[1] | 麻常辉,薛禹胜,鲁庭瑞,等.输电规划方法的评述[J].电力系统自动化,2006,30(12):97-101. Ma Changhui,Xue Yusheng,Lu Tingrui,et al.A review of transmission planning methods[J].Automation of Electric Power Systems,2006,30(12):97-101(in Chinese).
|
[2] | 符杨,徐自力,曹家麟.混合粒子群优化算法在电网规划中的应用[J].电网技术,2008,32(15):31-35. Fu Yang,Xu Zili,Cao Jialin.Application of heuristic particle swarm optimization method in power network planning[J].Power System Technology,2008,32(15):31-35(in Chinese).
|
[3] | 王春娟,张伏生,王帅,等.基于混合优化算法的电网规划方法[J].电网技术,2005,29(23):30-33,39. Wang Chunjuan,Zhang Fusheng,Wang Shuai,et al.Power network planning method based on hybrid optimal algorithm[J].Power System Technology,2005,29(23):30-33,39(in Chinese).
|
[4] | 吴杰,刘健,卢志刚,等.适用于输电网网架规划的人工鱼群算法[J].电网技术,2007,31(18):63-67. Wu Jie,Liu Jian,Lu Zhigang,et al.Artificial fish swarm algorithm suitable to transmission network planning[J].Power System Technology,2007,31(18):63-67(in Chinese).
|
[5] | 杨高峰,康重庆,谷兴凯,等.电力市场中基于情景分析的电网规划方案适应性评估[J].电网技术,2006,30(14):64-70. Yang Gaofeng,Kang Chongqing,Gu Xingkai,et al.Scenario analysis based flexibility evaluation of power grid planning under deregulation[J].Power System Technology,2006,30(14):64-70(in Chinese).
|
[6] | 孙旭,任震.市场环境下电网优化规划的研究[J].电网技术,2006,30(3):41-44. Sun Xu,Ren Zhen.Study on optimum power grid planning in market environment[J].Power System Technology,2006,30(3):41-44(in Chinese).
|
[7] | 郑风雷,文福拴,吴复立.电力市场环境下的输电投资与扩展规划[J].电力系统自动化,2006,30(10):80-87. Zheng Fenglei,Wen Fushuan,Felix F Wu.Transmission investment and expansion planning in electricity market environment [J].Automation of Electric Power Systems,2006,30(10):80-87(in Chinese).
|
[8] | 王成山,王赛一.市场条件下电力系统规划工作的探讨[J].电力系统自动化,2005,29(9):82-86. Wang Chengshan,Wang Saiyi.Discussion on the power system planning in competitive electricity market[J].Automation of Electric Power Systems,2005,29(9):82-86(in Chinese).
|
[9] | 谢敏,陈金富,段献忠.考虑阻塞管理的一种启发式电网规划方法[J].电网技术,2005,29(4):66-69. Xie Min,Chen Jinfu,Duan Xianzhong.A heuristic transmission network planning method considering congestion management[J]. Power System Technology,2005,29(4):66-69(in Chinese).
|
[10] | Shrestha G B,Fonseka P A J.Congestion-driven transmission expansion in competitive power markets[J].IEEE Transactions on Power Systems,2004,19(3):1658-1665.
|
[11] | Finney J D,Othman H A,Rutz W L.Evaluating transmission congestion constraints in system planning[J].IEEE Transactions on Power Systems,1997,12(3):1143-1150.
|
[12] | Braga A S D,Saraiva J T.A Multiyear dynamic approach for transmission expansion planning and long-term marginal costs computation[J].IEEE Transactions on Power Systems,2005,20(3):1631-1639.
|
[13] | 李朝辉,魏贵臣.生态环境承载力评价方法研究及实例[J].环境科学与技术,2005,28(1):75-77. Li Zhaohui,Wei Guichen.Regional ecological capacity:evaluation and a case study[J].Environmental Science and Technology,2005,28(1):75-77.
|
[14] | 王俭,孙铁珩,李培军,等.环境承载力研究进展[J].应用生态学报,2005,16(4):768-772. Wang Jian,Sun Tieheng,Li Peijun,et al.Research progress on environmental carrying capacity[J].Chinese Journal of Applied Ecology,2005,16(4):768-772.
|
[15] | 国家电网公司.电力系统电压质量和无功电力管理办法[S].北京:中国水利水电出版社,2005.
|
[16] | Papalexopoulos A.Power system expansion planning and pricing in a deregulated environment[C].IEEE Power Engineering Society Summer Meeting,USA,2002.
|