迟永宁,王伟胜,戴慧珠.改善基于双馈感应发电机的并网风电场暂态电压稳定性研究[J].中国电机工程学报,2007,27(25):22-31. Chi Yongning,Wang Weisheng,Dai Huizhu.Study on transient voltage stability enhancement of grid-connected wind farm with doubly fed induction generator installations[J].Proceedings of the CSEE,2007,27(25):25-31(in Chinese).
[2]
张红光,张粒子,陈树勇.大容量风电场接入电网的暂态稳定特性和调度对策研究[J].中国电机工程学报,2007,27(31):45-51. Zhang Hongguang,Zhang Lizi,Chen Shuyong.Studies on the transient behavior and dispatching strategy of power system integrated with large scale wind farms[J].Proceedings of the CSEE,2007,27(31):45-51(in Chinese).
[3]
吴俊玲,周双喜,孙建锋,等.并网风力发电场的最大注入功率分析[J].电网技术,2004,28(20):22-26. Wu Junling,Zhou Shuangxi,Sun Jianfeng,et al.Analysis on maximum power injection of wind farm connected to power system[J].Power System Technology,2004,28(20):22-26(in Chinese).
[4]
李建丽,李黎黎.大规模风电场并网的电压稳定性问题探讨[J].太阳能,2006,27(6):48-50. Li Jianli,Li Lili.The voltage stability problem study of large scale wind farm on grid[J].Solar Energy,2006,27(6):48-50(in Chinese).
[5]
申洪,梁军,戴慧珠.基于电力系统暂态稳定分析的风电场穿透功率极限计算[J].电网技术,2002,26(8):8-11. Sheng Hong,Liang Jun,Dai Huizhu.Wind power panetration limit calculation based on power system transient stability analysis [J].Power System Technology,2002,26(8):8-11(in Chinese).
[6]
雷亚洲,王伟胜,印永华,等.基于机会约束规划的风电穿透功率极限计算[J].中国电机工程学报,2002,22(8):32-35. Lei Yazhou,Wang Weisheng,Yin Yonghua,et al.Wind power panetration limit calculation based on opportunity restrain program [J].Proceedings of the CSEE,2002,22(8):32-35(in Chinese).
[7]
李晶,王伟胜,宋家骅.双馈感应发电机的线性化动态模型及运行特性分析[J].电网技术,2004,28(13):13-17. Li Jing,Wang Weisheng,Song Jiahua.Linearized dynamic model of doubly-fed induction generator and analysis of its operating performance[J].Power System Technology,2004,28(13):13-17(in Chinese).
[8]
戴慧珠,王伟胜,迟永宁.风电接入电力系统研究的新进展[J].电网技术,2007,31(20):17-23. Dai Huizhu,Wang Weisheng,Chi Yongning.Recent wind power integration study in China[J].Power System Technology,2007,31(20):17-23(in Chinese).
[9]
廖萍,李兴源.风电场穿透功率极限计算方法综述[J].电网技术,2008,32(10):50-53. Liao Ping,Li Xingyuan.A survey on calculation methods of wind power penetration limit[J].Power System Technology,2008,32(10):50-53(in Chinese).
[10]
Zhang Xinyan,Wang Weiqing.Voltage transient study of wind farm under power system fault[C].2008 IEEE International Conference on Sustainable Energy Technology,Singapore,2008.
Tomonobu S,Ryoeei S.Output power control of wind turbine generator by pitch angle control using minimum variance control[J].Electrical Engineering in Japan,2006,154(2):1455-1463.
[13]
Muller S,Deicke M,De Doncker R W.Doubly fed induction generator system for wind turbines[J].IEEE Industry Applications Magazine,2002,8(3):26-33.
[14]
陈金富,陈海焱,段献忠.含大型风电场的电力系统多时段动态优化潮流[J].中国电机工程学报,2006,26(3):31-35. Chen Jinfu,Chen Haiyan,Duan Xianzhong.Multi-period dynamic optimal power flow in wind power integrated system[J].Proceedings of the CSEE,2006,26(3):31-35(in Chinese).
[15]
Lubosny Z.Wind turbine operation in electric power systems [M].Springer of Germany,2004:32-50.
[16]
郑国强,鲍海,陈树勇.基于近似线性规划的风电场穿透功率极限优化的改进算法[J].中国电机工程学报,2004,24(10):68-71. Zheng Guoqiang,Bao Hai,Chen Shuyong.Amending algorithm for wind farm penetration optimization based on approximation linear programming method[J].Proceedings of the CSEE,2004,24(10):68-71(in Chinese).