[1] | 李扬,王治华,卢毅,等.南京市夏季气温–日峰荷特性分析[J].电网技术,2001,25(7):63-67.
|
[2] | 谢宏,陈志业,牛东晓,等.基于小波分解与气象因素影响的电力系统日负荷预测模型研究[J].中国电机工程学报,2001,21(5):5-10.
|
[3] | Xie Hong,Chen Zhiye,Niu Dongxiao,et al.The research of daily load forecasting model based on wavelet decomposing and climatic influence[J].Proceedings of the CSEE,2001,21(5):5-10(in Chinese).
|
[4] | 朱晟,蒋传文,侯志俭.基于气象负荷因子的Elman神经网络短期负荷预测[J].电力系统及其自动化学报,2005,17(1):23-26.
|
[5] | Zhu Sheng,Jiang Chuanwen,Hou Zhijian.Application of a weather component based Elman neural network to short-term load forecasting [J].Proceeding of the CSU-EPSA,2005,17(1):23-26(in Chinese).
|
[6] | 高霞,曾新,马骋.决策树技术分析气象因子对电力负荷预测的影响[J].气象,2008,34(3):106-111.
|
[7] | Gao Xia,Zeng Xin,Ma Cheng.Influence of meteorological factors on load forecasting based on the decision tree[J].Meteorological Monthly,2008,34(3):106-111(in Chinese).
|
[8] | Taylor J,Buizza R.Neural network load forecasting with weather ensemble predictions[J].IEEE Trans on Power Systems,2002,17(3):626-632.
|
[9] | Hor Ching-Lai,Watson S J,Majithia S.Analyzing the impact of weather variables on monthly electricity demand[J].IEEE Trans on Power Systems,2005,20(4):2078-2085.
|
[10] | 金海峰,熊信银,吴耀武.基于级联神经网络的短期负荷预测方法[J].电网技术,2002,26(3):49-51.
|
[11] | Jin Haifeng,Xiong Xinyin,Wu Yaowu.A short-term load forecasting method based on cascade neural network[J].Power System Technology,2002,26(3):49-51(in Chinese).
|
[12] | 康重庆,周安石,王鹏,等.短期负荷预测中实时气象要素的影响分析及其处理策略[J].电网技术,2006,30(7):5-10.
|
[13] | Kang Chongqing,Zhou Anshi,Wang Peng,et al.Impact analysis of hourly weather factors in short-term load forecasting and its processing strategy[J].Power System Technology,2006,30(7):5-10(in Chinese).
|
[14] | 张凯,姚建刚,李伟,等.基于功率谱分解和实时气象因素的短期负荷预测[J].电网技术,2007,31(23):47-51.
|
[15] | Zhang Kai,Yao Jiangang,Li Wei,et al.Short-term load forecasting based on power spectrum decomposition and hourly weather factors [J].Power System Technology,2007,31(23):47-51(in Chinese).
|
[16] | 邓聚龙.灰色预测与决策[M].武汉:华中理工大学出版社,1986:97-148.
|
[17] | 田景文,高美娟.人工神经网络算法研究及应用[M].北京:北京理工大学出版社,2006:24-39.
|
[18] | 周佃民,管晓宏,孙婕,等.基于神经网络的电力系统短期负荷预测研究[J].电网技术,2002,26(2):10-13.
|
[19] | Zhou Dianmin,Guan Xiaohong,Sun Jie,et al.A short-term load forecasting system based on BP artificial neural network[J].Power System Technology,2002,26(2):10-13(in Chinese).
|
[20] | 马文晓,白晓民,沐连顺.基于人工神经网络和模糊推理的短期负荷预测方法[J].电网技术,2002,26(3):49-51.
|
[21] | Ma Wenxiao,Bai Xiaomin,Mu Lianshun.Short-term load forecasting using artificial neural network and fuzzy inference[J].Power System Technology,2002,26(3):49-51(in Chinese).
|
[22] | 张亚军,刘志刚,张大波.一种基于多神经网络的组合负荷预测模型[J].电网技术,2006,30(21):21-25.
|
[23] | Zhang Yajun,Liu Zhigang,Zhang Dabo.A combination load forecasting model based on multi-neural networks[J].Power System Technology,2006,30(21):21-25(in Chinese).
|
[24] | 徐军华,刘天琪.基于小波分解和人工神经网络的短期负荷预测[J].电网技术,2004,28(8):30-33.
|
[25] | Xu Junhua,Liu Tianqi.An approach to short-term load forecasting based on wavelet transform and artificial neural network[J].Power System Technology,2004,28(8):30-33(in Chinese).
|
[26] | 荣辉.基于前馈神经网络的电力系统负荷预测研究[D].北京:清华大学,1998.
|
[27] | Marquardt D.An algorithm for least squares estimation of nonlinear parameters[J].Journal of the Society for Industrial and Applied Mathematics,1963(11):431-441.
|
[28] | Lee K Y,Cha Y T,Park J H.Short-term load forecasting using an artificial neural network[J].IEEE Trans on Power Systems,1992,7(1):124-132.
|
[29] | Drezga I,Rahman S.Input variable selection for ANN-based short-term load forecasting[J].IEEE Trans on Power Systems,1998,13(4):1238-1244.
|
[30] | Matsui T,Lizaka T.Peak load forecasting using analyzable structured neural network[C].IEEE PES 2001 Winter Meeting,Columbus,Ohio USA,2001.
|
[31] | 杨奎河,王宝树,赵玲玲.神经网络短期负荷预测的输入变量选择研究[J].电子测量与仪器学报,2004,18(3):13-17.
|
[32] | Yang Kuihe,Wang Baoshu,Zhao Lingling.Study on input variables selection of short-term load forecasting based on neural network [J].Journal of Electronic Measurement and Instrument,2004,18(3):13-17(in Chinese).
|
[33] | 罗滇生,姚建刚,何洪英,等.基于自适应滚动优化的电力负荷多模型组合预测系统的研究与开发[J].中国电机工程学报,2003,23(5):58-61.
|
[34] | Luo Diansheng,Yao Jiangang,He Hongying,et al.Research and development of multi-model combining load forecasting system based on self-adaptive rolling optimization[J].Proceedings of the CSEE,2003,23(5):58-61(in Chinese).
|
[35] | 汪峰,于尔铿,阎承山,等.基于因素影响的电力系统短期负荷预测方法的研究[J].中国电机工程学报,1999,19(8):54-58.
|
[36] | Wang Feng,Yu Erkeng,Yan Chengshan,et al.Study of short-term forecasting based on influencing factors[J].Proceedings of the CSEE,1999,19(8):54-58(in Chinese).
|
[37] | Karsaz A,Mashhadi H R,Eshraghnia R.Cooperative co-evolutionary approach to electricity load and price forecasting in deregulated electricity markets[C].IEEE Power India Conference,India,2006.
|
[38] | Li Yang,Wang Zhihua,Lu Yi,et al.Characteristic analysis of summer air temperature-daily peak load in Nanjing[J].Power System Technology,2001,25(7):63-67(in Chinese).
|
[39] | 贺蓉,曾刚,姚建刚,等.天气敏感神经网络在地区电网短期负荷预测中的应用[J].电力系统自动化,2001,25(17):32-35.
|
[40] | He Rong,Zeng Gang,Yao Jiangang,et al.Application of weather sensitivity neural network model in short-term load forecasting on area[J].Automation of Electric Power Systems,2001,25(17):32-35 (in Chinese).
|
[41] | 杨正瓴,田勇,林孔元.短期负荷预测“双周期加混沌”法中的多步法与气象因子的使用[J].电网技术,2004,28(12):20-24.
|
[42] | Yang Zhengling,Tian Yong,Lin Kongyuan.Application of multi-step regression considering climate factors in method synthesizing double periods and chaotic components to short-term load forecasting [J].Power System Technology,2004,28(12):20-24(in Chinese).
|
[43] | 朱陶业,李应求,张颖,等.提高时间序列气象适应性的短期电力负荷预测算法[J].中国电机工程学报,2006,26(23):14-19.
|
[44] | Zhu Taoye,Li Yingqiu,Zhang Ying,et al.A new algorithm of advanceing weather adaptability based on Arima model for day-ahead power load forecasting[J].Proceedings of the CSEE,2006,26(23):14-19(in Chinese).
|