张楷旋,陈建英,郭创新,等.考虑天气因素的含风电场电力系统的概率潮流分析[J].电网技术,2014,38(12):3418-3423.Zhang Kaixuan,Chen Jianying,Guo Chuangxin,et al.Weather factor based analysis on probabilistic load flow of power grid containing wind farms[J].Power System Technology,2014,38(12):3418-3423 (in Chinese).
[2]
赵渊,郭胤,谢开贵,等.考虑参数不确定的电网可靠性概率分布特征[J].电网技术,2013,37(8):2165-2172.Zhao Yuan,Guo Yin,Xie Kaigui,et al.Research on probability distribution characteristics of bulk power system reliability considering parameter[J].Power System Technology,2013,37(8):2165-2172 (in Chinese).
[3]
王锡凡,王秀丽.电力系统随机潮流分析[J].西安交通大学学报,1988,22(3):87-97.Wang Xifan,Wang Xiuli.Probabilistic load flow analysis in power system[J].Journal of Xi’an Jiaotong University,1988,22(3):87-97(in Chinese).
[4]
易迟韡,胡泽春,宋永华.考虑注入功率分布的随机最优潮流方法[J].电网技术,2013,37(2):367-371.Yi Chiwei,Hu Zechun,Song Yonghua.A stochastic optimal power flow method considering power injection distributions[J].Power System Technology,2013,37(2):367-371(in Chinese).
[5]
Borkowska B.Probabilistic load Flow [J].IEEE Trans on PAS,1974,PAS-93(3):752-759.
[6]
Leite de Silva A M,Arienti V L.Probabilistic load flow by a multilinear simulation algorithm[J].IEE Proceedings C Generation,Transmission and Distribution,1990,137(4):276-282.
[7]
罗钢,石东源,陈金富,等.风光发电功率时间序列模拟的MCMC方法[J].电网技术,2014,38(2):321-327.Luo Gang,Shi Dongyuan,Chen Jinfu,et al.A Markov Chain Monte Carlo method for simulation of wind and solar power time series[J].Power System Technology,2014,38(2):321-327 (in Chinese).
[8]
蔡德福,石东源,陈金富.基于多项式正态变换和拉丁超立方采样的概率潮流计算方法[J].中国电机工程学报,2013,33(13):92-100.Cai Defu,Shi Dongyuan,Chen Jinfu.Probabilistic load flow calculation method based on polynomial normal transformation and Latin hypercube sampling[J].Proceedings of the CSEE,2013,33(13):92-100(in Chinese).
[9]
Su C L.Probabilistic load-flow computation using point estimate method[J].IEEE Transactions on Power Systems,2005,20(4):1843-1851.
[10]
Morales J M,Perez-Ruiz J.Point estimate schemes to solve the probabilistic power flow[J].IEEE Transactions on Power Systems,2007,22(4):1594-1601.
[11]
杨欢,邹斌.含相关性随机变量的概率潮流三点估计法[J].电力系统自动化,2012,36(15):51-56.Yang Huan,Zou Bin.A three-point estimate method for solving probabilistic power flow problems with correlated random variables[J].Automation of Electric Power Systems,2012,36(15):51-56(in Chinese).
[12]
Allan R N,Leite A M.Evaluation methods and accuracy in probabilistic load Flow solutions[J].IEEE Trans on PAS,1981,PAS-100(5):2539-2546.
[13]
戎晓雪,别朝红,石文辉,等.考虑风电场相关性的含风电电力系统随机潮流分析[J].电网技术,2014,38(8):2161-2167.Rong Xiaoxue,Bie Zhaohong,Shi Wenhui,et al.Analysis on probabilistic load flow in power gird integrated with wind farms considering correlativity among different wind farms[J].Power System Technology,2014,38(8):2161-2167(in Chinese).
[14]
刘小团,赵晋泉,罗卫华.基于TPNT和半不变量法的考虑输入量相关性概率潮流算法[J].电力系统保护与控制,2013,41(22):13-18.Liu Xiaotuan,Zhao Jinquan,Luo Weihua.A TPNT and cumulants based probabilistic load flow approach considering the correlation variables[J].Power System Protection and Control,2013,41(22):13-18(in Chinese).
[15]
石东源,蔡德福,陈金富,等.计及输入变量相关性的半不变量法概率潮流计算[J].中国电机工程学报,2012,32(28):104-113.Shi Dongyuan,Cai Defu,Chen Jinfu,et al.Probabilistic load flow calculation based on cumulant method considering correlation between input variables[J].Proceedings of the CSEE,2012,32(28):104-113(in Chinese).
[16]
朱星阳,刘文霞,张建华,等.计及系统调频作用的随机潮流模型与算法[J].中国电机工程学报,2014,34(1):168-178.Zhu Xingyang,Liu Wenxia,Zhang Jianhua,et al.Probabilistic load flow method considering function of frequency modulations[J].Proceedings of the CSEE,2014,34(1):168-178(in Chinese).
[17]
陈振寰,陈永华,行舟,等.大型集群风电有功智能控制系统控制策略(二)风火电“打捆”外送协调控制[J].电力系统自动化,2011,35(21):12-15.Chen Zhenhuan,Chen Yonghua,Xing Zhou,et al.A control stratrgy of active power intelligent control system for large cluster of wind farms part two coordination control for shared transmission of wind power and thermal power[J].Automation of Electric Power Systems,2011,35(21):12-15(in Chinese).
[18]
张节潭,王茂春,徐有蕊,等.采用最小累积风险度法的含风电场电力系统发电机组检修计划[J].电网技术,2011,35(5):97-102.Zhang Jietan,Wang Maochun,Xu Yourei,et al.Generation unit maintenance scheduling based on minimum cumulative risk algorithm for power system containing wind farms[J].Power System Technology,2011,35(5):97-102(in Chinese).
[19]
Nezhad A R,Mokhtari G,Davari M,et al.A new high accuracy method for calculation of LMP as a random variable[C]//International Conference on Electric Power and Energy Conversion Systems.Sharjah.United Arab Emirates:IEEE,2009:1-5.
[20]
刘怡芳,张步涵,李俊芳,等.考虑电网静态安全风险的随机潮流计算[J].中国电机工程学报,2011,31(1):59-64.Liu Yifang,Zhang Buhan,Li Junfang,et al.Probabilistic load flow algorithm considering static security risk of the power system[J].Proceedings of the CSEE,2011,31(1):59-64(in Chinese).
[21]
张节潭,程浩忠,姚良忠,等.分布式风电源选址定容规划研究[J].中国电机工程学报,2009,29(16):1-7.Zhang Jietan,Cheng Haozhong,Yao Liangzhong,et al.Study on siting and sizing of distributed wind generation[J].Proceedings of the CSEE,2009,29(16):1-7(in Chinese).
[22]
王青,杨悦,汪宁渤,等.风电与火电“打捆”外送系统频率调控策略研究[J].中国电力,2014(3):6-13.Wang Qing,Yang Yue,Wang Ningbo,et al.Study on the frequency adjustment characteristics of wind power uniting thermal power outgoing system[J].Electric Power,2014(3):6-13(in Chinese).
[23]
Zhang Pei,Lee S T.Probabilistic load flow computation using the method of combined cumulants and Gram-Charlier expansion[J].IEEE Trans on Power Systems,2004,19(1):676-682.