[1] | Bertling L.Reliability Centered maintenance for electric power distribution system[M].Stockholm:KTH,2002.
|
[2] | 朱旭凯,刘文颖,杨以涵.综合考虑可靠性因素的电网规划新方法[J].电网技术,2004,28(21):51-54.
|
[3] | Zhu Xukai,Liu Wenying,Yang Yihan.A new power network planning method by comprehensively considering system reliability factors [J].Power System Technology,2004,28(21):51-54(in Chinese).
|
[4] | Hilber P.Maintenance optimization for power distribution systems [D].Sweden:Royal Institute Technology Stockholm,2008.
|
[5] | 黄弦超,舒隽,张粒子,等.免疫禁忌混合智能优化算法在配电网检修优化中的应用[J].中国电机工程学报,2004,24(11):96-100.
|
[6] | Huang Xianchao,Shu Jun,Zhang Lizi,et al.Distribution maintenance scheduling using an intelligent optimal approach mixed with immune algorithm and Tabu search[J].Proceedings of the CSEE,2004,24(11):96-100(in Chinese).
|
[7] | 陈竟成,于而铿.检修计划新模型与算法的研究[J].电网技术,1997,21(11):66-69.
|
[8] | Chen Jingcheng,Yu Erkeng.Research of a new optimization module and algorithm for maintenance scheduling problem[J].Power System Technology,1997,21(11):66-69(in Chinese).
|
[9] | 刘永梅,盛万兴.基于网络拓扑和遗传算法的配电设备检修计划优化模型[J].电网技术,2007,31(21):11-15.
|
[10] | Liu Yongmei,Sheng Wanxing.Optimization model for distribution equipment maintenance scheduling based on network topology and genetic algorithm[J].Power System Technology,2007,31(21):11-15(in Chinese).
|
[11] | 丁明,冯永青.发输电设备联合检修安排模型及算法研究[J].中国电机工程学报,2004,24(5):18-23.
|
[12] | Ding Ming,Feng Yongqing.Research on the modeling and algorithm to global generator and transmission scheduling[J].Proceedings of the CSEE,2004,24(5):18-23(in Chinese).
|
[13] | 冯永青,吴文传,张伯明,等.基于可信性理论的输电网短期线路检修计划[J].中国电机工程学报,2007,27(4):65-71.
|
[14] | Feng Yongqing,Wu Wenchuan,Zhang Boming,et al.Short-term transmission line maintenance scheduling based on credibility theory [J].Proceedings of the CSEE,2007,27(4):65-71(in Chinese).
|
[15] | 院晓涛,姚建刚,陈亮.基于改进蚁群算法的发电机组检修计划优化[J].电网技术,2008,32(21):42-46.
|
[16] | Yuan Xiaotiao,Yao Jiangang,Chen Liang.Solving unit maintenance scheduling problem by use of improved ant colony algorithm [J].Power System Technology,2008,32(21):42-46(in Chinese).
|
[17] | Momoh J A,Guo S X,Ogbuobiri E C,et al.The quadratic interior point method solving power system optimization problems[J].IEEE Trans on Power Systems,1994,9(3):1327-1336.
|
[18] | 张焰.电网规划中的模糊可靠性评估方法[J].中国电机工程学报,2000,20(11):77-80.
|
[19] | Zhang Yan.The evaluation method of fuzzy reliability in electric power network planning[J].Proceeding of the CSEE,2000,20(11):77-80(in Chinese).
|
[20] | Billinton R,Allan R N.Reliability evaluation of power systems [M].2 edition.New York:Plenum Publishing Corporation,1994.
|
[21] | Wang W,Loman J,Vassiliou P.Reliability importance of components in a complex System[C].Proceedings of Reliability and Maintainability Symposium,2004.
|
[22] | Laursen P S.Simple approaches to parallel branch and bound [J].Parallel Computing,1993,19:143-152.
|
[23] | Gendron B,Cranic T G.Parallel branch and bound algorithms: Survey and synthesis[J].Operations Research,1994,42(6):1042- 1066.
|
[24] | Mehrotra S.On the implementation of a primal-dual interior point method[J].SIAMJ. Optim.,1992,2:696-725.
|