[1] | 谢开,于尔铿,刘广一,等.电力市场中的输电服务(二)辅助服务及其定价[J].电网技术,1997,21(4):58-63.
|
[2] | Xie Ka,Yu erkeng,Liu Guangyi,et al.Transmission services in electricity market (Ⅱ)-ancillary services supplying and pricing [J].Power System Technology,1997,21(4):58-63(in Chinese).
|
[3] | Sullivan J O,Power M,Flynn M,et al.Modeling of frequency control in an island system[C].Power Engineering Society 1999 Winter Meeting,1999:574 -579.
|
[4] | 陈明,程浩忠,李舟演,等.上海电网应对大功率直流事故的能力分析与对策[J].电网技术,2006,30(10):34-38.
|
[5] | Chen Ming,Cheng Haozhong,Li Zhouyan,et al.Analysis on capability of uints in Shanghai power grid to cope with severe HVDC accidents and corresponding countermeasures[J].Power System Technology,2006,30(10):34-38(in Chinese).
|
[6] | Graeme A ,Wigdorowitz B. A methodology for the redesign of frequency control for ac networks[J].IEEE Trans Power Systems,2004,19(3):1546-1554.
|
[7] | 张毅明,罗承廉,孟远景,等.河南电网频率响应及机组一次调频问题的分析研究[J].中国电力,2002,35(7):35-38.
|
[8] | Zhang Yiming,Luo ChengLian,Meng Yuanjing,et al.Analysis on frequency response and primary frequency regulation of generator units in Henan power system[J].Electric Power,2002,35(7):35-38 (in Chinese).
|
[9] | 魏路平.浙江电网机组一次调频问题的分析研究[J].浙江电力,2004,(1):26-28.
|
[10] | Wei Luping.Analysis and study on the generators performance of primary frequency modulation in Zhejiang power pool[J].Zhejiang Electric Power,2004,(1):26-28(in Chinese).
|
[11] | Du L,Liu J,Lei X. The primary frequency regulation dynamic model based on power network[C].2006 International Conference on Power System Technology,2006.
|
[12] | 于达仁,郭钰锋.一次调频的随机过程分析[J].中国电机工程学报,2002,22(6):38-41.
|
[13] | Yu Daren,Guo Yufeng.Analysis on random process of the primary frequency regulation[J].Proceedings of the CSEE,2002,22(6):38-41(in Chinese).
|
[14] | 于达仁,毛志伟,徐基豫.汽轮发电机组的一次调频动态特性[J].中国电机工程学报,1996,16(4):221-225.
|
[15] | Yu Daren,Mao Zhiwei,Xu Jiyu.Dynamic characteristic of primary frequency regulation of turbo-generator[J].Proceedings of the CSEE,1996,16(4):221-225(in Chinese).
|
[16] | 倪以信.电力市场输电服务和辅助服务及其定价[J].电力系统自动化,2002,26(16):T5-T7.
|
[17] | Lei X,Lerch E,Xie C.Frequency security constrained short-term unit commitment[J]. Electric Power Systems Research,2002,60(3): 193-200.
|
[18] | 吴集光,刘俊勇,牛怀平,等.电力市场环境下最优备用容量的确定[J].电力系统自动化,2005,29(15):10-13.
|
[19] | Wu Jiguang,Liu Junyong,Niu Huaiping,et al. Determination of optimal reserve capacity in electricity market environment [J].Automation of Electric Power Systems,2005,29(15):10-13(in Chinese).
|
[20] | 杨梓俊,丁明,孙昕.电力市场下综合考虑系统可靠性和旋转备用效益的机组组合[J].电网技术,2003,27(6):13-18.
|
[21] | Yang Zijun,Ding Ming,Sun Xin.Unit commitment problem under the condition of electricity market considering system reliability and benefit from spinning reserve[J].Power System Technology,2003,27(6):13-18(in Chinese).
|
[22] | 刘长义,韩放,于继来,等.互联电网的调峰调频和联络线调整[J].电网技术,2003,27(4):36-38.
|
[23] | Liu Changyi,Han Fang,Yu Jilai,et al.Study on peak-load, frequency and tie-line power flow regulation of interconnected power system[J].Power System Technology,2003,27(4):36-38(in Chinese).
|
[24] | 于达仁,郭钰锋.电网一次调频能力的在线估计[J].中国电机工程学报,2004,24(3):72-76.
|
[25] | Yu Daren,Guo Yufeng.The online estimate of primary frequency control ability in electric power system[J].Proceedings of the CSEE,2004,24(3):72-76(in Chinese).
|
[26] | 吴集光.电力市场环境下AGC和备用辅助服务研究[D].四川大学博士学位论文,2005.
|
[27] | 田亮,曾德良,刘吉臻,等.简化的330MW机组非线性动态模型[J].中国电机工程学报,2004,24(8):180-184.
|
[28] | Tian Liang,Zeng Deliang,Liu Jizhen,et al.A simplified non-linear dynamic model of 330MW unit[J]. Proceedings of the CSEE,2004,24(8):180-184(in Chinese).
|
[29] | 曾德良,赵征,陈彦乔,等.500MW机组锅炉模型及实验分析[J].中国电机工程学报,2003,23(5):149-l52.
|
[30] | Zeng Deliang,Zhao Zheng,Chen Yanqiao,et al.A practical 500mw boiler dynamic model analysis[J].Proceedings of the CSEE,2003,23(5):149-l52(in Chinese).
|
[31] | Clarke L.Grid frequency model[R].National Grid Company Report,England,2004.
|
[32] | You H B,Zhao Y.Self-Healing in power systems:an approach using islanding and rate of frequency decline-based load shedding[J]. IEEE Trans on Power Systems,2003,18(1):174-181.
|