易杨,张尧,钟庆.基于蒙特卡罗方法的大型电力用户电压暂降评估[J].电网技术,2008,32(6):57-60.Yi Yang,Zhang Yao,Zhong Qing.Assessment of voltage sags in large power consumer based on monte carlo method[J].Power System Technology,2008,32(6):57-60(in Chinese).
[4]
Aung M T,Milanovic J V.Stochastic prediction of voltage sags by considering the probability of the failure of the protection system[J].IEEE Transactions on Power Delivery,2006,21(1):322-329.
[5]
杨晓东,李庚银,周明,等.不确定条件下的电压暂降概率评估[J].电网技术,2010,34(2):41-45.Yang Xiaodong,Li Gengyin,Zhou Ming,et al.Probability assessment of voltage sag under uncertain conditions[J].Power System Technology,2010,34(2):41-45(in Chinese).
[6]
黄文杰,傅砾,肖盛.采用改进模糊层次分析法的风速预测模型[J].电网技术,2010,34(7):164-168.Huang Wenjie, Fu Li, Xiao Sheng.A predictive model of wind speed based on improved fuzzy analytical hierarchy process[J].Power System Technology,2010,34(7):164-168(in Chinese).
[7]
章雪萌,李国栋,徐永海,等.基于预估的电压暂降技术经济评估[J].电网技术,2010,34(10):121-125.Zhang Xuemeng,Li Guodong,Xu Yonghai,et al.Technical and economic assessment of voltage sag based on stochastic prediction[J].Power System Technology,2010,34(10):121-125 (in Chinese).
[8]
Chan J Y,Milanovic J V,Delahunty A.Risk-based assessment of financial losses due to voltage sag[J].IEEE Transactions on Power Delivery,2011,26(2):492-500.
[9]
Vegunta S C,Milanovic J V.Estimation of cost of downtime of industrial process due to voltage sags[J].IEEE Transactions on Power Delivery,2011,26(2):576-587.
[10]
Gupta C P,Milanovic J V.Probabilistic assessment of equipment trips due to voltage sags[J].IEEE Transactions on Power Delivery,2006,21(2):711-718.
[11]
肖先勇,杨洪耕,陈武,等.敏感设备电压暂降敏感度模糊随机评估[J].中国电机工程学报,2009,29(34):90-95.Xiao Xianyong,Yang Honggeng,Chen Wu,et al.Fuzzy-random assessment method of equipment sensitivity to voltage sags[J].Proceedings of the CSEE,2009,29(34):90-95(in Chinese).
[12]
Chan J Y,Milanovic J V.Methodology for assessment of financial losses due to voltage sags and short interruptions[C]//9 th International Conference on Electrical Power Quality and Utilisation.EPQU 2007.Barcelona,IEEE,2007:1-6.
[13]
Stockman K,Hulster F D,Didden M,et al.Embedded solutions to protect textile processes against voltage sags[C]// Industry Applications Conference,37th IAS Annual Meeting.Pittsburgh,2002,4:2561-2566.
[14]
Rogers B,Stephens M,McGranaghan M.Power quality issues and solutions in the automotive industry[C]//International Conference on Power System Technology.Singapore,2004,1:238-243.
[15]
Carlsson F,Widell B,Sadarangani C.Ride-through investigation for a hot mill process[C]//International Conference on Power System Technology.Perth,2000,3:1605-1608.
[16]
Yun S Y,Kim J C.An evaluation method of voltage sag using a risk assessment model in power distribution systems[J].Electrical Power and Energy Systems,2003,25(10):829-839.
[17]
Cebrian J C,Kagan N.Hybrid method to assess sensitive process interruption costs due to faults in electric power distribution networks.IEEE Transactions on Power Delivery,2010,25(3):1686-1696.
[18]
Chan J Y,Milanovic J V,Delahunty A.Generic failure-risk assessment of industrial processes due to voltage sags[J].IEEE Transactions on Power Delivery,2009,24(4):2405-2414.
[19]
CIGRE/CIRED/UIE Joint Working Group C4.110.Voltage dip immunity of equipment and installations[R].Paris,France:CIGRE,2010.
[20]
刘旭娜,肖先勇,汪颖.电压暂降严重程度及其测度,不确定性评估方法[J].中国电机工程学报,2014,34(4):644-658.Liu Xuna,Xiao Xianyong,Wang Ying.Voltage sag severity and its measure and uncertainty evaluation[J].Proceedings of the CSEE,2014,34(4):644-658(in Chinese).
[21]
Atanassov K,Gargov.Interval valued intuitionistic fuzzy sets[J].Fuzzy Sets and Systems,1989,31(3):343-349.