[1] | 任达勇.天广直流工程历年双极闭锁事故分析[J].高电压技术,2006,32(9):173-175. Ren Dayong.Analysis of bipolar block events over the years of Tian-Guang HVDC project[J].High Voltage Engineering,2006,32(9):173-175(in Chinese).
|
[2] | 齐旭,曾德文,史大军,等.特高压直流输电对系统安全稳定影响研究[J].电网技术,2006,30(2):1-6. Qi Xu,Zeng Dewen,Shi Dajun,et al.Study on impacts of UHVDC transmission on power system stability[J].Power System Technology,2006,30(2):1-6(in Chinese).
|
[3] | 周红阳,刘映尚,余江,等.直流输电系统再启动功能改进措施[J].电力系统自动化,2008,32(19):104-107. Zhou Hongyang,Liu Yingshang,Yu Jiang,et al.Analysis and improvement of force restart function of HVDC transmission systems [J].Automation of Electric Power Systems,2008,32(19):104-107(in Chinese).
|
[4] | 张举.微型机继电保护原理[M].北京:中国水利水电出版社,2004:112-116.
|
[5] | 刘之尧,唐卓尧,张文峰,等.直流换相失败引起继电保护误动分析[J].电力系统自动化,2006,30(19):104-107. Liu Zhiyao,Tang Zhuoyao,Zhang Wenfeng,et al.Analysis of protective relaying mal-operation caused by commutation failure in HVDC[J].Automation of Electric Power Systems,2006,30(19):104-107(in Chinese).
|
[6] | 鲁德锋,毛为民,冼伟雄.直流换流站换流失败引起继电保护不正确动作的分析及防范措施探讨[J].电力设备,2006,7(1):54-56. Lu Defeng,Mao Weimin,Xian Weixiong.Discussion on incorrect action of protection caused by commutation failure in DC converter sation and its countermeasures[J].Electrical Equipment,2006,7(1):54-56(in Chinese).
|
[7] | 刘强,蔡泽祥,刘为雄,等.交直流互联电网暂态功率倒向及对继电保护的影响[J].电力系统自动化,2007,31(7):34-38. Liu Qiang,Cai Zexiang,Liu Weixiong,et al.Transient power converse in AC/DC interconnected power grid and its influence on protective relaying[J].Automation of Electric Power Systems,2007,31(7):34-38(in Chinese).
|
[8] | 邵震,王炳炎.直流输电换相失败对交流侧继电保护的影响[J].高电压技术,2006,32(9):42-45. Shao Zhen,Wang Bingyan.Analysis on influence of HVDC commutation failure on AC relay protection[J].High Voltage Engineering,2006,32(9):42-45(in Chinese).
|
[9] | 张保会,尹项根.电力系统继电保护[M].北京:中国电力出版社,2005:121-122.
|
[10] | 邱关源.电路[M].北京:高等教育出版社,1999:80-83.
|
[11] | 罗隆福,周金萍,李勇,等.HVDC换相失败典型暂态响应特性及其抑制措施[J].电力自动化设备,2008,28(4):5-9. Luo Longfu,Zhou Jinping,Li Yong,et al.Typical transient response of HVDC commutation failure and its countermeasures[J].Electric Power Automation Equiment,2008,28(4):5-9(in Chinese).
|
[12] | 郝跃东,倪汝冰.HVDC换相失败影响因素分析[J].高电压技术,2006,32(9):38-41. Hao Yuedong,Ni Rubing.Analysis on influence factors of commutation failure in HVDC[J].High Voltage Engineering,2006,32(9):38-41(in Chinese).
|
[13] | 欧开健,任震,荆勇.直流输电系统换相失败的研究(一):换相失败的影响因素分析[J].电力系统自动化设备,2003,23(5):5-8. Ou Kaijian,Ren Zhen,Jing Yong.Research on commutation failure in HVDC transmission system,part 1:Commutation failure factors analysis[J].Electric Power Automation Equipment,2003,23(5):5-8(in Chinese).
|
[14] | 任震,欧开健,荆勇.直流输电系统换相失败的研究(二):避免换相失败的措施[J].电力自动化设备,2003,23(6):6-9. Ren Zhen,Ou Kaijian,Jing Yong.Research on commutation failure in HVDC transmission system,part 2:Measures against commutation failure[J].Electric Power Automation Equipment,2003,23(6):6-9(in Chinese).
|
[15] | 何朝荣,李兴源,金小明,等.高压直流输电系统换相失败判断标准的仿真分析[J].电网技术,2007,31(1):20-24. He Chaorong,Li Xingyuan,Jin Xiaoming,et al.Simulation analysis on commutation failure criteria for HVDC transmission systems[J].Power System Technology,2007,31(1):20-24(in Chinese).
|
[16] | 刘云,李凤祁,王明新,等.葛南直流输电系统2006年运行及异常情况总结[J].电网技术,2007,31(24):7-11. Liu Yun,Li Fengqi,Wang Mingxin,et al.Operational situation and principal abnormal circumstance of ±500 kV HVDC power transmission system from Gezhouba to Nanqiao in 2006[J].Power System Technology,2007,31(24):7-11(in Chinese).
|
[17] | 朱韬析,王超.天广直流输电系统的基本控制策略[J].电网技术,2007,31(21):22-26. Zhu Taoxi,Wang Chao.Basic control strategy for HVDC transmission system from Tianshengqiao to Guangzhou[J].Power System Technology,2007,31(21):22-26(in Chinese).
|
[18] | 何朝荣,李兴源,金小明,等.高压直流输电换相失败的判据标准[J].电网技术,2006,30(22):19-53. He Chaorong,Li Xingyuan,Jin Xiaoming,et al.Criteria for commutation failure in HVDC transmission system[J].Power System Technology,2006,30(22):19-53(in Chinese).
|
[19] | 林凌雪,张尧,钟庆,等.多馈入直流输电系统中换相失败研究综述[J].电网技术,2006,30(17):40-46. Lin Lingxue,Zhang Yao,Zhong Qing,et al.A survey on commutation failures in multi-infeed HVDC transmission systems[J].Power System Technology,2006,30(17):40-46(in Chinese).
|