[1] | Wang J X,Wang X F,Wu Y.Operating reserve model in power market[J].IEEE Trans on Power Systems,2005,20(1):223-229.
|
[2] | 张国全,王秀丽,王锡凡.电力市场中旋转备用的效益和成本分析[J].电力系统自动化,2000,24(21):14-18.
|
[3] | Zhang Guoquan,Wang Xiuliu,Wang Xifan. Study on benefits and costs of spinning reserve capacity in power market[J].Automation of Electric Power Systems,2000,24(21):14-18(in Chinese).
|
[4] | 王乐,余志伟,文福栓.基于机会约束的最优旋转备用容量确定[J].电网技术,2006,30(20):14-19.
|
[5] | Wang Le,Yu Zhiwei,Wen Fushuan.A chance-constrained programming approach to determine requirement of optimal spinning reserve capacity[J].Power System Technology,2006,30(20):14-19(in Chinese).
|
[6] | Song Z,Goel L,Wang P.Optimal spinning reserve allocation in deregulated power system[J].IEEE Proceedings:Generation,Transmission and Distribution,2005,152(4):483-488.
|
[7] | Ronan D,Mark O M.Quantifying reserve demands due to increasing wind power penetration[C].Proc. IEEE Bologna Power Tech Conf,Bologna,Italy,2003.
|
[8] | Tan Lunnong,Zhang Baohui.Reserve capacity for accident in power market environment[J].Proceedings of the CSEE,2002,22(11):54-58(in Chinese).
|
[9] | Bouffard F,Galiana F D.Stochastic security for operations planning with significant wind power generation[J].IEEE Trans. Power Systems,2008,23(2):306-316.
|
[10] | 陈海焱,陈金富,段献忠.含风电机组的配网无功优化[J].中国电机工程学报,2008,28(7):40-45.
|
[11] | Chen Haiyan,Chen Jinfu,Duan Xianzhong.Reactive power optimization in distribution system with wind power generators [J].Proceedings of the CSEE,2008,28(7):40-45(in Chinese).
|
[12] | 顾雪平,韩忠晖,梁海平.电力系统大停电后系统分区恢复的优化算法[J].中国电机工程学报,2009,29(10):41-46.
|
[13] | Gu Xueping,Han Zhonghui,Liang Haiping.Optimization of parellel restoratcion through power system partitioning after blackout [J].Proceedings of the CSEE,2009,29(10):41-46(in Chinese).
|
[14] | 江岳文,陈冲,温步瀛.随机模拟粒子群算法在风电场无功补偿中的应用[J].中国电机工程学报,2008,28(13):47-52.
|
[15] | Ronan D,Mark O.A new approach to quantify reserve demand in systems with significant installed wind capacity[J].IEEE Transactions on Power Systems,2005,22(2):587-594.
|
[16] | 韩学山,柳焯.考虑发电机组输出功率速度限制的最优机组组合[J].电网技术,1994,18(6):11-16.
|
[17] | Han Xueshan,Liu zhuo.Optimal unit commitment considering unit’s ramp-rate limits[J].Power System Technology,1994,18(6):11-16(in Chinese).
|
[18] | 万官泉,任震,郭小龙,等.考虑馈线自动化的用户停电损失计算[J].电网技术,2005,29(1):24-29.
|
[19] | Wan Guanquan,Ren Zhen,Guo Xiaolong,et al.Calculation of customer’s outage cost considering feeder automation[J].Power System Technology,2005,29(1):24-29(in Chinese).
|
[20] | Billinton R,Allan R N.Reliability evaluation of power systems [M].New York:Plenum,1996.
|
[21] | Bunn D W.Forecasting load and prices in competitive power markets[J].Proc. IEEE,2000,88(2):163-169.
|
[22] | 谭伦农,张保会.市场环境下的事故备用容量[J].中国电机工程学报,2002,22(11):54-58.
|
[23] | Jiang Yuewen,Chen Chong,Wen Buying.Application of stochastic simulation’s particle swarm algorithm in the compensation of reactive power for wind farms[J].Proceedings of the CSEE,2008,28(13):47-52(in Chinese).
|
[24] | 苏鹏,刘天琪,赵国波,等.节能调度下基于改进粒子群算法的多目标负荷最优分配[J].电网技术,200,33 (5):48-53.
|
[25] | Su Peng,Liu Tianqi,Zhao Guobo,et al.An improved particle swarm optimization based multi-objective load dispatch under energy conservation dispatching[J].Power System Technology,2009,33(5):48-53(in Chinese).
|
[26] | 陈长云.市场条件下含风电场的电力系统优化运行研究[D].北京:北京交通大学,2008.
|