[1] | 李洪东,冯义,刘中书.基于建设项目全寿命周期管理理念的金融输电权机制研究[J].电力建设,2008,29(4):24-27. Li Hongdong,Feng Yi,Liu Zhongshu.Research on financial transmission right mechanism based on construction items’whole- life cycle management idea[J].Electric Power Construction,2008,29(4):24-27(in Chinese).
|
[2] | 葛维平.电网建设项目应用全寿命周期成本控制分析[J].电力建设,2009,30(7):92-94. Ge Weiping.Discussion about full-life cycle cost control for power grid construction project[J].Electric Power Construction,2009,30(7):92-94(in Chinese).
|
[3] | 王德海,张晓婉,赵维宁.现代项目管理理论与方法[M].北京:中国农业出版社,1998:5-8.
|
[4] | 殷可,郁东升.全寿命周期成本(LCC)在变电站主设备招标采购中的研究与实践[J].华东电力,2009,37(3):436-439. Yin Ke,Yu Dongsheng.Application of life cycle cost to bid-invitation and purchase of main substation equipment[J].East China Electric Power,2009,37(3):436-439(in Chinese).
|
[5] | 任国强,董士波.全生命周期工程造价管理及其计算机实现[R].天津:天津理工学院,1994.
|
[6] | DL/T 5218—2005 220~500kV变电所设计技术规程[S].
|
[7] | 赵宪博,许巧祥.城市轨道交通项目全生命周期设计理念研究[J].城市轨道交通研究,2009(7):9-12. Zhao Xianbo,Xu Qiaoxiang.Life-cycle design concept for urban mass transit projects[J].Urban Mass Transit,2009(7):9-12(in Chinese).
|
[8] | 褚农,卫银忠,赵本林.建设初期500 kV主接线可靠性分析论证[J].电力建设,2004,25(4):21-27. Chu Nong,Wei Yinzhong,Zhao Benlin.Analysis and demonstration of reliability of 500 kV main wiring at the first stage of construction[J].Electric Power Construction,2004,25(4):21-27(in Chinese).
|
[9] | 郭永基.电力系统可靠性原理和应用[M].北京:清华大学出版社,1986:42-47.
|
[10] | Billiton R,Chen Hua,Zhou Jiaqi.Generalized n + 2 state system Markov model for station-oriented reliability evaluation[J].IEEE Trans on Power Systems,1997,12(4):1511-1517.
|
[11] | 谢开贵,董百强,赵霞,等.大型(变)电站电气主接线可靠性综合分析系统[J].电力系统自动化,2006,30(15):89-92. Xie Kaigui,Dong Baiqiang,Zhao Xia,et al.Design and application of reliability evaluation software for power stations[J].Automation of Electric Power Systems,2006,30(15):89-92(in Chinese).
|
[12] | 黎红梅,苑舜.变电所电气主接线可靠性分析方法的研究[J].东北电力技术,2008(1):15-22. Li Hongmei,Yuan Shun.A study on analyzing method of main electrical wiring reliability[J].Northeast Electric Power Technology,2008(1):15-22(in Chinese).
|
[13] | 张鹏,郭永基.电气主接线可靠性评估的区间方法[J].电力系统自动化,2004,28(19):48-52. Zhang Peng,Guo Yongji.Interval method for power station and substation reliability evaluation[J].Automation of Electric Power Systems,2004,28(19):48-52 (in Chinese).
|
[14] | 李涛,马薇,黄晓蓓.基于全寿命周期成本理论的变电设备管理[J].电网技术,2008,32(11):50-53. Li Tao,Ma Wei,Huang Xiaobei.Power transformation equipment management based on life cycle cost theory[J].Power System Technology,2008,32(11):50-53(in Chinese).
|
[15] | 史京楠,韩红丽,徐涛.全寿命周期成本分析在变电工程规划设计中的应用[J].电网技术,2009,33(9):63-66. Shi Jingnan,Han Hongli,Xu Tao.Application of life cycle costs analysis in planning design of power transformation projects [J].Power System Technology,2009,33(9):63-66(in Chinese).
|