麻常辉,梁军,杨永军,等.基于蒙特卡罗模拟法的输电网灵活规划[J].电网技术,2009,33(4):99-102.Ma Changhui,Liang Jun,Yang Yongjun,et al.Monte Carlo simulation based flexible planning of power transmission network[J].Power System Technology,2009,33(4):99-102(in Chinese).
[2]
聂宏展,吕盼,乔怡,等.基于熵权法的输电网规划方案模糊综合评价[J].电网技术,2009,33(11):60-64.Nie Hongzhan,Lü Pan,Qiao Yi,et al.Comprehensive fuzzy evaluation for transmission network planning scheme based on entropy weight method[J].Power System Technology,2009,33(11):60-64(in Chinese).
[3]
Rinebold J M.An assessment and report of distributed generation opportunities in southwest Connecticut[R].2003.
[4]
Lopes Ferreira H,Costescu A,L'Abbate A,et al.Distributed generation and distribution market diversity in Europe[J].Energy Policy,2011,39(9):5561-5571.
[5]
苏剑,周莉梅,李蕊.分布式光伏发电并网的成本/效益分析[J].中国电机工程学报,2013,33(34):50-56.Su Jian,Zhou Limei,Li Rui.Cost-benefit analysis of distributed grid-3 connected photovoltaic power generation[J].Proceedings of the CSEE,2013,33(34):50-56(in Chinese).
[6]
许偲轩,陆于平,章桢,等.分布式发电配电网新型充分式保护原理及方案[J].电网技术,2014,38(9):2532-2537.Xu Sixuan,Lu Yuping,Zhang Zhen,et al.Principle and implementation of a novel sufficient criterion protection for distribution network with distributed generation[J].Power System Technology,2014,38(9):2532-2537(in Chinese).
[7]
王淳,高元海.基于概率统计的含间歇性分布式发电的配电网无功优化[J].电网技术,2014,38(4):1032-1037.Wang Chun,Gao Yuanhai.Probability statistics based reactive power optimization of distribution network containing intermittent distributed generations[J].Power System Technology,2014,38(4):1032-1037(in Chinese).
[8]
杨雄,卫志农,孙国强,等.含分布式电源的配电网三相解耦潮流计算方法[J].电力自动化设备,2014,34(3):99-107.Yang Xiong,Wei Zhinong,Sun Guoqiang,et al.Decoupled three-phase power flow calculation for distribution network with DGs[J].Electric Power Automation Equipment,2014,34(3):99-107(in Chinese).
[9]
付文秀,范春菊,杨炼,等.配电网中分布式电源的选址定容和电流保护策略[J].电力系统自动化,2014,38(10):78-84.Fu Wenxiu,Fan Chunju,Yang Lian,et al.Locating and sizing of distributed generators and current protection strategy in distribution networks[J].Automation of Electric Power Systems,2014,38(10):78-84(in Chinese).
[10]
Ouyang Wu,Cheng Haozhong,Zhang Xiubin,et al.Distribution network planning method considering distributed generation for peak cutting[J].Energy Conversion and Management,2010,51(12):2394-2401.
[11]
方陈,张翔,程浩忠,等.主动管理模式下含分布式发电的配电网网架规划[J].电网技术,2014,38(4):823-829.Fang Chen,Zhang Xiang,Cheng Haozhong,et al.Framework planning of distribution network containing distributed generation considering active management[J].Power System Technology,2014,38(4):823-829(in Chinese).
[12]
徐玉琴,李雪冬.基于改进免疫克隆选择算法的含分布式电源配电网规划方法[J].电网技术,2010,34(8):97-101.Xu Yuqin,Li Xuedong.An improved immune clonal selection algorithm based planning method for distribution network with distributed generators[J].Power System Technology,2010,34(8):97-101(in Chinese).
[13]
张节潭,程浩忠,姚良忠,等.分布式风电源选址定容规划研究[J].中国电机工程学报,2009,29(16):1-7.Zhang Jietan,Cheng Haozhong,Yao Liangzhong,et al.Study on siting and sizing of distributed wind generation[J].Proceedings of the CSEE,2009,29(16):1-7(in Chinese).
[14]
陈家俊,蒋铁铮,周勇,等.考虑电压骤降的分布式电源定容和选址[J].电网技术,2014,38(8):2244-2249.Chen Jiajun, Jiang Tiezheng, Zhou Yong,et al.Reasonable allocation of distributed generation in distribution system considering voltage sag12 .Power System Technology,2014,38(8):2244-2249(in Chinese).
[15]
曾鸣,杜楠,张鲲,等.基于多目标静态模糊模型的分布式电源规划[J].电网技术,2013,37(4):954-959.Zeng Ming,Du Nan,Zhang Kun,et al.Distributed generation planning based on multiobjective static fuzzy model[J].Power System Technology,2013,37(4):954-959(in Chinese).
[16]
马艺玮,杨苹,郭红霞,等.风-光-沼可再生能源分布式发电系统电源规划[J].电网技术,2012,32(9):9-14.Ma Yiwei,Yang Ping,Guo Hongxia,et al.Power source planning of wind-PV-biogas renewable energy distributed generation system[J].Power System Technology,2012,32(9):9-14(in Chinese).