[1] | 周成,贺仁睦,王吉利,等.电力系统元件模型仿真准确度评估[J].电网技术,2009,33(14):12-15,46.
|
[2] | Zhou Cheng,He Renmu,Wang Jili,et al.Assessment on simulation accuracy of power system component models[J].Power System Technology,2009,33(14):12-15,46(in Chinese).
|
[3] | 李伟,杨红霞,熊佩华,等.基于PMU实测数据调整发电机模型参数的方法[J].电网技术,2009,33(2):89-93.
|
[4] | Li Wei,Yang Hongxia,Xiong Peihua,et al.Parameter adjustment of generator model by use of PMU-measured data[J].Power System Technology,2009,33(2):89-93(in Chinese).
|
[5] | 刘洪波,穆刚,徐兴伟,等.使功–频过程仿真轨迹逼近实测轨迹的模型参数调整[J].电网技术,2006,30(18):20-24.
|
[6] | Liu Hongbo,Mu Gang,Xu Xingwei,et al.Model parameter regulation to make simulated trajectory of power-frequency process draw near measured trajectory based on trajectory sensitivity[J].Power System Technology,2006,30(18):20-24(in Chinese).
|
[7] | 沈峰,贺仁睦,王君亮,等.基于非线性直接优化方法的发电机励磁系统参数辨识[J].电网技术,2007,31(8):73-77.
|
[8] | Shen Feng,He Renmu,Wang Junliang,et al.Parameter identification of generator excitation system based on nonlinear direct optimization algorithm[J].Power System Technology,2007,31(8):73-77(in Chinese).
|
[9] | 张少康,李兴源,王渝红.Prony算法在电力系统参数辨识中的应用[J].电网技术,2010,34(7):20-24.
|
[10] | Zhang Shaokang,Li Xingyuan,Wang Yuhong.Application of Prony algorithm in power system parameter identification[J].Power System Technology,2010,34(7):20-24(in Chinese).
|
[11] | 沈峰,贺仁睦,谢永红.基于实测扰动的励磁系统参数辨识可行性研究[J].电网技术,2008,32(10):69-74.
|
[12] | Shen Feng,He Renmu,Xie Yonghong.Study on feasibility of excitation system parameter identification based on actual measurement of disturbance[J].Power System Technology,2008,32(10):69-74(in Chinese).
|
[13] | IEEE Std 1110-2002.IEEE guide for synchronous generator modeling practices and applications in power system stability analysis[S].
|
[14] | De Mello F P,Ribeiro J R.Derivation of synchronous machine parameters from tests[J].IEEE Trans on Power Apparatus and Systems,1977,96(4):1211-1218.
|
[15] | De Mello F P,Hannett L H.Validation of synchronous machine models and derivation of model parameters from tests[J].IEEE Trans on Power Apparatus and Systems,1981,100(2):662-672.
|
[16] | Bortoni E D C,Jardini J A.Identification of synchronous machine parameters using load rejection test data[J].IEEE Trans on Energy Conversion,2002,17(2):242-247.
|
[17] | 成中昀.采用d、q轴抛载法测量同步电机参数[J].大电机技术,1994(1):32-36,63.
|
[18] | Cheng Zhongyun.Application of the d, q-axis load rejection method to measuring parameters of synchronous electric machine[J].Large Electric Machine and Hydraulic Turbine,1994(1):32-36,63(in Chinese).
|
[19] | 张爱玲.同步发电机突然从电网切除后端电压分析及参数求取[J].中国电机工程学报,2000,20(12):28-32,37.
|
[20] | Zhang Ailing.Analysis of terminal voltage and calculation of parameters of synchronous machine switched out from bus system[J].Proceedings of the CSEE,2000,20(12):28-32,37(in Chinese).
|
[21] | 岳陈熙,甄威,刘柏私,等.同步发电机参数的一次性任意抛载测试方法[J].高电压技术,2008,34(2):319-323.
|
[22] | Yue Chenxi,Zhen Wei,Liu Bosi,et al.New load rejection test method for parameter estimation of synchronous generators[J].High Voltage Engineering,2008,34(2):319-323(in Chinese).
|
[23] | Mohamed A,Hussain A.A systematic approach in estimating the generator parameters[J].Electric Power Components and Systems,2002,30(3):301-313.
|
[24] | Wamkeue R,Baetscher F,Kamwa I.Hybrid-state-model-based time-domain identification of synchronous machine parameters from saturated load rejection test records[J].IEEE Trans on energy Conversion,2008,23(1):68-77.
|
[25] | Wamkeue R,Jolette C,Kairous D.Estimation of synchronous generator parameters from load rejection analytical responses[C]// 2010 9th International Conference on Environment and Electrical Engineering.Prague,Czech Republic:IEEE,2010:392-395.
|
[26] | Umans S D,Mallick J A,Wilson G L.Modeling of solid rotor turbogenerators-Part I & II[J].IEEE Trans on Power Apparatus and Systems,1978,97(1):269-291.
|
[27] | Wamkeue R,Kamwa I,Baetscher F,et al.A new and efficient approach for analysis of a saturated synchronous generator under the load rejection test[J].Electric Power Components and Systems,2006,34(5):539-563.
|
[28] | Wamkeue R,Jolette C,Kamwa I.Alternative approaches for linear analysis and prediction of a synchronous generator under partial- and full-load rejection tests[J].IET Electric Power Application,2007,1(4):581-590.
|
[29] | Wang Qingguo,Guo Xin,Zhang Yong.Direct identification of continuous time delay systems from step responses[J].Journal of Process Control,2001,11(5):531-542.
|
[30] | Wang Qingguo,Zhang Yong.Robust identification of continuous systems with dead-time from step responses[J].Automatica,2001,37(3):377-390.
|
[31] | Ahmed S,Huang B,Shah S L.Identification from step responses with transient initial conditions[J].Journal of Process Control,2008,18(2): 121-130.
|
[32] | Ljung L.System identification: theory for the user[M].New Jersey:Prentice Hall PTR,1999.
|