[1] | 高翔,庄侃沁,孙勇.西欧电网“11.4”大停电事故的启示[J].电网技术,2007,31(1):25-31.
|
[2] | Gao Xiang,Zhuang Kanqin,Sun Yong.Lessons and enlightenment from blackout occurred in UCTE Grid on November 4,2006 [J].Power System Technology,2007,31(1):25-31 (in Chinese).
|
[3] | Li Chunyan,Sun Yuanzhang,Chen Xiangyi,et al.Preliminary analysis of large scale blackout in western Europe power grid on November 4 and measures to prevent large scale blackout in China [J].Power System Technology,2006,30(24):16-21(in Chinese).
|
[4] | 葛睿,董昱,吕跃春.欧洲“11.4”大停电事故分析及对我国电网运行工作的启示[J].电网技术,2007,31(3):1-6.
|
[5] | Ge Rui,Dong Yu,Lü Yuechun.Analysis of large-scale blackout in UCTE power grid and lessons to be drawn to power grid operation in China[J].Power System Technology,2007,31(3):1-6 (in Chinese).
|
[6] | 成海彦,黄定成,郑广辉,等.TBC方式下河北南部电网的AGC控制策略分析[J].电网技术,2005,29(18):53-55.
|
[7] | Cheng Haiyan,Huang Dingcheng,Zheng Guanghui,et al.Analysis on control strategy of AGC in Southern Heibei power grid under tie-line load and frequency bias control mode[J].Power System Technology,2005,29(18):53-55(in Chinese).
|
[8] | 郭勇,朱长胜.TBC方式下改善蒙西电网AGC控制性能的方法[J].电网技术,2005,29(18):42-45.
|
[9] | Guo Yong,Zhu Changsheng.Method of improving the AGC’s performance under the TBC’s mode about inner Mongolia west power network[J].Power System Technology,2005,29(18):42-45(in Chinese).
|
[10] | 汪德星.电力系统运行中AGC调节需求的分析[J].电力系统自动化,2004,28(8):6-9.
|
[11] | Wang Dexing.Analysis of AGC demand of power system operation [J].Automation of Electric Power Systems,2004,28(8):6-9(in Chinese).
|
[12] | 李端超,江山立,陈家庚,等.AGC机组调节效能定量评估与补偿方式研究[J].电网技术,2001,25(8):15-19.
|
[13] | Li Duanchao,Jiang Shanli,Chen Jiageng,et al.Quantitative evaluation of regulation efficiency of generating sets with AGC and study on the condensation modes[J].Power System Technology,2001,25(8):15-19(in Chinese).
|
[14] | 唐跃中,张王俊,张健.基于CPS的AGC控制策略研究[J].电网技术,2004,28(21):75-79.
|
[15] | Tang Yuezhong,Zhang Wangjun,Zhang Jian.Research on control performance standard based control strategy for AGC[J].Power System Technology,2004,28(21):75-79(in Chinese).
|
[16] | 任广宇.CPS标准下动态调整频率偏差系数的自动发电控制[D].武汉:华中科技大学,2006.
|
[17] | VanSlyck L S,Jaleeli N,Kelly W R.Implication of frequency control bias settings on interconnected system operation and inadvertent energy accounting[J].IEEE Trans on Power Systems,1989(4):712-723.
|
[18] | 唐跃中.AGC按联络线偏差控制时频率偏差系数的确定[J].电网技术,1997,21(6):5-7.
|
[19] | Tang Yuezhong.Principles of getting a rational area frequency bias in AGC of tie-line bias control model[J].Power System Technology,1997,21(6):5-7(in Chinese).
|
[20] | Kennedy T,Hoyt S M,Abell C F.Variable,nonlinear tie-line frequency bias for interconnected system control[J].IEEE Trans on
|
[21] | Power Systems,1988(3):1244-1253.
|
[22] | 贾燕冰,高翔,余颖辉,等.动态系数法在华东电网中的应用探讨[J].华东电力,2007,35(6):6-10.
|
[23] | Jia Yanbing,Gao Xiang,Yu Yinghui,et al.Application of dynamic coefficient method to East China Power Grid[J].East China Electric Power,2007,35(6):6-10(in Chinese).
|
[24] | 宋兆星,骆意,李国胜.发电机组类型对AGC运行性能的影响及对策[J].电网技术,2005,29(18):17-21.
|
[25] | Song Zhaoxing,Luo Yi,Li Guosheng.The influence and countermeasure of generating unit’s type on AGC operation performance[J].Power System Technology,2005,29(18):17-21(in Chinese).
|
[26] | Delfino B,Fornari F.Evaluating different load frequency control schemes for restructured power systems[C].Session-2000,CIGRE.
|
[27] | 汪德星.华东电网实行CPS标准的探索[J].电力系统自动化,2000,24(8):41-44.
|
[28] | Wang Dexing.Study of CPS standards in East China Power Grid [J].Automation of Electric Power Systems,2000,24(8):41-44(in Chinese).
|
[29] | 李春艳,孙元章,陈向宜,等.西欧“11.4”大停电事故的初步分析及防止我国大面积停电事故的措施[J].电网技术,2006,30(24):16-21.
|