[1] | 曾南超.高压直流输电在我国电网发展中的作用[J].高电压技术,2004,30(11):21-23.
|
[2] | Zeng Nanchao.Role of HVDC transmission in the power system development in China[J].High Voltage Engineering,2004,30(11):21-23(in Chinese).
|
[3] | 袁清云.特高压直流输电技术现状及在我国的应用前景[J].电网技术,2005,29(14):1-3.
|
[4] | Yuan Qingyun.Present state and application prospect of ultra HVDC transmission in China[J].Power System Technology,2005,29(14):1-3(in Chinese).
|
[5] | 杨鹏,杨景,王亮.宁东—山东±660kV直流输电工程解锁逻辑研究[J].电网技术,2011,35(3):90 -93.
|
[6] | Yang Peng,Yang Jing,Wang Liang.Deblock logic for ±660 kV DC power transmission project from Ningdong to Shandong[J].Power System Technology,2011,35(3):90-93(in Chinese) .
|
[7] | 蒲莹,舒畅,蒋维勇,等.宁东—山东±660kV直流输电示范工程二次系统实时仿真试验及关键问题对策[J].电网技术,2011,35(1):76-83.
|
[8] | Pu Ying,Shu Chang,Jiang Weiyong,et al.Real-time simulation test for secondary system of ±660 kV HVDC power transmission demonstration project from Ningdong to Shandong and countermeasures to key problems[J].Power System Technology,2011,35(1):76-83 (in Chinese) .
|
[9] | 于晓峰.浅谈500kV线路带电更换技术[J].科技资讯,2009(9):106.
|
[10] | Yu Xiaofeng.Technology of live replace on 500kV transmission line[J].Technology News,2009(9):106(in Chinese).
|
[11] | 赵作利.带电作业的发展与展望[J].东北电力技术,2003(7):3-7.
|
[12] | Zhao Zuoli.The development and forecast for live-line work [J].Northeastern Electric Power Technology,2003(7):3-7(in Chinese).
|
[13] | 马为民,李亚男,周静.特高压直流输电系统可靠性和可用率指标研究[J].电力设备,2007(3):86-88.
|
[14] | Ma Weimin,Li Yanan,Zhou Jing.Reliability and availability index study of UHVDC system[J].Electrical Equipment,2007(3):86-88(in Chinese).
|
[15] | 胡涛,胡毅,李景禄,等.输电线路带电作业的安全防护[J].高电压技术,2006,32(5):52-57.
|
[16] | Hu Tao,Hu Yi,Li Jinglu,et al.Safety protection for live working on transmission Line[J].High Voltage Engineering,2006,32(5):52-57(in Chinese).
|
[17] | 胡毅,王力农,刘凯,等.特高压交流输电线路带电作业现场应用试验[J].高电压技术,2009,37(9):2053-2058.
|
[18] | Hu Yi,Wang Linong,Liu Kai,et al.On-site application test of live working of UHV AC transmission line[J].High Voltage Engineering,2009,37(9):2053-2058(in Chinese).
|
[19] | 蒋兴良,苑吉河,孙才新,等.我国±800kV特高压直流输电线路外绝缘问题[J].电网技术,2006,30(9):1-9.
|
[20] | Jiang Xingliang,Yuan Jihe,Sun Caixin,et al.External Insulation of ±800 kV UHV DC power transmission lines in China [J].Power System Technology,2006,30(9):1-9(in Chinese).
|
[21] | 魏长喜,毛小虎.高海拔500kV输电线路带电作业技术分析[J].四川电力技术,2004(1):34-53.
|
[22] | Wei Changxi,Mao Xiaohu.Analysis of live working technology on 500kV transmission line on high altitude [J].Sichuan Electric Power Technology,2004(1):34-53(in Chinese).
|
[23] | 祁胜利.500kV带电作业中应注意的3个距离[J].电力安全技术,2002(10):23-27.
|
[24] | Qi Shengli.The three distance should be pay attention to on 500kV live working[J],Electric Safety Technology,2002(10):23-27(in Chinese).
|
[25] | 胡毅,胡建勋,刘凯,等.特高压交直流线路带电作业人员的体表场强[J].高电压技术,2010,38(1):13-18.
|
[26] | Hu Yi,Hu Jianxun,Liu Kai,et al.Field strength of body surface during the live working on the UHV AC and DC transmission Lines[J].High Voltage Engineering,2010,38(1):13-18(in Chinese).
|
[27] | GB 6568.2—2000,带电作业用屏蔽服装试验方法[S].
|
[28] | 张文亮,陆家榆,鞠勇,等.±800kV直流输电线路的导线选型研究[J].中国电机工程学报,2007,27(27):1-6 .
|
[29] | Zhang Wenliang,Lu Jiayu,Ju Yong,et al.Design consideration of conductor bundles of ±800kV DC transmission lines[J].Proceedings of the CSEE,2007,27(27):1-6(in Chinese).
|
[30] | 聂国一.关于带电作业最小接近距离的规定[J].电力建设,2004,25(11):35-36.
|
[31] | Nie Guoyi.Regulations about minimum approaching distance under Live-line operation[J].Electric Power Construction,2004,25(11):35-36(in Chinese).
|
[32] | DL/T 876—2004 带电作业绝缘配合导则[S].
|
[33] | 李如虎.带电作业进入等电位方式点评[J].南方电网技术,2009,3(2):59-61.
|
[34] | Li Ruhu.Live working way into the equipotential comments [J].Southern Electric Power Technology,2009,3(2):59-61(in Chinese).
|
[35] | 曾南超.高压直流输电在我国电网发展中的作用[J].高电压技术,2004,30(11):11-12.
|
[36] | Zeng Nanchao.Role of HVDC transmission in the power system development in China[J].High Voltage Engineering,2004,30(11):11-12(in Chinese).
|
[37] | 邵瑰玮,胡毅,王力农,等.特高压交流线路带电作业安全防护用具与措施[J].高电压技术,2007,35(11):21-23.
|
[38] | Shao Guiwei,Hu Yi,Wang Linong,et al.Safety protection tools and measures of live working on 1000 kV AC transmission line[J].High Voltage Engineering,2007,35(11):21-23(in Chinese).
|
[39] | DL/T 966—2005 送电线路带电作业技术导则[S].
|
[40] | 范建斌,廖蔚明,李庆峰,等.±800kV直流输电线路带电作业方式的试验研究[J].电力建设,2009,30(7):7-12.
|
[41] | Fan Jianbin,Liao Weiming,Li Qingfeng,et al.Experimental research on live-line operation for ±800kV DC transmission line[J].Electric Power Construction,2009,30(7):7-12(in Chinese).
|