[1] | 丁明,包敏,吴红斌,等.复合能源分布式发电系统的机组组合问题[J].电力系统自动化,2008,32(6):46-50.
|
[2] | Ding Ming,Bao Min,Wu Hongbin,et al.Unit commitment problem in distributed generation system with multiple energy sources [J].Automation of Electric Power Systems,2008,32(6):46-50(in Chinese).
|
[3] | Borowy B S,Salaneh Z M.Methodology for optimally sizing the combination of battery bank and PV array in a wind PV hybrid system[J].IEEE Trans on Energy Conversion,2007,11(2):367-375.
|
[4] | 徐大明,康龙云,曹秉刚.风光互补独立供电系统的优化设计[J].太阳能学报,2006,27(9):919-922.
|
[5] | Xu Daming,Kang Longyun,Cao Binggang.Optimal design of standalone hybrid wind PV power systems[J].Acta Energiae Solaris Sinica,2006,27(9):919-922(in Chinese).
|
[6] | 雷金勇,谢俊,甘德强.分布式发电功能系统能量优化及节能减排效益分析[J].电力系统自动化,2009,33(23):29-36.
|
[7] | Lei Jinyong,Xie Jun,Gan Deqiang.Optimization of distributed energy system and benefit analysis of energy saving and emission reduction[J].Automation of Electric Power Systems,2009,33(23):29-36(in Chinese).
|
[8] | 杨琦,张建华,刘自发,等.风光互补混合供电系统多目标优化设计[J].电力系统自动化,2009,33(17):86-90.
|
[9] | Yang Qi,Zhang Jianhua,Liu Zifa,et al.Multi-objective optimization of hybrid PV wind power supply system[J].Automation of Electric Power Systems,2009,33(17):86-90(in Chinese).
|
[10] | 赵炜炜,张建华,尚敬福,等.电网大面积停电应急评价指标体系及其应用[J].电力系统自动化,2008,32(20):27-30.
|
[11] | Zhao Weiwei,Zhang Jianhua,Shang Jingfu,et al.Power system large scale blackout emergency evaluation index system and its application[J].Automation of Electric Power Systems,2008,32(20):27-30(in Chinese).
|
[12] | 王钦,文福拴,刘敏,等.基于模糊集理论和层次分析法的电力市场综合评价[J].电力系统自动化,2009,33(7):32-37.
|
[13] | Wang Qin,Wen Fushuan,Liu Min,et al.Combined use of fuzzy set theory and analytic hierarchy process for comprehensive assessment of electricity markets[J].Automation of Electric Power Systems,2009,33(7):32-37(in Chinese).
|
[14] | 肖峻,王成山,周敏.基于区间层次分析法的城市电网规划综合评价决策[J].中国电机工程学报,2004,24(4):50-57.
|
[15] | Xiao Jun,Wang Chengshan,Zhou Min.An IAHP-based MADM method in urban power system planning[J].Proceedings of the CSEE,2004,24(4):50-57(in Chinese).
|
[16] | 帅颖,刘俊勇.基于DEA的发电企业综合效率评价[J].电力自动化设备,2009,29(2):73-76.
|
[17] | Shuai Ying,Liu Junyong.DEA-based synthetical efficiency evaluation of power generation enterprise[J].Electric Power Automation Equipment,2009,29(2):73-76(in Chinese).
|
[18] | 刘念,张建华,段斌,等.网络环境下变电站自动化通信系统脆弱性评估[J].电力系统自动化,2008,32(8):28-33.
|
[19] | Liu Nian,Zhang Jianhua,Duan Bin,et al.Vulnerability assessment for communication system of network-based substation automation system[J].Automation of Electric Power Systems,2008,32(8):28-33 (in Chinese).
|
[20] | 刘文霞,刘晓茹,张建华.基于偏好DEA方法的配电通信网多种接入方式评估[J].电力系统自动化,2009,33(4):72-75.
|
[21] | Liu Wenxia,Liu Xiaoru,Zhang Jianhua.An evaluation of various access means of the distribution communication network based on the preferred DEA method[J].Automation of Electric Power Systems,2009,33(4):72-75(in Chinese).
|
[22] | Satty T L.The analytic hierachy process[M].New York:McGraw-Hill Inc,1990:1-20.
|
[23] | Farghal S A,Kandil M S,Elmitwally A.Quantifying electric power quality via fuzzy modeling and analytic hierachy processing[J].IEE Proceedings on Generation,Transmission and Distribution,2002,149(1):15-20.
|
[24] | 毕庆生,宋之平,杨勇平.分布式冷热电三联供系统的单耗分析模型研究[J].工程热物理学报,2008,28(6):905-908.
|
[25] | Bi Qingsheng,Song Zhiping,Yang Yongping.Research on the unit consumption analysis model of distributed CCHP system[J].Journal of Engineering Thermophysics,2008,28(6):905-908(in Chinese).
|
[26] | 刘爱国,张士杰,肖云汉.微燃机与小燃机在南方地区分布式联供系统中的应用比较[J].燃气轮机技术,2009,22(3):1-9.
|
[27] | Liu Aiguo,Zhang Shijie,Xiao Yunhan.Comparison of the application in CCHP between micro turbines and small gas turbines in southern China[J].Gas Turbine Technology,2009,22(3):1-9(in Chinese).
|
[28] | 徐二树.分布式能量系统的研究与应用[D].北京:华北电力大学,2008.
|
[29] | 杨涛.发电企业大气污染排放与治理策略研究[D].北京:华北电力大学,2008.
|
[30] | 秦寿康.综合评价原理与应用[M].北京:电子工业出版社,2003:1-20.
|