[1] | 谭忠富,陈广娟,赵建保,等.以节能调度为导向的发电侧与售电侧峰谷分时电价联合优化模型[J].中国电机工程学报,2009,29(1):55-62.
|
[2] | Tan Zhongfu,Chen Guangjuan,Zhao Jianbao,et al.Optimization model for designing peak-valley time-of-use power price of generation side and sale side at the direction of energy conservation dispatch[J].Proceedings of the CSEE,2009,29(1):55-62(in Chinese).
|
[3] | 尚金成.节能发电调度的经济补偿机制研究(一):基于行政手段的经济补偿机制设计与分析[J].电力系统自动化,2009,33(2):46-48.
|
[4] | Shang Jincheng.Research on economic compensation mechanism for energy-saving generation dispatch part one: design and analysis of economic compensation mechanism based on administrative means [J].Automation of Electric Power Systems,2009,33(2):46-48(in Chinese).
|
[5] | 尚金成.节能发电调度的经济补偿机制研究(二):基于市场机制的经济补偿机制设计与分析[J].电力系统自动化,2009,33(3):46-50.
|
[6] | Shang Jincheng.Research on economic compensation mechanism for energy-saving generation dispatch part two: design and analysis of economic compensation mechanism based on market mechanism [J].Automation of Electric Power Systems,2009,33(3):46-50(in Chinese).
|
[7] | 尚金成,刘志都.节能发电调度协调理论及应用[J].电力自动化设备,2009,29(6):109-114.
|
[8] | Shang Jincheng,Liu Zhidu.Coordination theory of energy-saving generation dispatch and its application[J].Automation of Electric Power Systems,2009,29(6):109-114(in Chinese).
|
[9] | Wang Lingfeng,Singh Chanan.Reserve-constrained multi-area environmental/economic dispatch based on particle swarm optimization with local search[J].Engineering Applications of Artificial Intelligence,2009,22(2):298-307.
|
[10] | Duo Hanzheng,Sasaki H,Nagata T,et al.A solution for unit commitment using Lagrangian relaxation combined with evolutionary programming[J].Electric Power Systems Research,1999,51(1):71-77.
|
[11] | 余廷芳,林中达.部分解约束改进遗传算法在火电厂机组负荷优化分配中的应用[J].中国电机工程学报,2009,29(2):107-112.
|
[12] | Yu Tingfang,Lin Zhongda.Application of float genetic algorithms-partially solved combined with punishing function in power plant units commitment problem[J].Proceedings of the CSEE,2009,29(2):107-112(in Chinese).
|
[13] | Silva J I,Sandoval C J,Edimar J O,et al.A Lagrangian multiplier based sensitive index to determine the unit commitment of thermal units[J].International Journal of Electrical Power & Energy Systems,2008,30(9):504-510.
|
[14] | Dieu V N,Weerakorn O.Ramp rate constrained unit commitment by improved priority list and augmented Lagrange Hopfield network [J].Electric Power Systems Research,2008,78(3):291-301.
|
[15] | 吴金华,吴耀武,熊信艮.机组组合问题的扩展Hopfield神经网络算法[J].电力系统自动化,2003,27(7):41-44.
|
[16] | Wu Jinhua,Wu Yaowu,Xiong Xinyin.Optimization of unit commitment by improved Hopfield neural network algorithm [J].Automation of Electric Power Systems,2003,27(7):41-44(in Chinese).
|
[17] | 李晓磊,周京阳,于尔铿,等.基于动态搜索线性混合整数法的机组组合新算法[J].电力系统自动化,2008,32(21):18-22.
|
[18] | Li Xiaolei,Zhou Jingyang,Yu Erkeng,et al.Linear mixed integer programming algorithm for unit commitment based on dynamic search[J].Automation of Electric Power Systems,2008,32(21):18-22(in Chinese).
|
[19] | 黎静华,韦化.基于内点法的机组组合模型[J].电网技术,2007,31(24):28-34.
|
[20] | Li Jinghua,Wei hua.A unit commitment model based on interior point method[J].Power System Technology,2007,31(24):28-34(in Chinese).
|
[21] | 王成文,韩勇,谭忠富,等.一种求解机组组合优化问题的降维半解析动态规划方法[J].电工技术学报,2006,21(5):110-116.
|
[22] | Wang Chengwen,Han Yong,Tan Zhongfu,et al.Dimension-reduced semi-analytical dynamic programming approach for solving unit commitment problem[J].Transactions of China Electrotechnical Society,2006,21(5):110-116(in Chinese).
|
[23] | 张利,赵建国,韩学山.考虑网络安全约束的机组组合新算法[J].电网技术,2006,30(21):50-55.
|
[24] | Zhang Li,Zhao Jianguo,Han Xueshan.A new unit commitment algorithm considering network security constraints[J].Power System Technology,2006,30(21):50-55(in Chinese).
|
[25] | 陈烨,赵国波,刘俊勇,等.用于机组组合优化的蚁群粒子群混合算法[J].电网技术,2008,32(6):52-56.
|
[26] | Chen Ye,Zhao Guobo,Liu Junyong,et al.An ant colony optimization and particle swarm optimization hybrid algorithm for unit commitment based on operate coding[J].Power System Technology,2008,32(6):52-56(in Chinese).
|
[27] | Jalilzadeh S,Shayeghi H,Hadadian H.Integrating generation and transmission networks reliability for unit commitment solution [J].Energy Conversion and Management,2009,50(3):777-785.
|