汤效军.电力线载波通信技术的发展及特点[J].电力系统通信,2003,24(1):47-51. Tang Xiaojun.The development and characteristics of power line carrier techniques[J].Telecommunications for Electric Power System,2003,24(1):47-51(in Chinese).
[2]
刘晓胜,周岩,戚佳金.电力线载波通信的自动路由方法研究[J].中国电机工程学报,2006,26(21):76-81. Liu Xiaosheng,Zhou Yan,Qi Jiajin.Method study of automatic routing for power line communication[J].Proceedings of the CSEE,2006,26(21):76-81(in Chinese).
[3]
Cavdar H I.A solution to remote detection of illegal electricity usage via power line communications[J].IEEE Trans on Power Delivery,2004,19(4):1663-1667.
[4]
Chen X,Hong G S.A simulation study of the predictive p-persistent CSMA protocol[C].Proceedings of 35th Annual Simulation Symposium,2002.
[5]
赵宇明,郭静波,王赞基,等.多导体电力电缆载波通信中的频谱优化方法[J].中国电机工程学报,2007,27(13):41-47. Zhao Yuming,GuoJingbo,Wang Zanji,et al.Spectrum optimization of multi-conductor power cable for the power-line communications [J].Proceedings of the CSEE,2007,27(13):41-47(in Chinese).
[6]
Buchholz P,Plonnigs J.Analytical analysis of access-schemes of the CSMA type[C].Proceedings of IEEE International Workshop on Factory Communication Systems,2004.
[7]
桥昕,钱松荣.基于移动自组网络的可靠组播协议研究[J].计算机工程,2003,29(14):133-135. Qiao Xin,Qian Songrong.Comparison of reliable multicast in mobile ad hoc network[J].Computer Engineering,2003,29(14):133-135(in Chinese).
[8]
袁培燕,庄新豪,赵慧娜.移动Ad Hoc网络AODV路由协议的研究发展[J].许昌学院学报,2007,26(2):91-94. Yuan Peiyan,Zhuang Xinhao,Zhao Huina.A survey of AODV routing protocols for mobile ad hoc network[J].Journal of Xuchang University,2007,26(2):91-94(in Chinese).
[9]
毛秀伟,吴铁军.自适应p-持续CSMA/CD介质访问控制策略[J].通信学报,2003,24(8):161-167. Mao Xiuwei,Wu Tiejun.An adaptive algorithm for p-persistent CSMA/CD policy[J].Journal of Communications,2003,24(8):161-167(in Chinese).
[10]
李士勇.蚁群算法及其应用[M].哈尔滨:哈尔滨工业大学出版社,2004:6-8.
[11]
孙云莲,罗卫华,李洪.基于EMD的ICA方法在电力载波通信信号提取中的应用[J].中国电机工程学报,2007,27(16):109-113. SunYunlian,Luo Weihua,Li Hong.Extract signals of power line communication by a novel method based on EMD and ICA[J]. Proceedings of the CSEE,2007,27(16):109-113(in Chinese).
[12]
赵军,张世璐,邓亚平.LONWORKS控制网络中的可预测p-CSMA协议[J].重庆邮电学院学报,2001,13(1):72-74. Zhao Jun,Zhang Shilu,Deng Yaping.Predictability of p-CSMA protocol in LONWORKS control network[J].Journal of Chongqing University of Posts and Telecommunications,2001,13(1):72-74(in Chinese).
[13]
陈烨,赵国波,刘俊勇,等.用于机组组合优化的蚁群粒子群混合算法[J].电网技术,2008,32(6):52-56. ChenYe,Zhao Guobo,Liu Junyong.An ant colony optimization and particle swarm optimization hybrid algorithm for unit commitment based on operated coding[J].Power System Technology,2008,32(6):52-56(in Chinese).
孙晓艳,李建东,张光辉,等.Ad Hoc中的常用路由算法分析[J].现代电子技术,2003,13:18-21. Sun Xiaoyan,Li Jiandong,Zhang Guanghui.Analysis of the several routing algorithms in Ad Hoc[J].Modern Electronic Technique,2003(13):18-21(in Chinese).
[16]
赵健,孙俊锁.基于NS2的Ad Hoc网络路由协议仿真与研究[J].鞍山科技大学学报,2007,30(2):160-163. Zhao Jian,Sun Junsuo.The simulation analysis and research of cluster routing protocol based on NS2 in ad hocnetworks[J].Journal of Anshan University of Science and Technology,2007,30(2):160-163(in Chinese).
[17]
俞天白,杨将新,赵玉玺.楼宇控制系统中的电力线载波通信路由算法[J].电网技术,2006,30(9):88 -91. Yu Tianbai,Yang Jiangxin,Zhao Yuxi.A routing algorithm of edifice control system based on power line signal carrier[J].Power System Technology,2006,30(9):88-91(in Chinese).
[18]
吕文红,郭银景,公茂法,等.电力线载波自动抄表系统[J].电力系统通信,2000,21(5):20-23. Lü Wenhong,Guo Yinjing,Gong Maofa,et al.An automatic meter reader system via power line carrier[J].Telecommunications for Electric Power System,2000,21(5):20-23(in Chinese).