[1] | Singh D,Pandey J P,Chauhan D S.Topology identification,bad data processing,and state estimation using fuzzy pattern matching [J].IEEE Trans on Power Systems,2005,20(3):1570-1579.
|
[2] | 孙国强,卫志农,周封伟.改进迭代自组织数据分析法的不良数据辨识[J].中国电机工程学报,2006,26(11):162-165.
|
[3] | Sun Guoqiang,Wei Zhinong,Zhou Fengwei.The application of ISODATA to bad data detection and identification based on genetic algorithms[J].Proceedings of the CSEE,2006,26(11):162-165(in Chinese).
|
[4] | 王超学,崔杜武,崔颖安,等.使用基于中医思想的蚁群算法求解配电网重构[J].中国电机工程学报,2008,28(7):13-18.
|
[5] | Wang Chaoxue,Cui Duwu,Cui Ying’an,et al.Distribution network reconfiguration using a novel ant colony system based on traditional chinese medicine theory[J].Proceedings of the CSEE,2008,28(7): 13-18(in Chinese).
|
[6] | Colorni A,Dorigo M,Maniezzo V.An investigation of some properties of an “Ant algorithm”[C]//Proceedings of the Parallel Problem Solving from Nature Conference(PPSN 92).Brussels,Belgium:IEEE,1992:509-520.
|
[7] | Colorni A,Dorigo M,Maniezzo V,et al.Ant system for job-shop scheduling[J].Belgian Journal of Operations Research Statistics and Computer Science,1994,34(1):39-53.
|
[8] | Ren Jiangbo,Yu Erkeng,Guo Zhizhong,et al.Sequential tracking state estimation based on sensitivity analysis[J].Power System Technology.2007,31(7):64-68(in Chinese).
|
[9] | Thomas Stützle,Holger H.MAX-MIN ant system[J].Future Generation Computer Systems,2000,16(9):889-914.
|
[10] | 李振坤,陈星莺,余昆,等.配电网重构的混合粒子群算法[J].中国电机工程学报,2008,28(31):35-41.
|
[11] | Li Zhenkun,Chen Xingying,Yu Kun,et al.Hybrid particle swarm optimization for distribution network reconfiguration[J].Proceedings of the CSEE,2008,28(31):35-41(in Chinese).
|
[12] | Lu Zhigang,Li Shuang.Theoretical network loss calculation of whole power system under incomplete injected measured data of partial plants and substations[J].Power System Technology,2007,31(16):83-87(in Chinese).
|
[13] | 李碧君,薛禹胜,顾锡汶.抗差估计理论及其在电力系统中的应用[J].电力系统自动化,1999,23(1):57-61.
|
[14] | Li Bijun,Xue Yusheng,Gu Xiwen.Robust estimation theory and its application in power system[J].Automation of Electric Power Systems,1999,23(1):57-61(in Chinese).
|
[15] | 李碧君,薛禹胜,顾锡汶,等.基于权函数的电力系统状态估计算法[J].电力系统自动化,1999,23(8):32-34.
|
[16] | Li Bijun,Xue Yusheng,Gu Xiwen,et al.Weight function based power system state estimation algorithm[J].Automation of Electric Power Systems,1999,23(8):32-34(in Chinese).
|
[17] | 郭伟,单渊达.M估计方法及其在电力系统状态估计中的应用[J].中国电机工程学报,2000,20(9):26-31.
|
[18] | Guo Wei,Shan Yuanda.M-estimation and its applicaion in power system state estimation[J].Proceedings of the CSEE,2000,26(11): 26-31(in Chinese).
|
[19] | 卢志刚,张宗伟.基于量测量替换与标准化残差检测的不良数据辨识[J].电力系统自动化,2007,31(13):52-56.
|
[20] | Lu Zhigang,Zhang Zongwei.Bad Data Identification based on measurement replace and standard residual detection[J].Automation of Electric Power Systems,2007,31(13):52-56(in Chinese).
|
[21] | 孙雅明,王晨力,张智晟,等.基于蚁群优化算法的电力系统负荷序列的聚类分析[J].中国电机工程学报,2005,25(18):40-45.
|
[22] | Sun Yaming,Wang Chenli,Zhang Zhisheng,et al.Clustering analysis of power system load series based on ant colony optimization algorithm[J].Proceedings of the CSEE,2005,25(18):40-45(in Chinese).
|
[23] | 翟海保,程浩忠,吕干云,等.基于模式记忆并行蚁群算法的输电网规划[J].中国电机工程学报,2005,25(9):17-22.
|
[24] | Zhai Haibao,Cheng Haozhong,Lü Ganyun,et al.Transmission network planning based on schema recording parallel ant colony algorithm[J].Proceedings of the CSEE,2005,25(9):17-22(in Chinese).
|
[25] | 于尔铿.电力系统状态估计[J].北京:水利电力出版社,1985:62-63.
|
[26] | 任江波,于尔铿,郭志忠,等.基于灵敏度分析的逐次追踪状态估计[J].电网技术,2007,31(7):64-68.
|
[27] | 郭瑞鹏,邵学俭,韩祯祥.基于分块吉文斯旋转的电力系统状态估计[J].中国电机工程学报,2006,26(12):26-31.
|
[28] | Guo Ruipeng,Shao Xuejian,Han Zhenxiang.A blocked givens rotations based algorithm for power system state estimation [J].Proceedings of the CSEE,2006,26(12):26-31(in Chinese).
|
[29] | 卢志刚,李爽.部分厂站量测信息不完整时全网理论线损计算[J].电网技术,2007,31(16):83-87.
|