全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
电网技术  2010 

容量市场环境下高报行为的分析与防范

, PP. 139-144

Full-Text   Cite this paper   Add to My Lib

Abstract:

容量市场与电量市场联合运行的环境下,发电商在容量市场有动机高报容量,而在电量市场和辅助服务市场侧将高报电价,以避免发电。分析了高报发电容量机组的风险和收益,提出了计算机组惩罚水平的方法,进一步指出亏损的基、腰荷机组和盈利调峰机组是两类潜在的投机者。研究结果表明,有效的惩罚水平与发电商特有的随机性的利润收入及其风险偏好高度相关。该方法及结果对电量市场与容量市场的有效运行和管制有借鉴意义。

References

[1]  江健健,康重庆,夏清.容量电价机制对发电商竞价行为的激励[J].中国电机工程学报,2007,27(31):83-88.
[2]  Jiang Jianjian,Kang Chongqing,Xia Qing.Stimulation of capacity pricing mechanisms on market participants’ bidding behaviors [J].Proceedings of the CSEE,2007,27(31):83-88(in Chinese).
[3]  The New England Independent System Operator (ISO-NE).Forward capacity market (FCM) [EB/OL].2010.http://www.iso-ne.com/ markets/othrmkts_data/fcm/index.html.
[4]  PJM Interconnection.The reliability pricing model (RPM) [EB/OL].2010.http://www.pjm.com/markets/rpm/rpm.html.
[5]  Cramton P,Stoft S.A capacity market that makes sense[J].IEEE Electricity Journal,2005(18):43-54.
[6]  Besser J G,Farr J G,Tierney S F.The political economy of long-term generation adequacy: why an ICAP mechanism is needed as part of standard market design[J].Electricity Journal,2002,15(7):53-62.
[7]  Schubert E S,Hurlbut D,Adib P,et al.The Texas energy-only resource adequacy mechanism[J].Electricity Journal,2006,19(10):39-49.
[8]  Vazquez C,Rivier M,Perez-Arriaga I.A market approach to long-term security of supply[J].IEEE Trans on Power Systems,2002,17(2):349-357.
[9]  Oren S S.Generation adequacy via call options obligations: safe passage to the promised land[J].Electricity Journal,2005,18(9):28-42.
[10]  Hogan W W.On an “energy only” electricity market design for resource adequacy[R].Cambridge,MA:Harvard University,2005.
[11]  Neumann J V,Morgenstern O.Theory of games and economic behavior[M].Princeton,New Jersey:Princeton University Press,1947:1-55.
[12]  Feng D,Gan D,Zhong J,et al.Supplier asset allocation in a pool-based electricity market[J].IEEE Trans on Power Systems,2007,22(3):1129-1138.
[13]  Kahneman D,Tversky A.Prospect theory:an analysis of decision making under risk[J].Econometrica,1979,47(2):263-291.
[14]  鲁刚,文福拴,薛禹胜,等.电力市场环境下的发电容量充裕性(一):单一能量市场情形[J].电力系统自动化,2008,32(20):5-10.
[15]  Lu Gang,Wen Fushuan,Xue Yusheng,et al.State-of-the-art of studies on generation capacity adequacy in electricity market environment part one:energy only market[J].Automation of Electric Power Systems,2008,32(20):5-10(in Chinese).
[16]  栗文义,张保会,巴根.风–柴–储能系统发电容量充裕度评估[J].中国电机工程学报,2006,26(16):62-67.
[17]  Li Wenyi,Zhang Baohui,Ba Gen.Capacity adequacy evaluation of wind-diesel-storage system[J].Proceedings of the CSEE,2006,26(16):62-67(in Chinese).
[18]  The New York Independent System Operator (NYISO).ICAP data & information[EB/OL].2010.http://www.nyiso.com/public/products/ icap/index.jsp.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133