[1] | 高厚磊,江世芳,贺家李.利用卫星时间作基准的电力系统同步相量测量[J].电力系统及其自动化学报,1995,7(4):33-39.
|
[2] | Gao Houlei,Jiang Shifang,He Jiali.Synchronized phasor measurement in power system using satellite time reference [J].Proceedings of the EPSA,1995,7(4):33-39.
|
[3] | 常乃超,兰洲,甘德强,等.广域测量系统在电力系统分析及控制中的应用综述[J].电网技术,2005,29(10):46-52.
|
[4] | Chang Naichao,Lan Zhou,Gan Deqiang,et al.A survey on applications of wide-area measurement system in power system analysis and control[J].Power System Technology,2005,29(10):46-52.
|
[5] | 卢志刚,郝玉山,康庆平,等.电力系统相角测量和应用[J].电力系统自动化,1997,21(4):41-43.
|
[6] | Lu Zhigang,Hao Yushan,Kang Qingping,et al.Phasor measurement and its application in power system[J].Automation of Electric Power Systems,1997,21(4):41-43.
|
[7] | 李丹,韩福坤,郭子明,等.华北电网广域实时动态监测系统[J].电网技术,2004,28(23):52-56.
|
[8] | Li Dan,Han Fukun,Guo Ziming,et al.Wide-area real time dynamic security monitoring system of North China power grid[J].Power System Technology,2004,28(23):52-56.
|
[9] | 许树楷,谢小荣,辛耀中.基于同步相量测量技术的广域测量系统应用现状及发展前景[J].电网技术,2005,29(2):44-49.
|
[10] | Xu Shukai,Xie Xiaorong,Xin Yaozhong.Present application situation and development tendency of synchronous phasor measurement technology based wide area measurement system[J].Power System Technology,2005,29(2):44-49.
|
[11] | 刘道伟,谢小荣,穆钢,等.基于同步相量测量的电力系统在线电压稳定指标[J].中国电机工程学报,2005,25(1):13-17.
|
[12] | Liu Daowei,Xie Xiaorong,Mu Gang,et al.An on-line voltage stability index of power system based on synchronized phasor measurement[J].Proceedings of the CSEE,2005,25(1):13-17.
|
[13] | 毛安家,郭志忠.与SCADA互补的WAMS 中PMU的配置及数据处理方法[J].电网技术,2005,29(5):71-75.
|
[14] | Mao Anjia,Guo Zhizhong.A practical placement of PMU in WAMS complemental to SCADA and data processing method[J].Power System Technology,2005,29(5):71-75.
|
[15] | 王克英,穆钢,韩学山,等.使潮流方程直接可解的PMU配置方案研究[J].中国电机工程学报,1999,19(10):14-16.
|
[16] | Wang Keying,Mu Gang,Han Xueshan,et al.Placement of phasor measurement unit for direct solution of power flow[J].Proceedings of the CSEE,1999,19(10):14-16.
|
[17] | 王克英.基于部分量测的解耦计算方法及其在稳态分析中的应用[D].哈尔滨:哈尔滨工业大学,2000.
|
[18] | Phadke A G,Thorp J S,Karimi K J.State estimation with phasor measurements[J].IEEE Trans on Power Systems,1986,1(1):233-241.
|
[19] | Baldwin T L,Mili L,Boisen M B,et al.Power system observability with minimal phasor measurement placement[J].IEEE Trans on Power Systems,1993,8(2):707-715.
|
[20] | 卢志刚,郝玉山,康庆平,等.启发式遗传算法在优化电力系统相角测量装置安装地点中的应用[J].电网技术,1998,22(8):14-17.
|
[21] | Lu Zhigang,Hao Yushan,Kang Qingping,et al.Heuristic genetic algorithm in minimal phasor measurement unit placement for electric power system[J].Power System Technology,1998,22(8):14-17.
|
[22] | Ki-Seon Cho,Joong-Rin Shin,Seung Ho Hyun.Optimal placement of phasor measurement units with GPS receiver[C].IEEE Power Engineering Society Winter Meeting,2001:258-262.
|
[23] | 彭疆南,孙元章,王海风.考虑系统完全可观测性的PMU最优配置方法[J].电力系统自动化,2003,27(4):10-16.
|
[24] | Peng Jiangnan,Sun Yuanzhang,Wang Haifeng.An optimal PMU placement algorithm for full network observability[J].Automation of Electric Power Systems,2003,27(4):10-16.
|
[25] | 卫志农,孙国强,常宝立,等.考虑电力系统潮流直接可解的同步相量测量单元最优配置[J].电网技术,2005,29(1):65-68.
|
[26] | Wei Zhinong,Sun Guoqiang,Chang Baoli,et al.Optimal configuration of synchronous phasor measurement unit considering direct solvable power flow[J].Power System Technology,2005,29(1):65-68.
|
[27] | 李强,于尔铿,吕世超,等.一种改进的相量测量装置最优配置方法[J].电网技术,2005,29(12):57-62.
|
[28] | Li Qiang,Yu Erkeng,Lü Shichao,et al.An improved optimal phasor measurement unit placement algorithm[J].Power System Technology,2005,29(12):57-62.
|
[29] | 王克英,穆钢,陈学允.计及PMU精度的状态估计精度分析及配置研究[J].中国电机工程学报,2001,21(8):29-33.
|
[30] | Wang Keying,Mu Gang,Chen Xueyun.Precision improvement and PMU placement studies on state estimation of a hybrid measurement system with PMUs[J].Proceedings of the CSEE,2001,21(8):29-33.
|