[1] | David A K,Wen F S.Transmission planning and investment under competitive electricity market environment[C].Proceedings of IEEE Power Engineering Society Summer Meeting.Vancouver Canada,2001:1725-1730.
|
[2] | 康重庆,白超利,夏清,等.电力市场中发电商的风险决策[J].中国电机工程学报,2004,24(8):1-6.
|
[3] | Kang Chongqing,Bai Chaoli,Xia Qing,et al.Risk decision-making of generations in electricity market[J].Proceedings of the CSEE,2004,24(8):1-6.
|
[4] | 赵新宇,王锡凡,陈皓勇.火电厂投资风险决策的模型与整体框架[J].中国电机工程学报,2004,24(8):7-11.
|
[5] | Zhao Xinyu,Wang Xifan,Chen Haoyong.Strategy decision model and framework of thermal power generation investment [J].Proceedings of the CSEE,2004,24(8):7-11.
|
[6] | 赵新宇,王锡凡,陈皓勇.火电厂投资决策的算法和灵敏度分析[J].中国电机工程学报,2004,24(10):15-20.
|
[7] | Zhao Xinyu,Wang Xifan,Chen Haoyong.Strategy decision algorithm and sensitivity analysis of thermal power generation investment [J].Proceedings of the CSEE,2004,24(10):15-20.
|
[8] | Saraiva J T,Miranda V,Pinto L M V G.Impact on some planning decisions from a fuzzy modeling[J].IEEE Trans on Power Systems,1994,9(2):819-825.
|
[9] | Madan S,Bollinger K E.Applications of artificial intelligence in power systems[J].Electric Power Systems Research,1997,41(2):117-131.
|
[10] | DE la Torre T,Feltes J W,Gomez T,et al.Deregulation,privatization,and competition:transmission planning under uncertainty[J].IEEE Trans on Power Systems,1999,14(2):460-465.
|
[11] | Crousillat E O,Dorifner P,Alvarado P,et al.Conflicting objectives and risk in power system planning[J].IEEE Trans on Power Systems,1993,8(3):887-893.
|
[12] | 曾庆禹.电力市场条件下的发输电规划协调与运行模式[J].电力系统自动化,2004,28(5):1-5.
|
[13] | Zeng Qingyu.Generation/transmission expansion planning model and operation model in power marker[J].Automation of Electric Power Systems,2004,28(5):1-5.
|
[14] | 王路.公用电网——电力传输和电力市场的共同载体[J].中国电力企业管理,2004,(11):40-42.
|
[15] | 周安石,康重庆,洪元瑞,等.电力工业可持续发展的统一规划模型[J].电力系统自动化,2005,29(7):28-32.
|
[16] | Zhou Anshi,Kang Chongqing,Hong Yuanrui,et al.Power system expansion-planning model considering the strategy of sustainable development[J].Automation of Electric Power Systems,2005,29(7):28-32.
|
[17] | 朱旭凯,刘文颖,杨以涵.综合考虑可靠性因素的电网规划新方法[J].电网技术,2004,28(21):51-54.
|
[18] | Zhu Xukai,Liu Wenying,Yang Yihan.A new power network planning method by comprehensively considering system reliability factors [J].Power System Technology,2004,28(21):51-54.
|
[19] | 何大愚.一年以后对美加“8.14”大停电事故的反思[J].电网技术,2004,28(21):1-5.
|
[20] | He Dayu.Rethinking over “8.14” US-Canada blackout after one year[J].Power System Technology,2004,28(21):1-5.
|
[21] | Wang Lu.Common grid—the common carrier of power transmission and power market[J].China Power Enterprise Management,2004,(11):40-42.
|
[22] | 王锡凡.电力系统优化规划[M].北京:水利电力出版社,1990.
|
[23] | 孙嘉平,郭基伟.世界能源与电力宏观指标分析[J].中国电力,2005,38(1):12-16.
|
[24] | Sun Jiaping,Guo Jiwei.Analysis on the macroscopical guideline of energy and electricity in the world[J].Electric Power,2005,38(1):12-16.
|