[1] | 袁清云.我国特高压直流输电发展规划与研究成果[J].电力设备,2007,8(3):1-4.
|
[2] | Yuan Qingyun.Development planning and research accomplishments of UHVDC power transmission in China[J].Electrical Equipment,2007,8(3):1-4(in Chinese).
|
[3] | 范建斌,于永清,刘泽洪,等.?800 kV特高压直流输电标准体系的建立[J].电网技术,2006,30(14):1-6.
|
[4] | Fan Jianbin,Yu Yongqing,Liu Zehong,et al.Introduction of
|
[5] | ?800 kV HVDC transmission standards system[J].Power System Technology,2006,30(14):1-6(in Chinese)
|
[6] | 马为民,聂定珍,曹燕明.向家坝—上海?800 kV特高压直流工程中的关键技术方案[J].电网技术,2007,31(11):1-5.
|
[7] | Ma Weimin,Nie Dingzhen,Cao Yanming.Key technical schemes for ?800 kV UHVDC project from Xiangjiaba to Shanghai[J].Power System Technology,2007,31(11):1-5(in Chinese).
|
[8] | CIGRE WG 33/14.05.Guidelines for the application of metal oxide arresters without gaps for HVDC converter stations[R].Paris:FRA,1989.
|
[9] | IEC TS60071-5—2002,insulation coordination-part 5:procedures for high-voltage direct current (HVDC) converter stations[S].
|
[10] | 周沛洪,修木洪,谷定燮,等.?800 kV直流系统过电压保护和绝缘配合研究[J].高电压技术,2006,32(12):125-132.
|
[11] | Zhou Peihong,Xiu Muhong,Gu Dingxie,et al.Study on overvoltage protection and insulation coordination for ?800 kV HVDC transmission system[J].High Voltage Engineering,2006,32(12):125-132(in Chinese).
|
[12] | 聂定珍,马为民,郑劲.?800 kV特高压直流换流站绝缘配合研究[J].高电压技术,2006,32(9):75-79.
|
[13] | Nie Dingzhen,Ma Weimin,Zheng Jin.Insulation coordination for ?800 kV UHVDC converter station[J].High Voltage Engineering,2006,32(9):75-79(in Chinese).
|
[14] | Nie Dingzhen,Ma Weimin,Li Ming.Insulation coordination of UHVDC project from Jingping to Sunan[J].High Voltage Engineering,2010,36(1):92-97(in Chinese).
|
[15] | 张翠霞,刘之方.?800 kV直流输电工程过电压保护与绝缘配合研究[J].中国电力,2006,39(10):43-46.
|
[16] | Zhang Cuixia,Liu Zhifang.Study on overvoltage protection and insulation coordination for the ?800 kV DC power transmission project[J].Electric Power,2006,39(10):43-46(in Chinese).
|
[17] | 周沛洪,赵杰,吕金壮,等.?800 kV云广DC换流站避雷器布置和参数选择[J].高电压技术,2009,35(11):2603-2611.
|
[18] | Zhou Peihong,Zhao Jie,Lü Jinzhuang,et al.Arrester protection scheme and arrester parameters selection for ?800 kV YunGuang UHV DC converter station[J].High Voltage Engineering,2009,35(11):2603-2611(in Chinese).
|
[19] | 吕金壮,赵杰.云广?800 kV直流输电系统过电压与绝缘配合研究 [J].南方电网技术,2009,6(2):18-22.
|
[20] | Lü Jinzhuang,Zhao Jie.Study on overvoltage and insulation coordination of Yunnan-Guangdong ?800 kV UHVDC transmission system[J].Southern Power System Technology,2009,6(2):18-22(in Chinese).
|
[21] | 杨万开,王明新,曾南超,等.灵宝背靠背直流工程系统调试中的关键技术分析[J].电网技术,2007,31(10):35-36.
|
[22] | Yang Wankai,Wang Mingxin,Zeng Nanchao,et al.Analysis on several key technologies applied in system commissioning of Lingbao back-to-back HVDC project[J].Power System Technology,2007,31(10):35-36(in Chinese).
|
[23] | 陈锡磊,田杰,王东举,等.天生桥—广州直流工程控制保护系统改造后的过电压分析[J].电网技术,2011,35(6):101-106.
|
[24] | Zhou Hao,Chen Xilei,Chen Runhui,et al.Analysis on insulation coordination scheme for ?800 kV DC converter station[J].Power System Technology,2011,35(11):18-24(in Chinese).
|
[25] | 杨万开,印永华,曾南超,等.向家坝—上海?800 kV 特高压直流输电工程系统调试技术分析[J].电网技术,2011,35(7):19-23.
|
[26] | Yang Wankai,Yin Yonghua,Zeng Nanchao,et al.Analysis on commissioning test of ?800 kV UHVDC transmission project fromXiangjiaba to Shanghai [J].Power System Technology,2011,35(7):19-23 (in Chinese).
|
[27] | 袁士超,王东举,陈锡磊,等.天广直流系统中性母线过电压机制研究[J].电网技术,2011,35(5):216-222.
|
[28] | Yuan Shichao,Wang Dongju,Chen Xilei,et al.Study on neutral-bus overvoltage mechanism of ?500kV DC power transmission project from Tianshengqiao to Guangzhou[J].Power System Technology,2011,35(5):216-222(in Chinese).
|
[29] | 朱艺颖,呙虎,李新年,等.锦屏—苏南特高压直流输电工程直流线路电磁暂态仿真[J].电网技术,2009,33(6):1-4.
|
[30] | Zhu Yiying,Guo Hu,Li Xinnian,et al.Simulation on electromagnetic transient process in DC transmission line of ?800kV power transmission project from Jinping to South Jiangsu[J].Power System Technology,2009,33(6):1-4(in Chinese).
|
[31] | 陈锡磊,田杰,黄志岭,等.HVDC紧急停运时投旁通对策略对中性母线避雷器的影响[J].华东电力,2010,38(9):1355-1358.
|
[32] | Chen Xilei,Tian Jie,Huang Zhiling,et al.Impact of bypass strategy on neutral-bus arrester under emergency shutdown of HVDC[J].East China Electric Power,2010,38(9):1355-1358 (in Chinese).
|
[33] | 中国电力工程顾问集团公司.溪洛渡—浙西?800 kV、750万千瓦直流输电工程可行性研究[R].北京:中国电力工程顾问集团公司,2010.
|
[34] | 刘振亚.特高压直流输电系统过电压与绝缘配合[M].北京:中国电力出版社,2009:22-25.
|
[35] | 刘振亚.特高压直流输电技术研究成果专辑(2007年)[M].北京:中国电力出版社,2008:129-140.
|
[36] | CIGRE WG 14.32.HVDC converter stations for voltages above
|
[37] | ?600 kV[R].Paris:FRA,2002.
|
[38] | EPRI.Advanced HVDC systems at ?800 kV and above[R].Palo Alto,USA:EPRI,2007.
|
[39] | 黄莹,黎小林,饶宏,等.关于?800 kV直流输电换流阀绝缘裕度的讨论[J].南方电网技术,2006,3(2):23-27.
|
[40] | Huang Ying,Li Xiaolin,Rao Hong,et al.Discussion on the insulation maigin of thyristor valves for ?800 kV power transmission [J].Southern Power System Technology,2006,3(2):23-27(in Chinese).
|
[41] | GB311.1—1997,高压输变电设备的绝缘配合[S].
|
[42] | DL/T 620—1997,交流电气装置的过电压和绝缘配合[S].
|
[43] | 孙昕,刘泽洪,高理迎,等.?800 kV特高压直流工程创新实践[J].中国电机工程学报,2009,29(22):35-45.
|
[44] | Sun Xin,Liu Zehong,Gao Liying,et al.Practice and innovation in the ?800 kV UHV DC demonstration project[J].Proceedings of the CSEE,2009,29(22):35-45(in Chinese).
|
[45] | 舒印彪,刘泽洪,高理迎,等.?800 kV 6400MW特高压直流输电工程设计[J].电网技术,2006,30(1):1-7.
|
[46] | Shu Yinbiao,Liu Zehong,Gao Liying,et al.A preliminary exploration for design of ?800 kV UHVDC project with transmission capacity of 6400 MW[J].Power System Technology,2006,30(1):1-7(in Chinese).
|
[47] | 舒印彪,刘泽洪,袁骏,等.2005 年国家电网公司特高压输电论证工作综述[J].电网技术,2006,30(5):1-12.
|
[48] | Shu Yinbiao,Liu Zehong,Yuan Jun,et al.A survey on demonstration of UHV power transmission by State Grid Corporation of China in the year of 2005[J].Power System Technology,2006,30(5):1-12(in Chinese).
|
[49] | 聂定珍,袁智勇.?800 kV向家坝—上海直流工程换流站绝缘配合[J].电网技术,2007,31(14):1-5.
|
[50] | Nie Dingzhen,Yuan Zhiyong.Research on insulation coordination for ?800 kV UHVDC project from Xiangjiaba to Shanghai[J].Power System Technology,2007,31(14):1-5(in Chinese).
|
[51] | 聂定珍,马为民,李明.锦屏—苏南特高压直流工程换流站绝缘配合[J].高电压技术,2010,36(1):92-97.
|
[52] | Chen Xilei,Tian Jie,Wang Dongju,et al.Analysis on overvoltage in renovated control and protection system for HVDC power transmission project from Tianshengqiao to Guangzhou [J].Power System Technology,2011,35(6):101-106(in Chinese).
|
[53] | 周浩,陈锡磊,陈润辉,等.?800kV特高压直流换流站绝缘配合方案分析[J].电网技术,2011,35(11):18-24.
|