[1] | 孙元章,吴俊,李国杰,等.基于风速预测和随机规划的含风电场电力系统动态经济调度[J].中国电机工程学报,2009,29(4):41-47.
|
[2] | Sun Yuanzhang,Wu Jun,Li Guojie,et al.Dynamic economic dispatch considering wind power penetration based on wind speed forecasting and stochastic programming[J].Proceedings of the CSEE,2009,29(4):41-47(in Chinese).
|
[3] | 鲍爱霞.大规模风电场容量可信度的分析及对华东电网备用的影响[J].中国电机工程学报,2009,29(增刊):34-38.
|
[4] | Bao Aixia.Analysis and research for capacity credit of large scale wind farms and influence on reserve capacity of east China electric power grid[J].Proceedings of the CSEE,2009,29(Supplement):34-38(in Chinese).
|
[5] | Ronan D,Mark O.A new approach to quantify reserve demand in systems with significant installed wind capacity[J].IEEE Trans on Power Systems,2005,20(2):587-595.
|
[6] | 李蒙,王静,胡兆光.用电负荷率同供电煤耗关系的定量分析[J].中国电力,2005,11(38):40-42.
|
[7] | Li Meng,Wang Jing,Hu Zhaoguang.Quantitative analysis between load factor and coal consumption of electricity supply[J].Electric Power,2005,11(38):40-42(in Chinese).
|
[8] | 肖立业.超导电力技术的现状和发展趋势[J].电网技术,2004,28(9):33-41.
|
[9] | Xiao Liye.Present station and development trend of superconducting power technology[J].Power System Technology,2004,28(9):33-41(in Chinese).
|
[10] | Ribeiro P F,Johnson B K,Crow M L,et al.Energy storage systems for advanced power applications[J].Proceedings of the IEEE,2001,89(12):1744-1756.
|
[11] | 张坤民,潘家华,崔大鹏.低碳经济论[M].北京:中国环境科学出版社,2009:1-10.
|
[12] | 中国科学院可持续发展战略研究组.2009中国可持续发展战略报告:探索中国特色的低碳道路[M].北京:科学出版社,2009:1-10.
|
[13] | 康重庆,陈启鑫,夏清.低碳电力技术的研究展望[J].电网技术,2009,33(2):1-7.
|
[14] | Kang Chongqing,Chen Qixin,Xia Qing.Prospects of low-carbon electricity[J].Power System Technology,2009,33(2):1-7(in Chinese).
|
[15] | Tooraj J,William J N,Michael G P.Future electricity technologies and systems[R].Cambridge:Cambridge University Press,2006.
|
[16] | 张宁,周天睿,段长刚,等.大规模风电场接入对电力系统调峰的影响[J].电网技术,2010,34(1):152-158.
|
[17] | Zhang Ning,Zhou Tianrui,Duan Changgang,et al.Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J].Power System Technology,2010,34(1):152-158(in Chinese).
|
[18] | 张红光,张粒子,陈树勇,等.大容量风电场接入电网的暂态稳定特性和调度对策研究[J].中国电机工程学报,2007,27(31):45-51.
|
[19] | Zhang Hongguang,Zhang Lizi,Chen Shuyong,et al.Studies on the transient behavior and dispatching strategy of power system integrated with large scale wind farms[J].Proceedings of the CSEE,2007,27(31):45-51(in Chinese).
|
[20] | 吴杰康,陆文玲.基于效益分析的水火电力系统短期优化调[J].电网技术,2009,33(18):25-31.
|
[21] | Wu Jiekang,Lu Wenling.An efficiency analysis based short-term optimal scheduling for hydrothermal power system[J].Power System Technology,2009,33(18):25-31(in Chinese).
|
[22] | 李俊峰,高虎,王仲颖,等.2008中国风电发展报告[M].北京:中国环境科学出版社,2008:1-30.
|
[23] | 国家电力监管委员会.电力监管年度报告2008[R].北京:国家电力监管委员会,2009.
|