[1] | 孟凡凤,张兵,方晓明,等.影响直埋电缆载流量的因素的研究[J].绝缘材料,2007,40(3):64-66.
|
[2] | Meng Fanfeng,Zhang Bing,Fang Xiaoming,et al.Study of ampacity reduction factors for burried cable[J].Insulating Materials,2007,40(3):64-66(in Chinese).
|
[3] | Yu Jianli,Chang Shusheng.Niu Yuanfang,et al.Numerical simulation of thermal fields and ampacity of underground power cables[J].Journal of Northeast Dianli University:Natural Science Edition,2008,28(4):62-65(in Chinese).
|
[4] | 梁永春,柴进爱,李彦明,等.基于FEM的直埋电缆载流量与外部环境关系的计算[J].电工电能新技术,2007,26(4):11-13.
|
[5] | 赵建华,袁宏永,范维澄,等.基于电缆表面温度场的电缆线芯温度在线诊断研究[J].中国电机工程学报,1999,19(1):52-68.
|
[6] | Zhao Jianhua,Yuan Hongyong,Fan Weicheng,et al.Surface temperature field based online diagnoses study for electric cable’s conductor temperature[J].Proceedings of the CSEE,1999,19(1):52-68(in Chinese).
|
[7] | 刘毅刚,罗俊华.电缆导体温度实时计算的数学方法[J].高电压技术,2005,31(5):52-54.
|
[8] | Liu Yigang,Luo Junhua.Mathematical method of temperature calculation of power cable conductor in real time[J].High Voltage Engineering,2005,31(5):52-54(in Chinese).
|
[9] | 雷成华,刘刚,李钦豪.BP神经网络模型用于单芯电缆导体温度的动态计算[J].高电压技术,2011,37(1):184-189.
|
[10] | Lei Chenghua,Liu Gang,Li Qinhao.Dynamic calculation of conductor temperature of single-cable using BP neural network[J].High Voltage Engineering,2011,37(1):184-189(in Chinese).
|
[11] | Swift G,Molinski T S,Lehn W.A fundamental approach to transformer thermal modeling,part I:theory and equivalent circuit[J].IEEE Trans on Power Delivery,2001,16(2):171-175.
|
[12] | Hiranandani A,Detroit E C.Calculation of conductor temperatures and ampacities of cable systems using a generalized finite difference model[J].IEEE Trans on Power Delivery,1991,6(1):15-21.
|
[13] | 赵健康,雷清泉,王晓兵,等.复杂运行条件下交联电缆载流量研究[J].高电压技术,2009,35(12):3123-3128.
|
[14] | Zhao Jiankang,Lei Qingquan,Wang Xiaobing,et al.Experimental research on ampacity of extruded power cable under complex operating condition[J].High Voltage Engineering,2009,35(12):3123-3128(in Chinese).
|
[15] | 王俏华,顾金,吴建东,等.预处理温度对高压直流电缆附件绝缘材料空间电荷的影响[J].电网技术,2011,35(1):122-126.
|
[16] | Wang Qiaohua,Gu Jin,Wu Jiandong,et al.Influence of pretreating temperature on space charge of insulation materials for cable accessories used in HVDC transmission projects[J].Power System Technology,2011,35(1):122-126(in Chinese).
|
[17] | León de F,Anders G J.Effects of backfilling on cable ampacity analyzed with the finite element method[J].IEEE Trans on Power Delivery,2008,23(2):537-543.
|
[18] | 马国栋.电线电缆载流量[M].北京:中国水利水电出版社,2003:148-184.
|
[19] | 李志坚,张东斐,曹慧玲,等.地下埋没电缆温度场和载流量的数值计算[J].高电压技术,2004,30(S1):27-30.
|
[20] | Li Zhijian,Zhang Dongfei,Cao Huiling,et al.Numerical calculation of tenmperature field and of underground cable[J].High Voltage Engineering,2004,30(S1):27-30(in Chinese).
|
[21] | 于建立,常树生,牛远方,等.地下电力电缆温度场及载流量的数值计算[J].东北电力大学学报:自然科学版,2008,28(4):62-65.
|
[22] | Liang Yongchun,Chai Jinai,Li Yanming,et al.Calculation of ampacity reduction factors for buried cables with surroundings based on FEM[J].Advanced Technology of Electrical Engineering and Energy,2007,26(4):11-13(in Chinese).
|
[23] | 曹惠玲,王增强,李雯靖.等.坐标组合法对直埋电缆与土壤界面温度场的数值计算[J].电工技术学报,2003,18(3):59-63.
|
[24] | Cao Huiling,Wang Zengqiang,Li Wenjing,et al.Numerical computation of temperature distribution of underground cables and soil with combinatorial coordinates[J].Transactions of China Electrotechnical Society,2003,18(3):59-63(in Chinese).
|
[25] | 柴进爱,梁永春,李延沐,等.地下直埋发热管稳态温度场计算新方法:模拟热荷法的研究[J].高压电器,2008,44(1):43-46.
|
[26] | Chai Jinai,Liang Yongchun,Li Yanmu,et al.Heat charge simulation method to calculate steady:state temperature field of underground heat pipe[J].High Voltage Apparatus,2008,44(1):43-46(in Chinese).
|
[27] | 梁永春,李延沐,李彦明,等.利用模拟热荷法计算地下电缆稳态温度场[J].中国电机工程学报,2008,28(5):129-134.
|
[28] | Liang Yongchun,Li Yanmu,Li Yanming,et al.Calculation of the static temperature field of underground cables using heat charge simulation method[J].Proceeding of the CSEE,2008,28(5):129-134(in Chinese).
|
[29] | 成永红,谢恒,衣立东.基于热效应的电力电缆及其终端在线检测技术[J].高电压技术,1999,25(3):4-6.
|
[30] | Cheng Yonghong,Xie Heng,Yi Lidong.Study on the on-line detecting technique for power cable and terminal based on heat effect[J].High Voltage Engineering,1999,25(3):4-6(in Chinese).
|
[31] | Tarasiewicz E,Kuffel E,Grzybowski S.Calculations of temperature distributions within cable trench backfill and the surrounding soil[J].IEEE Trans on Apparatus and Systems,1985,3(8):1973-1977.
|
[32] | 成永红,衣立东,程锡圭,等.运行状态下电缆终端热分布实验研究[J].高电压技术,1996,22(3):56-58.
|
[33] | Cheng Yonghong,Yi Lidong,Cheng Xigui,et al.The experiment and research on thermal distribution of cable terminal in service[J].High Voltage Engineering,1996,22(3):56-58(in Chinese).
|
[34] | 罗俊华,周作春,李华春,等.电力电缆线路运行温度在线检测技术应用研究[J].高电压技术,2007,33(1):169-172.
|
[35] | Luo Junhua,Zhou Zuochun,Li Huachun,et al.Application of operation temperature detection technique for on-line power cable lines[J].High Voltage Engineering,2007,33(1):169-172(in Chinese).
|
[36] | 曹惠玲,王增强,李文靖,等.坐标组合法对直埋电缆与土壤界面温度场的数值计算[J].电工技术学报,2003,18(3):59-63.
|
[37] | Cao Huiling,Wang Zengqiang,Li Wenjing,et al.Numerical computation of temperature distribution of underground cables and soil with combinatorial coordinates[J].Transactions of China Eletrotechnical Society,2003,18(3):59-63(in Chinese).
|
[38] | 梁永春,李彦明,柴进爱,等.地下电缆群稳态温度场和载流量计算新方法[J].电工技术学报,2007,22(8):185-190.
|
[39] | Liang Yongchun,Li Yanming,Chai Jinai,et al.A new method to calculate the steady-state temperature field and ampacity of underground cable system[J].Transactions of China Electrotechnical Society,2007,22(8):185-190(in Chinese).
|
[40] | Anders G J.Power cable thermal analysis with considerations of heat and moisture transfer in the soil[J].IEEE Trans on Power Delivery,1988,3(4):1280-1285.
|
[41] | 赵建华,袁宏永,范维澄,等.基于电缆表面温度场的电缆线芯温度在线诊断研究[J].中国电机工程学报,1999,19(11):52-58.
|
[42] | Zhao Jianhua,Yuan Hongyong,Fan Weicheng,et al.Surface temperature field based online diagnoses study for electric cable’s conductor temperature[J].Proceedings of the CSEE,1999,19(11):52-58(in Chinese).
|
[43] | 樊友兵,张丽,蒙邵新,等.中低压交联电缆集群敷设载流量的计算[J].高电压技术,2005,31(10):59-60.
|
[44] | Fan Youbing,Zhang Li,Meng Shaoxin,et al.Calculation of current rating for medium and low voltage XLPE cable in custer laying[J].High Voltage Engineering,2005,31(10):59-60(in Chinese).
|