proceedings of the CSEE,2011,31(16):138-143(in Chinese).
[15]
张媛媛,班连庚,林集明,等.1 000 kV同塔双回输电线路潜供电流研究[J].电网技术,2009,33(15):87-92.Zhang Yuanyuan,Ban Liangeng,Lin Jiming,et al.Research on secondary arc current of 1 000 kV double-circuit transmission lines on the same tower[J].Power System Technology,2009,33(15):87-92.
[16]
李振强,谷定燮,修木洪.特高压同塔双回线路潜供电弧抑制措施的比较[J].高电压技术,2010,36(10):2388-2392.Li Zhenqiang,Gu Dingxie,Xiu Muhong.Comparison of two measures on restricting secondary arc in UHV double circuit lines on the same tower[J].High Voltage Engineering,2010,36(10):2388-2392(in Chinese).
[17]
牛涛,谢珍建,钱康,等.徐州-南京1 000 kV输电线路潜供电流影响因素分析及高抗中性点接地电抗优化计算[J].电网技术,2010,34(11):12-17.Niu Tao,Xie Zhenjian,Qian Kang,et al.Analysis on factors impacting secondary arc current in 1 000 kV transmission line from Xuzhou to Nanjing and optimized calculation of grounding reactor connected to neutral of high voltage shunt reactors[J].Power System Technology,2010,34(11):12-17(in Chinese).
[18]
易强,周浩,计荣荣,等.同塔双回特高压线路潜供电流和恢复电压的限制[J].电力系统自动化,2011,35(10):83-88.Yi Qiang,Zhou Hao,Ji Rongrong,et al.Restriction on secondary arc current on ultra-high voltage AC double circuit transmission lines on the same tower[J].Automation of Electric Power Systems,2011,35(10):83-88(in Chinese).