[1] | Yin Yonghua,Guo Jianbo,Zhao Jianjun,et al.Preliminary analysis of large scale blackout in interconnected North America power grid on August 14 and lessons to be drawn[J].Power System Technology,2003,27(10):8-11.
|
[2] | Shaaban M,Liu Haoming,Li Weixing,et al.ATC Calculation with steady-state security constraints using Benders decomposition [J].Proceedings of the CSEE,2003,23(8):7-11.
|
[3] | 刘明波,夏岩,吴捷.计及暂态稳定约束的可用传输容量计算[J].中国电机工程学报,2003,23(9):28-33.
|
[4] | Liu Mingbo,Xia Yan,Wu Jie.Calculation of available transfer capability with transient stability constraints[J].Proceedings of the CSEE,2003,23(9):28-33.
|
[5] | 李国庆,郑浩野.一种考虑暂态稳定约束的可用输电能力计算的新方法[J].中国电机工程学报,2005,25(15):21-25.
|
[6] | Li Guoqing,Zheng Haoye.A novel algorithm for available transfer capability considering transient stability constraints[J].Proceedings of the CSEE,2005,25(15):21-25.
|
[7] | 周孝信,郑健超,沈国荣,等.从美加东北部电网大面积停电事故中吸取教训[J].电网技术,2003,27(9):T1.
|
[8] | 何大愚.一年以后对美加“8.14”大停电事故的反思[J].电网技术,2004,28(21):1-5.
|
[9] | He Dayu.Rethinking over ‘8.14’ US-Canada blackout after one year [J].Power System Technology,2004,28(21):1-5.
|
[10] | 胡学浩.美加联合电网大面积停电事故的反思和启示[J].电网技术,2003,27(9):T2-T6.
|
[11] | Hu Xuehao.Rethinking and enlightenment of large scope blackout in interconnected North America power grid[J].Power System Technology,2003,27(9):T2-T6.
|
[12] | 印永华,郭剑波,赵建军,等.美加“8.14”大停电事故初步分析以及应吸取的教训[J].电网技术,2003,27(10):8-11.
|
[13] | 唐葆生.伦敦南部地区大停电及其教训[J].电网技术,2003,27(11):1-6.
|
[14] | Tang Baosheng.Blackout in South of London and its lessons [J].Power System Technology,2003,27(11):1-6.
|
[15] | 韩祯祥,曹一家.电力系统的安全性及防治措施[J].电网技术,2004,28(9):1-6.
|
[16] | Han Zhenxiang,Cao Yijia.Power system security to ensure reliable delivery[J].Power System Technology,2004,28(9):1-6.
|
[17] | 屈靖,郭剑波.“九五”期间我国电网事故统计分析[J].电网技术,2004,28(21):60-62.
|
[18] | Qu Jing,Guo Jianbo.Statistics and analysis of faults in main domestic power systems from 1996 to 2000[J].Power System Technology,2004,28(21):60-62.
|
[19] | 王锡凡.电力市场条件下电网的安全保证体系[J].电网技术,2004,28(9):7-13.
|
[20] | Wang Xifan.Electric network security setup in electricity market environment[J].Power System Technology,2004,28(9):7-13.
|
[21] | Stott B,Alsac O,Alvarado F L.Analytical and computational improvement in performance index raking algorithm for networks [J].International Journal of Electrical Power and Energy Systems,1985,7(3):154-160.
|
[22] | Mikolinas T A,Wollenberg B F.An advanced contingency selection algorithm[J].IEEE Trans on Power Systems and Apparatus,1981,PAS-100(1):608-617.
|
[23] | 李国庆,王成山,余贻鑫.大型互联电力系统区域间功率交换能力研究综述[J].中国电机工程学报,2001,21(4):21-25.
|
[24] | Li Guoqing,Wang Chengshan,Yu Yixin.A survey on transmission transfer capability of interconnected electric power systems [J].Proceedings of the CSEE,2001,21(4):21-25.
|
[25] | 默哈莫德·夏班,刘皓明,李卫星,等.静态安全约束下基于 Benders分解算法的可用传输容量计算[J].中国电机工程学报,2003,23(8):7-11.
|
[26] | Sombuttwilailert G,Eua-Arporn B.Iterative linear estimation for total transfer capability evaluation[C].Power Engineering Society Summer Meeting,2001,2:1127-1132.
|
[27] | 王锡凡,王秀丽.实用电力系统静态安全分析[J].西安交通大学学报,1988,22(1):25-36.
|
[28] | Wang Xifan,Wang Xiuli.Practical contingency analysis of power systems[J].Journal of Xi'an Jiaotong University,1988,22(1):25-36.
|