电网技术  2010 

电力市场中考虑灵活性措施的发电投资决策分析

, PP. 151-155

Full-Text   Cite this paper   Add to My Lib

Abstract:

电力市场改革使发电投资面临了众多不确定性和潜在的市场化风险,这对发电投资的灵活性提出了较高的要求。考虑电力市场环境下发电投资灵活性的特点,提出了发电投资决策的灵活性分析框架,并以扩展的净现值作为灵活性策略评估指标,应用实物期权理论对投资策略进行评估。分别对乐观、一般和悲观的市场环境中燃料成本和电价等不确定性因素进行模拟,分析各投资阶段的项目收益波动情况。针对基本投资、扩容投资和放弃投资等3种灵活性策略,构建了市场环境下考虑灵活性措施的二叉树模型,并对灵活性策略的期权价值和扩展的净现值进行评估。以一个300MW的燃气蒸汽联合循环电厂容量投资为例,比较分析考虑灵活性措施前后的净现值,验证了该模型的有效性和合理性。

References

[1]  贾德香,程浩忠,韩净.发电与输电投资的期权博弈决策方法[J].电力系统自动化,2007,31(9):11-15.
[2]  Jia Dexiang,Cheng Haozhong,Han Jing.An approach to generation and transmission investment decision-making based on real option game in power market[J].Automation of Electric Power Systems 2007,31(9):11-15(in Chinese).
[3]  袁德,李宜君,董全学,等.基于Black-Scholes 实物期权定价模型的发电商投资决策分析[J].电力系统保护与控制,2008,36(12):17-20.
[4]  Yuan De,Li Yijun,Dong Quanxue,et al.The generation investment decision based on the black-scholes real option pricing model [J].Power System Protection and Control,2008,36(12):17-20(in Chinese).
[5]  曾次玲,张步涵,谢培元,等.基于风险管理在开放的能量市场和备用市场间优化分配发电容量[J].电网技术,2004,28(13):70-74.
[6]  Zeng Ciling,Zhang Buhan,Xie Peiyuan,et al.Risk management based optimal allocation of generation capacity between open access energy market and reserve market[J].Power System Technology,2004,28(13):70-74(in Chinese).
[7]  谭忠富,王绵斌,朱璋,等.发电公司与电网公司的风险效益平衡模型[J].电网技术,2007,31(16):6-11.
[8]  Hull J.Options, futures and other derivatives[M].Prentice-Hall Press,2002:70-77.
[9]  Dias M A G.Investment in information in petroleum,real options and revelation[C]//6th Annual International Conference on Real Options,Pathos,Cyprus,2002:1027-1031.
[10]  Frayer J,Uludere N Z.What is it worth:application of real options theory to the valuation of generation assets[J].The Electricity Journal,2001,14(8):40-51.
[11]  Wang C H.Generation planning for electric power utilities under market uncertainties:a real options approach,doctoral dissertation [D].Ames,IA,USA:Iowa State University:2001.
[12]  Min K J,Wang C H.Generation planning for inter-related generation units:a real options approach[C]//Proceedings of IEEE Power Engineering Society 2000 Summer Meeting,Everett,WA USA,2000:2124-2127.
[13]  吉兴全,文福拴.发电投资的实物期权决策方法[J].电力系统自动化,2005,29(11):1-5.
[14]  Ji Xingquan,Wen Fushuan.A real option approach to generation investment decision-making in electricity market environment [J].Automation of Electric Power Systems,2005,29(11):1-5(in Chinese).
[15]  Venetsanos K,Angelopou P,Tsoutsos T.Renewable energy sources project uncertainty:the case of wind energy exploitations within a changing energy market environment[J].Energy Policy,2002,30(4):393-307.
[16]  张毅.市场环境下基于灵活性策略的投资评估方法与应用研究[D].北京:华北电力大学,2009.
[17]  王勇,文福拴,钟志勇,等.基于实物期权理论的发电投资决策和容量充裕性评估[J].电力系统自动化,2005,29(19):1-8.
[18]  Wang Yong,Wen Fushuan,Chung C Y,et al.Real option based approach for generation investment decision making and generation capacity adequacy analysis[J].Automation of Electric Power Systems,2005,29(19):1-8(in Chinese).
[19]  康重庆,白利超,夏清,等.电力市场中发电商的风险决策[J].中国电机工程学报,2004,24(8):1-6.
[20]  Kang Chongqing,Bai Lichao,Xia Qing,et al.Risk decision-making of generators in electricity market[J].Proceedings of the CSEE,2004,24(8):1-6(in Chinese).
[21]  Lin W M,Zhan T S,Tsay M T,et al.The generation expansion planning of the utility in a deregulated environment[C]//2004 IEEE International Conference Electric Utility Deregulation,Restructuring and Power Technologies (DRPT2004),Wuhan,China,2007:1-4.
[22]  Tan Zhongfu,Wang Mianbin,Zhu Zhang,et al.Risk-benefit balance model between generating company and power grid company [J].Power System Technology,2007,31(16):6-11(in Chinese).
[23]  梁志宏,杨昆.电力市场下基于实物期权理论的电源投资动态决策模型研究[J].中国电机工程学报,2006,26(8):75-79.
[24]  Liang Zhihong,Yang Kun.Study on dynamic decision model of investing new power generation capacity based on real optiontheroy in electricity markets[J].Proceedings of the CSEE,2006,26(8):75-79(in Chinese).

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133