[1] | 迟永宁,刘燕华,王伟胜,等.风电接入对电力系统的影响[J].电网技术,2007,31(3):77-81.
|
[2] | Chi Yongning,Liu Yanhua,Wang Weisheng,et al.Study on impact of wind power integration on power system[J].Power System Technology,2007,31(3):77-81(in Chinese).
|
[3] | 陈炳森,胡华丽.我国风电发展概况及展望[J].电网技术,2008,32(增刊2):272-275.
|
[4] | Chen Bingsen,Hu Huali.General situation and prospect of wind power in China[J].Power System Technology,2008,32(S2):272-275(in Chinese).
|
[5] | 孙元章,吴俊,李国杰.风力发电对电力系统的影响[J].电网技术,2007,31(20):55-62.
|
[6] | Sun Yuanzhang,Wu Jun,Li Guojie.Influence research of wind power generation on power systems[J].Power System Technology,2007,31(20):55-62(in Chinese).
|
[7] | 张丽英,叶廷路,辛耀中,等.大规模风电接入电网的相关问题及措施[J].中国电机工程学报,2010,30(25):1-9.
|
[8] | Zhang Liying,Ye Tinglu,Xin Yaozhong,et al.Problems and measures of power grid accommodating large scale wind power[J].Proceedings of the CSEE,2010,30(25):1-9(in Chinese).
|
[9] | 吴义纯,丁明.风电引起的电压波动与闪变的仿真研究[J].电网技术,2009,33(20):125-130.
|
[10] | Wu Yichun,Ding Ming.Simulation study on voltage fluctuations and flicker caused by wind farms[J].Power System Technology,2009,33(20):125-130(in Chinese).
|
[11] | 李渝,范高锋,李庆,等.达坂城风电接入系统对新疆电网电能质量的影响[J].电网技术,2007,31(6):88-92.
|
[12] | Li Yu,Fan Gaofeng,Li Qing,et al.The impact of Dabancheng wind farm integration on power quality of Xinjiang power grid[J].Power System Technology,2007,31(6):88-92(in Chinese).
|
[13] | 廖萍,李兴源.风电场穿透功率极限计算方法综述[J].电网技术,2008,32(10):50-53.
|
[14] | Liao Ping,Li Xingyuan.A survey on calculation methods of wind power penetration limit[J].Power System Technology,2008,32(10):50-53(in Chinese).
|
[15] | 王承煦,张源.风力发电[M].北京:中国电力出版社,2003:158-165.
|
[16] | Luo Changling,Far H G,Banakar H,et al.Estimation of wind penetration as limited by frequency deviation[J].IEEE Trans on Energy Conversion,2007,22(3):783-791.
|
[17] | 张义斌,王伟胜,戴慧珠.基于P-V曲线的风电场接入系统稳态分析[J].电网技术,2004,28(23):61-65.
|
[18] | Zhang Yibin,Wang Weisheng,Dai Huizhu.P-V curve based static analysis for integration of wind farm into power system[J].Power System Technology,2004,28(23):61-65(in Chinese).
|
[19] | 韩小琪,孙寿广,戚庆茹.从系统调峰角度评估电网接纳风电能力[J].中国电力,2010,43(6):16-19.
|
[20] | Han Xiaoqi,Sun Shouguang,Qi Qingru.Evaluation of wind power penetration limit from peak regulation[J].Electrical Power,2010,43(6):16-19(in Chinese).
|
[21] | 赵海翔,关宏亮,范高锋,等.基于静态安全和稳定约束的地区电网接入风电容量算法[J].中国电力,2007,40(3):79-83.
|
[22] | Zhao Haixiang,Guan Hongliang,Fan Gaofeng,et al.A calculation method ofmaximum wind power integrated into the regional grid based on static secur ity and stability constraints[J].Electrical Power,2007,40(3):79-83(in Chinese).
|
[23] | 申洪,梁军,戴慧珠.基于电力系统暂态稳定分析的风电场穿透功率极限计算[J].电网技术,2002,26(8):8-11.
|
[24] | Shen Hong,Liang Jun,Dai Huizhu.Calculation of wind farm penetration based on power system transient stability analysis[J].Power System Technology,2002,26(8):8-11(in Chinese).
|
[25] | 雷亚洲,王伟胜,印永华,等.一种静态安全约束下确定电力系统风电准入功率极限的优化方法[J].中国电机工程学报,2001,21(6):25-28.
|
[26] | Lei Yazhou,Wang Weisheng,Yin Yonghua,et al.An optimization method for determining wind power penetration limit in power system under static security constraints[J].Proceedings of the CSEE,2001,21(6):25-28(in Chinese).
|
[27] | 雷亚洲,王伟胜,印永华,等.基于机会约束规划的风电穿透功率极限计算[J].中国电机工程学报,2002,22(5):32-35.
|
[28] | Lei Yazhou,Wang Weisheng,Yin Yonghua,et al.Wind power penetration limit calculation based on chance constrained programming[J].Proceedings of the CSEE,2002,22(5):32-35(in Chinese).
|
[29] | 吴俊,李国杰,孙元章.基于随机规划的并网风电场最大注入功率计算[J].电网技术,2007,31(14):15-19.
|
[30] | Wu Jun,Li Guojie,Sun Yuanzhang.Maximum injection power calculation of wind farms connected to power systems based on probabilistically programming[J].Power System Technology,2007,31(14):15-19(in Chinese).
|
[31] | 孙保功,叶鹏,邵广惠,等.基于非线性内点方法的风电接入能力研究[J].中国电机工程学报,2010,30(10):23-28.
|
[32] | Sun Baogong,Ye Peng,Shao Guanghui,et al.Wind power penetration limit assessment based on nonlinear interior point algorithm[J].Proceedings of the CSEE,2010,30(10):23-28(in Chinese).
|
[33] | 乔嘉赓,徐飞,鲁宗相,等.基于相关机会规划的风电并网容量优化分析[J].电力系统自动化,2008,32(10):84-87.
|
[34] | Qiao Jiageng,Xu Fei,Lu Zongxiang,et al.Optimization analysis model of grid-connected wind capacity based on dependent chance programming[J].Automation of Electric Power Systems,2008,32(10):84-87(in Chinese).
|
[35] | 严干贵,王茂春,穆钢,等.双馈异步风力发电机组联网运行建模及其无功静态调节能力研究[J].电工技术学报,2008,23(7):98-104.
|
[36] | Yan Gangui,Wang Maochun,Mu Gang,et al.Modeling of grid-connected doubly-fed induction generator for reactive power static regulation capacity study[J].Transactions of China Electrotechnical Society,2008,23(7):98-104(in Chinese).
|
[37] | 刘宝碇,赵瑞清.随机规划与模糊规划[M].北京:清华大学出版社,1998:74-94.
|
[38] | 肖宁,曾建潮.基于随机模拟与PSO算法相结合的随机机会约束规划算法[J].计算机应用与软件,2009,26(4):40-41.
|
[39] | Xiao Ning,Zeng Jianchao.Algorithm of probabilistically chance-constrained programming based on combination of random simulation and PSO algorithm[J].Computer Applications and Software,2009,26(4):40-41(in Chinese).
|
[40] | Kennedy J,Eberhart R C.Particle swarm optimization[C]//Proceedings of IEEE International Conference on Neural Networks.Perth,WA,Australia:IEEE,1995:1942-1948.
|
[41] | 李丽,牛奔.粒子群优化算法[M].北京:冶金工业出版社,2009:1-30.
|
[42] | Eknath V,McCalley J D,Ajjarapu V,et al.Wind penetration limited by thermal constraints and frequency stability[C]//The 39th North American Power Symposium.Las Cruces,USA:Power Engineering Society,2007:353-359.
|