介绍了巴西电网“11.10”大停电事故的发生、发展过程,指出极端天气引发的多重故障、继电保护存在的缺陷、安稳控制和第3道防线的措施不足、受端系统电压崩溃是导致此次大停电的主要原因。巴西电网在运行特性上与南方电网有诸多类似之处,结合南方电网实际,总结了此次大停电事故的经验教训。

References

[1]  李春艳,孙元章,陈向宜,等.西欧“11.4”大停电事故的初步分析及防止我国大面积停电事故的措施[J].电网技术,2006,30(24):16-21.
[2]  薛禹胜.综合防御由偶然故障演化为电力灾难:北美“8.14”大停电的警示[J].电力系统自动化,2003,27(18):1-5.
[3]  Xue Yusheng.The way from a simple contingency to system-wide disaster: lessons from the Eastern interconnection blackout in 2003[J].Automation of Electric Power Systems,2003,27(18):1-5(in Chinese).
[4]  印永华,郭剑波,赵建军,等.美加“8.14”大停电事故初步分析以及应吸取的教训[J].电网技术,2003,27(10):8-11.
[5]  Yin Yonghua,Guo Jianbo,Zhao Jianjun,et al.Preliminary analysis of large scale blackout in interconnected North America power system grid on August 14 and lessons to be drawn[J].Power System Technology,2003,27(10):8-11(in Chinese).
[6]  何大愚.一年以后对美加“8.14”大停电事故的反思[J].电网技术,2004,28(21):1-5.
[7]  He Dayu.Rethinking over“8.14”US-Canada blackout after one year[J].Power System Technology,2004,28(21):1-5(in Chinese).
[8]  甘德强,胡江溢,韩桢祥.2003年国际若干停电事故思考[J].电力系统自动化,2004,28(3):1-4.
[9]  Gan Deqiang,Hu Jiangyi,Han Zhenxiang.Thinking over several blackouts in 2003[J].Automation of Electric Power Systems,2004,28(3):1-4(in Chinese).
[10]  Li Chunyan,Sun Yuanzhang,Chen Xiangyi,et al.Preliminary analysis of large scale blackout in Western Europe Power Grid on November 4 and measures to prevent large scale blackout in China [J].Power System Technology,2006,30(24):16-21(in Chinese).
[11]  葛睿,董昱,吕跃春.欧洲“11.4”大停电事故分析及其对我国电网运行工作的启示[J].电网技术,2007,31(2):1-6.
[12]  Ge Rui,Dong Yu,Lü Yuechun.Analysis of large-scale blackout in UCTE power grid and lessons to be drawn to power grid operation in China[J].Power System Technology,2007,31(2):1-6(in Chinese).
[13]  Gomes P.New strategies to improve bulk power system security: lessons learned from large blackouts [C].Power Engineering Society General Meeting,Denver,USA,2004.
[14]  Gomes P.Brazilian defense plan against extreme contingencies[C]. CIGRE/IEEE PES International Symposium,Montreal,Canada,2003.
[15]  毛晓明,吴小辰.南方交直流并联电网运行问题分析[J].电网技术,2004,28(2):1-6.
[16]  Mao Xiaoming,Wu Xiaochen.Analysis on operational problems in South China AC-DC hybrid power grid[J].Power System Technology,2004,28(2):1-6(in Chinese).
[17]  Report ONS RE3 252/2009.Analysis disruption of the day 10/11/2009 at the 22h13m involving the Shutdown of three circuits LT 765 kV Itaberá-Ivaipor?[R].Brazil ONS,2009.
[18]  南方电网技术研究中心.2009年11月10日巴西大停电事故分析报告[R].广州:南方电网技术研究中心,2010.
[19]  袁季修.防御大停电的广域保护和紧急控制[M].北京:中国电力出版社,2007:34-76.
[20]  王梅义.失步发电机组的再同步机理[J].南方电网技术,2007,1(2):6-12.
[21]  Wang Meiyi.Mechanism of the resynchronization of out-of-step generator sets[J].Southern Power System Technology,2007,1(2):6-12(in Chinese).
[22]  苏盛,李银红,段献忠.电网故障自组织临界性及其在应对极端天气中的应用[J].科学通报,2009,54(3):387-394.
[23]  Su Sheng,Li Yinhong,Duan Xianzhong.Self-organized criticality of power system faults and its application in adaptation to extreme climate[J].Chinese Science Bulletin,2009,54(3):387-394(in Chinese).
[24]  蒙定中.防止广东电网大停电的建议[J].广东电力,2005,18(3):1-12.
[25]  Meng Dingzhong.Recommendations to prevent Guangdong power system cascading blackout[J].Guangdong Electric Power,2005,18(3):1-12(in Chinese).
[26]  Gomes P.Guidelines for power system restoration in the Brazilian system[J].IEEE Trans on Power Systems,2004,19(2):1159-1164.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133