韩学山,赵建国.刚性优化与柔性决策结合的电力系统运行调度理论探讨[J].中国电力,2004,37(1):15-18.Han Xueshan,Zhao Jianguo.Theoretical discussion on combination of rigid optimality and flexible decision-making for electric power system operation dispatching[J].Electric Power,2004,37(1):15-18(in Chinese).
裴国凤,曹金象,刘国祥.尼洋河不同河段浮游植物群落多样性差异研究[J].长江流域资源与环境,2012,21(1):24-29.Pei Guofeng,Cao Jinxiang,Liu Guoxiang.Variations of phytoplankton biodiversity in different streams of Niyang river[J].Resources and Environment in the Yangtze Basin,2012,21(1):24-29(in Chinese).
[5]
马栋栋,吴海霞,王晓茜,等.青岛城市公园绿地多样性研究[J].山东林业科技,2012(2):52-54.Ma Dongdong,Wu Haixia,Wang Xiaoqian,et al.The research of Qingdao city park's diversity index[J].Journal of Shandong Forestry Science and Technology,2012(2):52-54(in Chinese).
[6]
华焜,袁锐,梁贺新.混合均匀度回归模型的建立与验证[J].粮食与饲料工业,2012(11):42-44.Hua Kun,Yuan Rui,Liang Hexin.Establishment and verification of regression model of mixing uniformity[J].Cereal & Feed Industry,2012(11):42-44(in Chinese).
[7]
高毅,高尚.均匀设计优化方法[J].科学技术与工程,2011,11(2):371-373.Gao Yi,Gao Shang.Research on uniform design in optimization[J].Science Technology and Engineering,2011,11(2):371-373(in Chinese).
[8]
李长云,潘伟强,胡盛龙.基于均匀设计的支持向量机参数优化方法[J].计算机工程与科学,2014,36(4):702-706.Li Changyun,Pan Weiqiang,Hu Shenglong.Parameter optimization method of SVM based on uniform design[J].Computer Engineering & Science,2014,36(4):702-706(in Chinese).
[9]
黄斌.电子元器件质量一致性检验[J].电子世界,2013(18):31-32.Huang Bin.Quality conformance inspection of electronic components [J].Electronics World,2013(18):31-32(in Chinese).
[10]
谢铉洋.从木桶理论的发展史浅议管理研究方法[J].技术经济与管理研究,2013(4):50-54.Xie Xuanyang.A brief analysis on management research methodology based on Bucket Principal's evolution history[J].Technoeconomics & Management Research,2013(4):50-54(in Chinese).
[11]
傅霞飞.电力系统不均匀性分析软件开发成功[J].华中电力,2000,13(4):22.
[12]
方勇杰.美国“9•8”大停电对连锁故障防控技术的启示[J].电力系统自动化,2012,36(15):1-7.Fang Yongjie.Lessons for September 8,2011 southwest America blackout for prevention and control of cascading outages[J].Automation of Electric Power Systems,2012,36(15):1-7(in Chinese).
[13]
伦涛,韩鹏飞,贺静波,等.近年国外大停电事故概述及分析[J].中国能源,2012,34(2):41-43.Lun Tao,Han Pengfei,He Jingbo,et al.Review and analysis on several recent large-scale blackouts abroad[J].Energy of China,2012,34(2):41-43(in Chinese).
[14]
薛禹胜,肖世杰.从印度大停电透视电力系统的广义阻塞[J].电力系统自动化,2012,36(16):1-8.Xue Yusheng,Xiao Shijie.Through the India's blackout to perceive the generalized congestions in power systems[J].Automation of Electric Power Systems,2012,36(16):1-8(in Chinese).
[15]
Zhang Hui,Vittal V.A mixed-integer linear programming approach for multi-stage security-constrained transmission expansion planning[J].IEEE Trans on Power Systems,2012,27(2):1125-1133.
[16]
曾鸣,李红林,薛松,等.系统安全背景下未来智能电网建设关键技术发展方向—印度大停电事故深层次原因分析及对中国电力工业的启示[J].中国电机工程学报,2012,32(25):175-181.Zeng Ming,Li Honglin,Xue Song,et al.Key technologies of future smart grid construction based on power system security:a view of blackout in India and experience and enlightment to power industry in China[J].Proceedings of the CSEE,2012,32(25):175-181(in Chinese).
[17]
江知瀚,陈金富.计及不确定性和多投资主体需求指标的分布式电源优化配置方法研究[J].中国电机工程学报,2013,33(31):34-42.Jiang Zhihan,Chen Jinfu.Optimal distributed generator allocation method considering uncertainties and requirements of different investment entities[J].Proceedings of the CSEE,2013,33(31):34-42(in Chinese).
[18]
Silva I J,Rider M J,Romero R,et al.Transmission network expansion planning considering uncertainty in demand[J].IEEE Trans on Power Systems,2006,21(4):1565-1573.
[19]
Bludszuweit H,Dominguez-Navarro J A.A probabilistic method for energy storage sizing based on wind power forecast uncertainty[J].IEEE Trans on Power Systems,2011,26(3):1651-1658.
[20]
Opathella C,Venkatesh B.Managing uncertainty of wind energy with wind generators cooperative[J].IEEE Trans on Power Systems,2013,28(3):2918-2928.
[21]
郭永基.电力系统及电力设备的可靠性[J].电力系统自动化,2001,25(17):53-56.Guo Yongji.Reliability of power system and power equipment[J].Automation of Electric Power Systems,2001,25(17):53-56(in Chinese).
[22]
Sun Weiqing,Wang Chengmin,Zhang Yan.Flexibility evaluation and flexible comprehensive optimization in power systems[J].European Transactions on Electrical Power,2012,22(6):846-865.
[23]
梁才,刘文颖,温志伟,等.电网组织结构对其自组织临界性的影响[J].电力系统保护与控制,2010,38(20):6-11.Liang Cai,Liu Wenying,Wen Zhiwei,et al.The influences of power grid structure on self-organized criticality[J].Power System Protection and Control,2010,38(20):6-11(in Chinese).
[24]
Wang Ansi,Luo Yi,Tu Guangyu,et al.Vulnerability assessment scheme for power system transmission networks based on the fault chain theory[J].IEEE Trans on Power Systems,2011,26(1):442-450.
[25]
丁明,韩平平.加权拓扑模型下的小世界电网脆弱性评估[J].中国电机工程学报,2008,28(10):20-25.Ding Ming,Han Pingping.Vulnerability assessment to small-world power grid based on weighted topological model[J].Proceedings of the CSEE,2008,28(10):20-25(in Chinese).
[26]
徐林,王秀丽,王锡凡.使用等值导纳进行电力系统小世界特性识别[J].中国电机工程学报,2009, 29(19):20-26.Xu Lin,Wang Xiuli,Wang Xifan.Small-world feature identification based on equivalent admittance for power system[J].Proceedings of the CSEE,2009,29(19):20-26(in Chinese).
[27]
舒征宇,邓长虹,黄文涛,等.小世界电力网络故障传播过程与抑制策略[J].电网技术,2013,37(3):861-867.Shu Zhengyu,Deng Changhong,Huang Wentao,et al.Analysis on propagation of cascading failure in small-world power network and its suppressing strategy[J].Power System Technology,2013,37(3):861-867(in Chinese).
[28]
孙伟卿,王承民,张焰.考虑输电线路负载率约束和全规划周期柔性成本评估的电网规划方法[J].电网技术,2013,37(10):2985-2990.Sun Weiqing,Wang Chengmin,Zhang Yan.A power grid planning method considering transmission line load rate constraint and flexible cost evaluation within full planning cycle[J].Power System Technology,2013,37(10):2985-2990(in Chinese).
[29]
孙伟卿,王承民,张焰,等.采用柔性化方法表示刚性约束的电力系统柔性优化模型[J].电网技术,2012,36(3):120-126.Sun Weiqing,Wang Chengmin,Zhang Yan,et al.Flexible optimization model in power systems adopting flexible expression of rigid constraints[J].Power System Technology,2012,36(3):120-126(in Chinese).
聂宏展,郑鹏飞,李帅,等.考虑支路负载率均衡性的输电网规划[J].电工电能新技术,2014,33(3):7-12.Nie Hongzhan,Zheng Pengfei,Li Shuai,et al.Transmission network planning considering balance of branches load rate[J].Advanced Technology of Electrical Engineering and Energy,2014,33(3):7-12(in Chinese).
[32]
颜伟,高强,余娟,等.输电网络的分层分区电压无功调节方法[J].电网技术,2011,35(2):71-77.Yan Wei,Gao Qiang,Yu Juan,et al.An algorithm for hierarchical and partitioned regulation of voltage and reactive power in transmission network[J].Power System Technology,2011,35(2):71-77(in Chinese).
[33]
张强,韩学山,马志波,等.电网输电能力综合评价系统的开发[J].山东电力技术,2007(6):3-6.Zhang Qiang,Han Xueshan,Ma Zhibo,et al.Research and design on power grid transfer capability comprehensive evaluation system[J].Shandong Dianli Jishu,2007(6):3-6(in Chinese).
[34]
张强,韩学山,徐建政.安全经济调度与均匀调度间关系分析[J].电力系统及其自动化学报,2005,17(2):84-89.Zhang Qiang,Han Xueshan,Xu Jianzheng.Analysis of security economic dispatch and homogeneous dispatch[J].Proceedings of the CSU-EPSA,2005,17(2):84-89(in Chinese).
[35]
常康,韩学山,王孟夏,等.电网关键元件及其单调性研究I:概念与基础[J].电力系统保护与控制,2009,37(6):1-5.Chang Kang,Han Xueshan,Wang Mengxia,et al.Study on the crucial element and its monotone in power grid part І:concepts and foundation [J].Power System Protection and Control,2009,37(6):1-5(in Chinese).
[36]
于群,曹娜,郭剑波.负载率对电力系统自组织临界状态的影响分析[J].电力系统自动化,2012,36(1):24-27.Yu Qun,Cao Na,Guo Jianbo.Analysis on influence of load rate on power system self-organized criticality[J].Automation of Electric Power Systems,2012,36(1):24-27(in Chinese).
[37]
Chen J,Thorp J S,Dobson I.Cascading dynamics and mitigation assessment in power system disturbances via a hidden failure model[J].Electrical Power and Energy Systems,2005,27(4):318-326.
[38]
何飞,梅生伟,薛安成,等.基于直流潮流的电力系统停电分布及自组织临界性分析[J].电网技术,2006,30(14):7-12.He fei,Mei Shengwei,Xue Ancheng,et al.Blackouts distribution and self-organized criticality of power system based on DC power flow[J].Power System Technology,2006,30(14):7-12(in Chinese).
[39]
曹一家,王光增,曹丽华,等.基于潮流熵的复杂电网自组织临界态判断模型[J].电力系统自动化,2011,35(7):1-6.Cao Yijia,Wang Guangzeng,Cao Lihua,et al.An identification model for self-organized criticality of power grids based on power flow entropy[J].Automation of Electric Power Systems,2011,35(7):1-6(in Chinese).
[40]
孙欣,吕跃春,高军,等.电网经济性与安全性的精益化协调方法[J].电网技术,2009,33(11):12-17.Sun Xin,Lü Yuechun,Gao Jun,et al.Power grid economy and security coordination lean method[J].Power System Technology,2009,33(11):12-17(in Chinese).
[41]
Rajabi-Ghahnavieh A,Fotuhi-Firuzabad M,Shahidehpour M,et al.Optimal allocation of available transfer capability in operating horizon [J].IEEE Trans on Power Systems,2009,24(2):967-975.
[42]
鲍冠南,陆超,袁志昌,等.基于动态规划的电池储能系统削峰填谷实时优化[J].电力系统自动化,2012,36(12):11-16.Bao Guannan,Lu Chao,Yuan Zhichang,et al.Load shift real-time optimization strategy of battery energy storage system based on dynamic programming[J].Automation of Electric Power Systems,2012,36(12):11-16(in Chinese).
[43]
张钦,王锡凡,付敏,等.需求响应视角下的智能电网[J].电力系统自动化,2009,33(17):49-55.Zhang Qin,Wang Xifan,Fu Min,et al.Smart grid from the perspective of demand response[J].Automation of Electric Power Systems,2009,33(17):49-55(in Chinese).
[44]
程瑜,安甦.主动负荷互动响应行为分析[J].电力系统自动化,2013,37(20):63-70.Cheng Yu,An Su.Analysis of active load's interaction response behavior[J].Automation of Electric Power Systems,2013,37(20):63-70(in Chinese).
[45]
王锡凡,邵成成,王秀丽,等.电动汽车充电负荷与调度控制策略综述[J].中国电机工程学报,2013,33(1):1-10.Wang Xifan,Shao Chengcheng,Wang Xiuli,et al.Survey of electric vehicle charging load and dispatch control strategies[J].Proceedings of the CSEE,2013,33(1):1-10(in Chinese).
[46]
所丽,唐巍,白牧可,等.考虑削峰填谷的配电网集中型充电站选址定容规划[J].中国电机工程学报,2014,34(7):1052-1060.Suo Li,Tang Wei,Bai Muke,et al.Locating and sizing of centralized charging stations in distribution network considering load shifting[J].Proceedings of the CSEE,2014,34(7):1052-1060(in Chinese).
[47]
葛少云,王龙,刘洪,等.计及电动汽车入网的峰谷电价时段优化模型研究[J].电网技术,2013,37(8):2316-2321.Ge Shaoyun,Wang Long,Liu Hong,et al.An optimization model of peak-valley price time-interval considering vehicle-to-grid[J].Power System Technology,2013,37(8):2316-2321(in Chinese).
[48]
何明杰,彭春华,曹文辉,等.考虑电动汽车规模化入网的动态经济调度[J].电力自动化设备,2013,33(9):82-88.He Mingjie,Peng Chunhua,Cao Wenhui,et al.Dynamic economic dispatch considering large-scale integration of electric vehicles[J].Electric Power Automation Equipment,2013,33(9):82-88(in Chinese).
[49]
马玲玲,杨军,付聪,等.电动汽车充放电对电网影响研究综述[J].电力系统保护与控制,2013(3):140-148.Ma Lingling,Yang Jun,Fu Cong,et al.Review on impact of electric car charging and discharging on power grid[J].Power System Protection and Control,2013(3):140-148(in Chinese).
[50]
孙素清,邓云川,吕振聚.应用均匀分布负荷进行供电计算[J].电气化铁道,2005(5):18-20.Sun Suqing,Deng Yunchuan,Lü Zhenju.Power supply calculation using even distributed loads[J].Electric Railway,2005(5):18-20(in Chinese).
[51]
王璞,王承民,张焰,等.城市配电网规划中变电站最佳供电半径及容量的实用计算方法[J].电气应用,2011,30(23):38-41.Wang Pu,Wang Chengmin,Zhang Yan,et al.Practical calculation method of substation optimal power supply radius and capacity in urban distribution network planning[J].Electrotechnical Application,2011,30(23):38-41(in Chinese).
[52]
王庆,秦旷宇,陈德伟.变电站应用大容量主变供电半径优化[J].电网与清洁能源,2014,30(4):18-23.Wang Qing,Qin Kuangyu,Chen Dewei.Power supply radius optimization for substations with large capacity transformers[J].Power System and Clean Energy,2014,30(4):18-23(in Chinese).
[53]
李敏,冯宇,程杰.20 kV线路经济供电半径[J].电力系统及其自动化学报,2013,25(2):130-135.Li Min,Feng Yu,Cheng Jie.Economical power supply radius for 20 kV lines[J].Proceedings of the CSU-EPSA,2013,25(2):130-135(in Chinese).
[54]
孙伟卿,王承民,张焰,等.电力系统运行均匀性分析与评估[J].电工技术学报,2014,29(4):173-180.Sun Weiqing,Wang Chengmin,Zhang Yan,et al.Analysis and evaluation on power system operation homogeneity[J].Transactions of China Electrotechnical Society,2014,29(4):173-180(in Chinese).