[1] | CIGRE Working Group 14.32.HVDC converter station for voltages above 600kV[C].GIGRE,2002.
|
[2] | 赵良,李蓓,卜广全,等.云南—广东±800 kV直流输电系统动态等值研究[J].电网技术,2006,30(16):10-14.
|
[3] | Zhao Liang,Li Bei,Bu Guangquan,et al.Study on dynamic equivalence of ±800 kV DC transmission system from Yunnan to Guangdong[J].Power System Technology,2006,30(16):10-14(in Chinese).
|
[4] | ±800kV特高压直流工作联络组.特高压工作组第一次、第二次、第三次工作会议会议纪要[Z].北京:±800kV特高压直流工作联络组,2005.
|
[5] | 范建斌,于永清,刘泽洪,等.±800 kV特高压直流输电标准体系的建立[J].电网技术,2006,30(14):13-18.
|
[6] | Fan Jianbin,Yu Yongqing,Liu Zehong,et al.Introduction of±800 kV HVDC transmission standards system[J].Power System Technology,2006,30(14):13-18(in Chinese).
|
[7] | 吴宝英,陈允鹏,陈旭,等.±800kV云广直流输电工程对南方电网安全稳定的影响[J].电网技术,2006,30(22):9-16.
|
[8] | Wu Baoying,Chen Yunpeng,Chen Xu,et al.Study on impacts of
|
[9] | ±800 kV Yunnan-Guangdong HVDC transmission project on security and stability of China Southern Power Grid[J].Power System Technology,2006,30(22):9-16(in Chinese).
|
[10] | 周静,马为民,石岩,等.±800kV直流输电系统的可靠性及其提高措施[J].电网技术,2007,31(3):11-16.
|
[11] | Zhou Jing,Ma Weimin,Shi Yan,et al.Study on reliability of ±800 kV UHVDC power transmission and its improvement measures [J].Power System Technology,2007,31(3):11-16(in Chinese).
|
[12] | ABB.The 800kV HVDC transmission project-insulation coordination,
|
[13] | preliminary design[Z].Ludvika:ABB,2005.
|
[14] | ABB.The 800kV DC insulation margin for thyristor valves [Z].Ludvika:ABB,2005.
|
[15] | ABB.The 800kV margin between internal insulation and bushing withstand[Z].Ludvika:ABB,2005.
|
[16] | 国网直流工程建设有限公司.向家坝-上海±800kV特高压直流输电工程功能规范书[Z].北京:国网直流工程建设有限公司,2006.
|
[17] | 蒋兴良,苑吉河,孙才新,等.我国±800kV特高压直流输电线路外绝缘问题[J].电网技术,2006,30(9):3-11.
|
[18] | Jiang Xingliang,Yuan Jihe,Sun Caixin,et al.External insulation of ±800 kV UHV DC power transmission lines in China[J].Power System Technology,2006,30(9):3-11(in Chinese).
|
[19] | 张文亮.复合绝缘子在±800kV特高压直流工程中的应用研究[J].电网技术,2006,30(12):12-15.
|
[20] | Zhang Wenliang.Study of application of composite insulator on
|
[21] | ±800 kV UHVDC transmission line[J].Power System Technology,2006,30(12):12-15(in Chinese).
|
[22] | 舒印彪,刘泽洪,高理迎,等.± 800kV 6400MW特高压直流输电工程设计[J].电网技术,2006,30(1):1-7.
|
[23] | Shu Yinbiao,Liu Zehong,Gao Liying,et al.A preliminary exploration for design of ±800kV UHVDC project with transmission capacity of 6400MW[J].Power System Technology,2006,30(1):1-7(in Chinese).
|
[24] | 刘振亚.特高压电网[M].北京:中国经济出版社,2005.
|
[25] | 舒印彪.中国直流输电的现状及展望[J].高电压技术,2004,30(11):1, 17-20.
|
[26] | Shu Yinbiao.Present status and prospect of HVDC transmission in China[J].High Voltage Engineering,2004,30(11):1, 17-20(in Chinese).
|
[27] | 常浩.我国高压直流输电工程国产化回顾及现状[J].高电压技术,2004,30(11):30-36.
|
[28] | Chang Hao.Situation & overview of HVDC system localization of China[J].High Voltage Engineering,2004,30(11):30-36(in Chinese).
|