[1] | 14 (3):64,65.
|
[2] | 孙昭英.第一代500千伏杆塔用于漫昆线的可行性研究[J].电网技术,1990,14(3):59-63.
|
[3] | Sun Zhaoying.The feasibility of applying some types of tower of 500kV transmission lines at plain area to high altitude area[J].Power System Technology,1990,14(3):59-63.
|
[4] | 胡毅,聂定珍,王力农.500 kV同塔双回紧凑型线路的带电作业安全距离[J].高电压技术,2003,29(8):3-11.
|
[5] | Hu Yi,Nie Dingzhen,Wang Linong.The research of safe distance for live working on 500kV compact double circuit transmission line[J].High Voltage Engineering,2003,29(8):3-11.
|
[6] | 王力农,胡毅,刘凯,等.500 kV高海拔紧凑型线路带电作业研究[J].高电压技术,2005,31(8):12-14.
|
[7] | Wang Linong,Hu Yi,Liu Kai,et al.Research of live working on 500 kV compact transmission lines in high altitude area[J].High Voltage Engineering,2005,31(8):12-14.
|
[8] | 舒印彪,赵丞华.研究实施中的500kV同塔双回紧凑型输电线路[J].电网技术,2002,26(4):49-51.
|
[9] | Shu Yinbiao,Zhao Chenghua.Study and implementation of 500 kV compact power transmission line with double circuits on a same tower in China[J].Power System Technology,2002,26(4):49-51.
|
[10] | 刘亚芳,袁亦超,王惠仁,等. 500kV紧凑型输电技术的研究[J].电网技术,1999,23(2):55-58.
|
[11] | Liu Yafang,Yuan Yichao,Wang Huiren,et al.Study of 500kV compact transmission technology[J].Power System Technology,1999,23(2):55-58.
|
[12] | 于幼文,金永纯.昌房500kV紧凑型输电线路中的关键技术[J].电网技术,2003,27(7):75-77.
|
[13] | Yu Youwen,Jin Yongchun.Key technologies for 500kV compact transmission line from Changping to Fangshan[J].Power System Technology,2003,27(7):75-77.
|
[14] | 项立人.紧凑型线路发展现状及在我国应用的前景[J].电网技术,1996,20(2):1-5.
|
[15] | Xiang Liren.The present situation of compact line development and its application prospect in China[J].Power System Technology,1996,20(2):1-5.
|
[16] | 王绍德,李耀玲.昌房500kV紧凑型线路运行特性分析[J].电网技术,2000,24(2):12-15.
|
[17] | Wang Shaode,Li Yaoling.Analysis on operation characteristics of 500kV Changping-Fangshan compact transmission line[J].Power System Technology,2000,24(2):12-15.
|
[18] | 张海军,张国亮,赵雪松,等.500 kV紧凑型输电线路耐张塔带电作业工具的研制[J].电网技术,2005,29(24):82-84.
|
[19] | 扈从凤.220 kV紧凑型输电线路的设计经验及对500 kV紧凑型线路的探讨[J].电网技术,1994,18(4):5-8.
|
[20] | 胡毅,翁旭,席时显,等.500 kV同塔双回线路带电作业试验研究[J].高电压技术,1999,25(3):61-63.
|
[21] | Hu Yi,Weng Xu,Xi Shixian,et al.The test and research of live working on 500kV double circuit transmission line[J].High Voltage Engineering,1999,25(3):61-63.
|
[22] | Hu Congfeng.Experience in design of 220kV compact transmission lines and investigation on feasibility of compact lines for 500 kV power system[J].Power System Technology,1994,18(4):5-8.
|
[23] | 邵方殷.紧凑型线路发展现状及几点建议[J].电网技术,1993,17(4):11-15,34.
|
[24] | Shao Fangyin.A review of the development of compact transmission lines and several suggestions[J].Power System Technology,1993,17(4):11-15,34.
|
[25] | 衣立东,吕世荣.750 kV输变电示范工程施工关键技术的研究与应用[J].电网技术,2006,30(3):51-56.
|
[26] | Yi Lidong,Lü Shirong.Study and application of construction key technologies for 750 kV transmission and transformation demonstration project[J].Power System Technology,2006,30(3):51-56.
|
[27] | 胡毅,王力农,邵瑰玮,等.750 kV输电线路带电作业的试验研究[J].电网技术,2006,30(2):14-18.
|
[28] | Hu Yi,Wang Linong,Shao Guiwei,et al.An experimental investigation on live line work for 750 kV transmission line[J].Power System Technology,2006,30(2):14-18.
|
[29] | 印永华,房喜,朱跃.750 kV输变电示范工程系统调试概况[J].电网技术,2005,29(20):1-9.
|
[30] | Yin Yonghua,Fang Xi,Zhu Yue.General situation of system commissioning for 750kV transmission pilot project[J].Power System Technology,2005,29(20):1-9.
|
[31] | 邵方殷.330 kV紧凑型输电线路导线选型[J].电网技术,1994,18(5):11-17.
|
[32] | Shao Fangyin.Conductor configuration for 330kV compact transmission line[J].Power System Technology,1994,18(5):11-17.
|
[33] | DL409-1991,电业安全工作规程[S].
|
[34] | DL/T 620-1997,交流电气装置的过电压保护和绝缘配合[S].
|
[35] | 张纬钹,何金良.过电压防护及绝缘配合[M].北京:清华大学出版社,2002.
|
[36] | IEC 70-1,Insulation coordination part 1:definitions,principles and rules[S].
|
[37] | 清华大学.甘肃330kV炳-和-银紧缩型输电线路内部过电压研究[R].北京:清华大学,2004.
|
[38] | GB/T 18037-2000,带电作业工具基本技术要求与设计导则[S].
|