[1] | Liu Yongmei,Sheng Wanxing.Optimization model for distribution equipment maintenance scheduling based on network topology and genetic algorithm[J].Power System Technology,2007,31(21):11-15(in Chinese).
|
[2] | Kim H,Hayashi Y,Nara K.An algorithm for thermal unit maintenance scheduling through combined use of GA,SA and TS[J].IEEE Trans on Power Apparatus and Systems,1997,12(1):329-335.
|
[3] | 陈根军,唐国庆.基于禁忌搜索与蚁群最优结合算法的配电网规划[J].电网技术,2005,29(2):23-27.
|
[4] | Chen Genjun,Tang Guoqing.Tabu search-ant colony optimization hybrid algorithm based distribution network planning[J].Power System Technology,2005,29(2):23-27(in Chinese).
|
[5] | Burke E K,Smith A J.Hybrid evolutionary techniques for the maintenance scheduling problem[J].IEEE Trans on Power Systems,2000,15(1):122-128.
|
[6] | Yare Y,Venayagamoorthy G K,Aliyu U O.Optimal generator maintenance scheduling using a modified discrete PSO[J].Generation,Transmission & Distribution,2008,2(6):834-846.
|
[7] | Chen Luonan,Junichi Toyoda.Optimal generating unit maintenance scheduling for multi-area system with network constraints[J].IEEE Trans on Power Systems,1991,6(3):1168-1174.
|
[8] | Yellen J,Al-Khamis T M,Vemuri S,et al.A decomposition approach to unit maintenance scheduling[J].IEEE Trans on Power Systems,1992,7(2):726-733.
|
[9] | Silva E L da,Morozowski M,Fonseca L G S,et al.Transmission constrained maintenance scheduling of generating units:a stochastic programming approach[J].IEEE Trans on Power System,1995,10(2):695-701.
|
[10] | Silva E L da,Schilling M T,Rafael M C.Generation maintenance scheduling considering transmission constraints[J].IEEE Trans on Power Systems,2000,15(2):838-843.
|
[11] | Marwali M K C,Shahidehpour S M.Integrated generation and transmission maintenance scheduling with network constraints[J].IEEE Trans on Power Systems,1998,13(3):1063-1068.
|
[12] | Marwali M K C,Shahidehpour S M.Long-term transmission and generation maintenance scheduling with network,fuel and emission constraints[J].IEEE Trans on Power Systems,1999,14(3):1160-1165.
|
[13] | 丁明,冯永青,发输电设备联合检修安排模型及算法研究[J].中国电机工程学报,2004,24(5):18-23.
|
[14] | Ding Ming,Feng Yongqing.Research on the modeling and algorithm to global generator and transmission maintenance scheduling[J].Proceedings of the CSEE,2004,24(5):18-23(in Chinese).
|
[15] | El-Sharkh M Y,El-Keib A A.Maintenance scheduling of generation and transmission system using fuzzy evolutionary programming[J].IEEE Trans on Power Systems,2003,18(2):862-866.
|
[16] | Bard J F.Some properties of the bilevel programming problem[J]. Journal of Optimization Theory and Applications,1991,68(2):371-378.
|
[17] | Grigg C.A report prepared by the reliability test system task force of the application of probability methods subcommittee[J].IEEE Trans on Power Systems,1999,14(3):1010-1020.
|
[18] | Christiaanse W R,Palmer A H.A technique for the automated scheduling of the maintenance of generating facilities[J].IEEE Trans on Power Apparatus and systems,1972,91(1):137-144.
|
[19] | Garver L L.Adjusting maintenance schedules to levelize risk[J].IEEE Trans on Power Apparatus and Systems,1972,91(5):2057-2063.
|
[20] | Dopazo J F,Merrill H M.Optimal generator maintenance scheduling using integer programming[J].IEEE Trans on Power Apparatus and Systems,1975,94(5):1537-1545.
|
[21] | 陈竟成,于尔铿,刘广一,等 检修计划新模型与算法的研究[J].电网技术,1997,21(11):66-69.
|
[22] | Chen Jingcheng,Yu Erkeng,Liu Guangyi,et al.Research of a new optimization module and algorithm for maintenance scheduling problem[J].Power System Technology,1997,21(11):66-69(in Chinese).
|
[23] | 陈爱东,龚乐年.模糊动态规划法在变电站电压无功控制中的应用[J].电网技术,2001,25(6):29-32.
|
[24] | Chen Aidong,Gong Lenian.Application of fuzzy dynamic programming (FDP) to reactive power and voltage control in a distribution substation[J].Power System Technology,2001,25(6):29-32(in Chinese).
|
[25] | 刘科研,盛万兴,李运华.基于改进遗传模拟退火算法的无功优化[J].电网技术,2007,31(3):13-18.
|
[26] | Liu Keyan,Sheng Wanxing.Li Yunhua.Research on reactive power optimization based on improved genetic simulated annealing algorithm[J].Power System Technology,2007,31(3):13-18(in Chinese).
|
[27] | 刘永梅,盛万兴.基于网络拓扑和遗传算法的配电设备检修计划优化模型[J].电网技术,2007,31(21):11-15.
|
[28] | Wang Yuping,Jiao Yongchang.An evolutionary algorithm for solving nonlinear bilevel programming based on a new constraint-handling scheme[J].IEEE Trans on Systems,Man and Cybernetics-Part C,2005,35(2):221-232.
|