Yu Xiaodan,Jia Hongjie,Chen Jianhua.A preliminary research on power system cascading contingency forecasting[J].Power System Technology,2006,30(13):20-25(in Chinese).
Liu Yongqi,Xie Kai.Analysis on blackout of interconnected north america power grid occurred on August.14,2003 from the viewpoint of power system dispatching[J].Power System Technology,2004, 28(8):10-15,45(in Chinese).
Zhao Xizheng.Strengthen power system security to ensure relable power delivery[J] . Power System Technology,2003,27(10):1-7(in Chinese).
[8]
US Canada Power System Outage Task Force.Final report on the August 14,2003 blackout in the United States and Canada:Causes and recommendations[R].2004.
Xue Yusheng.The way from a simple contingency to system-wide disaster:lessons from the eastern interconnection blackout in 2003 [J].Automation of Electric Power Systems,2003,27(18):1-5(in Chinese).
[11]
Li Jingsheng.A survey on planning of Tianjin power network during the 11th five-year plan[J].Power System Technology,2006,30(20):1-5(in Chinese).
Wang Yue,Helmut Rebstock.Application of medium voltage vacuum circuit breakers to ensure power supply system reliability of intercity network[J].Power System Technology,2006,30(2):102-106(in Chinese).
He Fei,Mei Shengwei,Xue Ancheng,et al.Blackouts distribution and self-organized criticality of power system based on DC power flow[J].Power System Technology,2006,30(14):7-12(in Chinese).