[1] | 崔杨,穆钢,刘玉,等.风电功率波动的时空分布特性[J].电网技术,2011,35(2):110-114.
|
[2] | Cui Yang,Mu Gang,Liu Yu,et al.Spatiotemporal distribution characteristic of wind power fluctuation[J].Power System Technology,2011,35(2):110-114(in Chinese).
|
[3] | 卫蜀作,蔡邠.中国电网高速发展与可再生能源发电的关系[J].电网技术,2008,32(5):26-30.
|
[4] | Wei Shuzuo,Cai Bin.Relations between rapid development of power grids in China and power generation by renewable energy resources [J].Power System Technology,2008,32(5):26-30(in Chinese).
|
[5] | Subramanian V V,Mike D.Investigating smart grid solutions to integrate renewable sources of energy into the electric transmission grid[C]//2009 International Conference on UHV Transmission.Beijing,China:State Grid Corporation of China,2009:5-9.
|
[6] | 陈炳森,胡华丽.我国风电发展概况及展望[J].电网技术,2008,32(S2):272-275.
|
[7] | Chen Bingsen,Hu Huali.General situation and prospect of wind power in China[J].Power System Technology,2008,32(S2):272-275(in Chinese).
|
[8] | 姚卫江.欧洲风力发电的启示[J].电网技术,2008,32(S2):276-278.
|
[9] | Yao Weijiang.Thinking on Europe wind power[J].Power System Technology,2008,32(S2):276-278(in Chinese).
|
[10] | 谢瑛,谭忠富,程晋,等.节能减排调度环境下燃煤电厂发电成本分析[J].电网技术,2011,35(2):137-142.
|
[11] | Xie Ying,Tan Zhongfu,Cheng Jin,et al.Generation cost analysis of coal-fired power plant in environment of energy saving and emission reduction dispatching[J].Power System Technology,2011,35(2):137-142(in Chinese).
|
[12] | Huang Mingyuan,Janaki R R,Alavalapati D R,et al.Is the choice of renewable portfolio standards random[J].Energy Policy,2007,35(11):5571-5575.
|
[13] | Elaine K,Hart M,Jacobson Z.A Monte Carlo approach to generator portfolio planning and carbon emissions assessments of systems with large penetrations of variable renewable[J].Renewable Energy,2011,36(8):2278-2286.
|
[14] | Luo Guoliang,Zhang Yuanmin.Study on investment optimization for power grid construction projects[C]//The 1st International Conference on Information Science and Engineering.Nanjing,China:ICISE,2009:5150-5153.
|
[15] | Wang Mianbin,Tan Zhoufu,Zhang Liying,et al.Power grid investment risk evaluation model based on set-pair analysis theory in power market[J].Proceedings of the CSEE,2010,30(19):91-99(in Chinese).
|
[16] | 赵文会,王炜,施泉生,等.基于条件风险价值的动态多阶段电力资产配置模型[J].电网技术,2009,33(7):77-82.
|
[17] | Zhao Wenhui,Wang Wei,Shi Quansheng,et al.Dynamic multi-stage optimization configuration model for electricity assets based on conditional value at risk[J].Power System technology,2009,33(7):77-82(in Chinese).
|
[18] | 董军,马博.考虑社会效益的电网最优投资组合模型研究[J].运筹与管理,2010,19(4):131-135.
|
[19] | Dong Jun,Ma Bo.Study of an optimal portfolio model for electric grid projects with social benefits[J].Operations Research and Management Science,2010,19(4):131-135(in Chinese).
|
[20] | 柴忠信.发电企业成本管理与分析[M].北京:中国电力出版社,2011:1-30.
|
[21] | 曾鸣,田廓,鄢帆,等.电力市场中考虑灵活性措施的发电投资决策分析[J].电网技术,2010,34(11):151-155.
|
[22] | Zeng Ming,Tian Kuo,Yan Fan,et al.Analysis on investment decision of power generation project in electricity market considering flexible tactics[J].Power System Technology,2010,34(11):151-155(in Chinese).
|
[23] | 郑雅楠,周明,李庚银.大用户购电组合决策模型及对比分析[J].电网技术,2011,35(3):188-194.
|
[24] | Zheng Yanan,Zhou Ming,Li Gengyin.Decision-making models for large consumer electricity purchasing portfolio and contrastive analysis on them[J].Power System Technology,2011,35(3):188-194(in Chinese).
|
[25] | 韩涛,卢继平,乔梁,等.大型并网风电场储能容量优化方案[J].电网技术,2010,34(1):169-173.
|
[26] | Han Tao,Lu Jiping,Qiao Liang,et al.Optimized scheme of energy-storage capacity for grid-connected large-scale wind farm[J].Power System Technology,2010,34(1):169-173(in Chinese).
|
[27] | 王绵斌,谭忠富,张丽英,等.市场环境下电网投资风险评估的集对分析方法[J].中国电机工程学报,2010,30(19):91-99.
|