[1] | 许树楷,谢小荣,辛耀中.基于同步相量测量技术的广域测量系统应用现状及发展前景[J].电网技术,2005,29(2):44-49.
|
[2] | Xu Shukai,Xie Xiaorong,Xin Yaozhong.Present application situation and development tendency of synchronous phasor measurement technology based wide area measurement system[J].Power System Technology,2005,29(2):44-49(in Chinese).
|
[3] | 罗建裕,王小英,鲁庭瑞,等.基于广域测量技术的电网实时动态监测系统应用[J].电力系统自动化,2003,27(24):78-80.
|
[4] | Luo Jianyu,Wang Xiaoying,Lu Tingrui,et al.An application of power system real-time dynamic monitoring system based on wide-area measurement[J].Automation of Electric Power Systems,2003,27(24):78-80(in Chinese).
|
[5] | Hauer J F.Validation of phasor calculations in the marcrodyne PMU for California-Oregon Transmission Project Tests of March 1993 [J].IEEE Trans on Power Delivery,1996,11(3):1224-1231.
|
[6] | 卢志刚,赫玉山,康庆平,等.电力系统相角测量和应用[J].电力系统自动化,1997,21(4):41-43.
|
[7] | Lu Zhigang,Hao Yushan,Kang Qingping,et al.Phasor measurement and its application in power system[J].Automation of Electric Power Systems,1997,21(4):41-43(in Chinese).
|
[8] | 滕林,刘万顺,贠志皓,等.电力系统暂态稳定实时紧急控制的研究[J].中国电机工程学报,2003,23(1):64-69.
|
[9] | Teng Lin,Liu Wanshun,Yun Zhihao,et al.Study of real time power system transient stability emergency control[J].Proceedings of the CSEE,2003,23(1):64-69(in Chinese).
|
[10] | 黄莹,徐政.基于同步相量测量单元的直流附加控制器研究[J].中国电机工程学报,2004,24(9):7-12.
|
[11] | Huang Ying,Xu Zheng.HVDC supplementary controller based on synchronized phasor measurement units[J].Proceedings of the CSEE,2004,24(9):7-12(in Chinese).
|
[12] | 谢小荣,李红军,吴京涛,等.同步相量技术应用于电力系统暂态稳定性控制的可行性分析[J].电网技术,2004,28(1):10-14.
|
[13] | Xie Xiaorong,Li Hongjun,Wu Jingtao,et al.Feasibility study on using synchrophasor technology for power system transient stability control[J].Power System Technology,2004,28(1):10-14(in Chinese).
|
[14] | 刘道伟,谢小荣,穆钢,等.基于同步相量测量的电力系统在线电压稳定指标[J].中国电机工程学报,2005,25(1):13-17.
|
[15] | Liu Daowei,Xie Xiaorong,Mu Gang,et al.An on-line voltage stability index of power system based on synchronized phasor measurement[J].Proceedings of the CSEE,2005,25(1):13-17(in Chinese).
|
[16] | 毛安家,郭志忠.与SCADA 互补的WAMS 中PMU 的配置及数据处理方法[J].电网技术,2005,29(8):71-74.
|
[17] | Mao Anjia,Guo Zhizhong.A practical placement of PMU in WAMS complemental to SCADA and data processing method[J].Power System Technology,2005,29(8):71-74(in Chinese).
|
[18] | Milosevic B,Begovic M.Nondominated sorting genetic algorithm for optimal phasor measurement placement[J].IEEE Trans on Power Systems,2003,18(1):69-75.
|
[19] | 卫志农,孙国强,常宝立,等.考虑电力系统潮流直接可解的同步相量量测单元最优配置[J].电网技术,2005,29(1):65-68.
|
[20] | Wei Zhinong,Sun Guoqiang,Chang Baoli,et al.Optimal configuration of synchronous phasor measurement unit considering direct solvable power flow[J].Power System Technology,2005,29(1):65-68(in Chinese).
|
[21] | 王克英,穆钢,韩学山,等.使潮流方程直接可解的PMU配置方案研究[J].中国电机工程学报,1999,19(10):14-16.
|
[22] | 沙智明,郝育黔,郝玉山,等.电力系统PMU安装地点选择优化算法的研究[J].继电器,2005,4(5):31-36.
|
[23] | Sha Zhiming,Hao Yuqian,Hao Yushan,et al.A new algorithm for PMU placement optimization in power system[J].Relay,2005,4(5):31-36(in Chinese).
|
[24] | Hong Chanchang,Cheng Chienkuo.Network reconfiguration in distribution systems using simulated annealing[J].Electric Power Systems Research,1994,29(3):227-238.
|
[25] | Federico Milano.Documentation for PSAT version 1.3.1[Z],2004.
|
[26] | 彭疆南,孙元章,王海风.考虑系统完全可观测性的PMU最优配置方法[J].电力系统自动化,2003,27(4):10-16.
|
[27] | Peng Jiangnan,Sun Yuanzhang,Wang Haifeng.An optimal PMU placement algorithm for full network observability[J].Automation of Electric Power Systems,2003,27(4):10-16(in Chinese).
|
[28] | 韩静,徐丽杰,苏玲.电力系统无功优化在线计算的算法研究[J].电力科学与工程,2005,1(1):8-12.
|
[29] | Han Jing,Xu Lijie,Su Ling.An on-line reactive power optimization method for electric power systems[J].Electric Power Science and Engineering,2005,1(1):8-12(in Chinese).
|
[30] | Wang Keying,Mu Gang,Han Xueshan,et al.Placement of phasor measurement unit for direct solution of power flow[J].Proceedings of the CSEE,1999,19(10):14-16(in Chinese).
|
[31] | Baldwin T L,Mili L,Boisen M B,et al.Power system observability with minimal phasor measurement placement[J].IEEE Trans on Power Systems,1993,8(5):707-715.
|
[32] | 李强,于尔铿,吕世超,等.一种改进的相量测量装置最优配置方法[J].电网技术,2005,29(12):57-64.
|
[33] | Li Qiang,Yu Erkeng,Lü Shichao,et al.An improved optimal phasor measurement unit placement algorithm[J].Power System Technology,2005,29(12):57-64(in Chinese).
|
[34] | 高荣芳.Minimum spanning tree(MST) 的计算方法[J].陕西广播电视大学学报,2003,6(2):94-96.
|
[35] | 刘健,杨文宇,余健明,等. 基于改进最小生成树算法并考虑负荷不确定性的配电网架最优规划[J].电网技术,2005,29(16):61-65.
|
[36] | Liu Jian,Yang Wenyu,Yu Jianming,et al.Optimal distribution network planning based on improved minimal cost spanning tree algorithm and considering indeterminacy of power loads[J].Power System Technology,2005,29(16):61-65(in Chinese).
|
[37] | Monticelli A,Wu F F.Network observability theory[J].IEEE Trans on Power Apparatus and Systems,1985,PAS-4(5):1042-1048.
|
[38] | Goodaire E G,Parmenter M M.Discrete mathematics with graph theory[M].Prentice Hall,1998.
|