电网技术  2009 

基于控制性能考核标准的水火电机组实时协调控制

, PP. 63-69

Keywords: 自动发电控制(AGC),控制性能考核标准(CPS),分解协调,运行状态,校正

Full-Text   Cite this paper   Add to My Lib

Abstract:

省级电网的在线有功调度中,水、火电自动发电控制(automaticgenerationcontrol,AGC)机组和非AGC机组之间缺乏协调,使得水电AGC机组必须保留较大的备用容量,这不利于节能减排,而且会恶化电网安全运行水平。文章在计划机组和AGC机组之间新增一类协调AGC机组,用于协调S机组和Y机组。依据控制性能考核标准(controlperformancestandard,CPS),把运行状态划分为正常区、预警区和紧急区,根据运行状态划分结果来确定C机组当前的协调策略。文中的协调策略可以保证S机组尽量跟踪计划,同时为Y机组提供容量支持。仿真计算和现场实际控制效果验证了文中算法的正确性和合理性。

References

[1]  Allen J W,Bruce F W.Power generation, operation and control [M].Beijing:Tsinghua University Press,2003:156-159.
[2]  周劼英,张伯明,郭玉金,等.火电AGC机组超前控制策略[J].电网技术,2006,29(21):57-60.
[3]  Gao Zonghe,Ding Qia,Wen Bojian,et al.AGC-in-advance based on super-short-term load forecasting[J].Automation of Electric Power Systems,2000,11(10):42-44(in Chinese).
[4]  高宗和,滕贤亮,张小白.互联电网CPS标准下的自动发电控制策略[J].电力系统自动化,2005,29(19):40-44.
[5]  Gao Zonghe,Teng Xianliang,Zhang Xiaobai.Automatic generation control strategy under control performance standard for interconnected power grids[J].Automation of Electric Power Systems,2005,29(19):40-44(in Chinese).
[6]  Egido I,Fernández-Bernal F,Rouco L,et at.Modeling of thermal generating units for automatic generation control purposes[J].IEEE Trans on Control Systems Technology,2004,12(1):205-210.
[7]  韩少晓,许洪强,万芳.提高火电机组自动发电控制系统运行水平的策略[J].电网技术,2002,26(6):73-76.
[8]  Han Shaoxiao,Xu Hongqiang,Wan Fang.Strategy to improve operation level of AGC systems for thermal generation units[J].Power System Technology,2002,26(6):73-76(in Chinese).
[9]  韩学山,柳焯,陈小虎.动态优化调度研究的回顾与展望[J].电力系统自动化,1994,18(9):62-66.
[10]  Han Xueshan,Liu Zuo,Chen Xiaohu.Review and future of dynamic optimal dispatch[J].Automation of Electric Power Systems,1994,18(9):62-66(in Chinese).
[11]  周劼英,张伯明,尚金成,等.河南电网实时调度系统中若干功能与算法[J].电力系统自动化,2006,30(2):99-104.
[12]  Chau Jieying,Zhang Boming,Shang Jincheng,et al.A study on functions and algorithms in real-time active power dispatch system with application to Henan grid[J].Automation of Electric Power Systems,2006,30(2):99-104(in Chinese)
[13]  Marannino P,Granelli G P,Montagna M,et al.Different time-scale approaches to the real power dispatch of thermal units[J].IEEE Trans on Power Systems,1990,5(1):169-176.
[14]  Renaud A.Daily generation management at electricite de France: from planning towards real time[J].IEEE Trans on Automatic Control,1993,38(7):1080-1093.
[15]  柳进,潘毅,刘长义,等.攀峰过程中协调优化调度的研究[J].中国电机工程学报,2006,26(2):36-40.
[16]  Jaleeli N,VanSlyck L S,Ewart D N,et al.Understanding automatic generation control[J].IEEE Trans on Power Systems,1992,7(3):1106-1122.
[17]  Zhou Jieying,Zhang Boming,Guo Yujin,et al.Strategy of automatic generation control in advance for thermal generator[J].Power System Technology,2006,29(21):57-60(in Chinese).
[18]  高宗和,丁恰,温柏坚,等.利用超短期负荷预报实现AGC的超前控制[J].电力系统自动化,2000,11(10):42-44.
[19]  Liu Jin,Pan Yi,Liu Changyi,et al.Coordination optimal dispatching in process of climbing peak[J].Proceedings of the CSEE,2006,26(2):36-40(in Chinese).
[20]  黎辉,魏庆海,张玉良.EMS中安全约束调度在辽宁电网中的应用研究[J].东北电力技术,2002(12):28-31.
[21]  Li Hui,Wei Qinghai,Zhang Yuliang.Application of secure constrain dispatch of EMS in Liaoning grid[J].Northeastern Electric Power Technology,2002(12):28-31(in Chinese).
[22]  张伯明,吴素农,蔡斌,等.电网控制中心安全预警和决策支持系统设计[J].电力系统自动化,2006,30(6):1-5.
[23]  Zhang Boming,Wu Sunong,Cai Bin,et al.Design of an early warning and security countermeasure system for electric power control centers[J].Automation of Electric Power Systems,2006,30(6):1-5(in Chinese).