[1] | 康重庆,陈启鑫,夏清.低碳电力技术的研究展望[J].电网技术,2009,33(2):1-7.
|
[2] | Kang Chongqing,Chen Qixin,Xia Qing.Prospects of low-carbon electricity[J].Power System Technology,2009,33(2):1-7(in Chinese).
|
[3] | 陈启鑫,康重庆,葛俊,等.基于排放轨迹模型的电力行业CO2减排模式分析[J].电网技术,2009,33(19):44-49.
|
[4] | Chen Qixin,Kang Chongqing,Ge Jun,et al.Analysis on reduction model of CO2 emission in power sector based on emission trajectory model[J].Power System Technology,2009,33(19):44-49(in Chinese).
|
[5] | 康重庆,周天睿,陈启鑫,等.电网低碳效益评估模型及其应用[J].电网技术,2009,33(17):1-7.
|
[6] | Lamont J W,Obessis E V.Emission dispatch model and algorithms for the 1990’s[J].IEEE Transactions on Power Systems,1995,10(2):941-947.
|
[7] | Kang Chongqing,Zhou Tianrui,Chen Qixin,et al.Assessment model on low-carbon effects of power grid and its application[J].Power System Technology,2009,33(17):1-7 (in Chinese).
|
[8] | Stavins R N.Experience with market-based environmental policy instruments[EB/OL].[2011-05-02].http://www.rff.org/documents/ RFF-DP-01-58.pdf.
|
[9] | Ferial T J H,Ei-Hawary M E.A summary of environmental economic dispatch algorithms[J].IEEE Trans on Power Systems,1994,9(3):1508-1516.
|
[10] | Liu Xian,Xu Wilsun.Minimum emission dispatch constrained by stochastic wind power availability and cost[J].IEEE Transactions on Power Systems,2010,25(3):1705-1714.
|
[11] | Wu Lei,Shahidehpour M,Li Tao.Stochastic security-constrained unit commitment[J].IEEE Transactions on Power Systems,2007,22(2):800-811.
|
[12] | 杨明,韩学山,梁军,等.经济调度中考虑温室气体排放约束的新方法(英文)[J].电工技术学报,2008,23(12):166-172.
|
[13] | Yang Ming,Han Xueshan,Liang Jun,et al.A novel solution for economic dispatch with greenhouse gases emission constraints [J].Transactions of China Electrotechnical Society,2008,23(12):166-172.
|
[14] | 陈启鑫,康重庆,夏清,等.低碳电力调度方式及其决策模型[J].电力系统自动化,2010,34(12):18-23.
|
[15] | Chen Qixin,Kang Chongqing,Xia Qing,et al.Mechanism and modeling approach to low-carbon power dispatch[J].Automation of Electric Power Systems,2010,34(12):18-23(in Chinese).
|
[16] | Raglend I J,Padhy N P.Solutions to practical unit commitment problems with operational, power flow and environmental constraints [C]//Proceedings of IEEE power engineering society general meeting.Montreal,Canada:IEEE,2006:1-8.
|
[17] | 张宁,周天睿,段长刚,等.大规模风电场接入对电力系统调峰的影响[J].电网技术,2010,34(1):152-158.
|
[18] | Zhang Ning,Zhou Tianrui,Duan Changgang,et al.Impact of large scale wind farm connecting with power grid on peak load regulation demand[J].Power System Technology,2010,34(1):152-158(in Chinese).
|
[19] | 王明俊.智能电网热点问题探讨[J].电网技术,2009,33(18):9-16.
|
[20] | Wang Mingjun.Some highlights in relation to smart grid[J].Power System Technology,2009,33(18):9-16(in Chinese).
|
[21] | 刘峻,何世恩.建设坚强智能电网助推酒泉风电基地发展[J].电力系统保护与控制,2010,38(21):19-23.
|
[22] | Liu Jun,He Shien.Strong smart grid boosts Jiuquan wind power base development[J].Power System Protection and Control,2010,38(21):19-23(in Chinese).
|
[23] | 刘畅,张少华,王晛.多时段可中断负荷调度的智能优化算法[J].电力系统保护与控制,2010,38(24):105-109.
|
[24] | Liu Chang,Zhang Shaohua,Wang Xian.Intelligent optimization algorithms for multi-period dispatch of interruptible loads[J].Power System Protection and Control,2010,38(24):105-109(in Chinese).
|
[25] | Flexible Electricity Nehmorks to Integrate the Expected Energy Evolution[R/OL].2008-11-01[2011-07].http://www.fenix-project. org.
|
[26] | Carrion M,Arroyo J M.A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem[J].IEEE Transactions on Power Systems,2006,21(3):1371-1378.
|