[1] | 王锡凡.电力系统优化规划[M].北京:水利电力出版社,1990:1-10.
|
[2] | 丘昌涛,岳占明,李朝华.用等风险度法制定发电机组检修计划的计算机程序[J].东北电力学院学报,1983(1):83-93.
|
[3] | Feng Changyou,Wang Xifan,Bie Zhaohong,et al.A generator maintenance scheduling model considering unexpected unit failures [J].Automation of Electric Power Systems,2009,33(13):32-36(in Chinese).
|
[4] | 冯长有,王锡凡,王秀丽,等.考虑市场风险的发电商机组检修随机规划模型[J].中国电机工程学报,2009,29(28):95-101.
|
[5] | Feng Changyou,Wang Xifan,Wang Xiuli,et al.Stochastic unit maintenance scheduling model for a power producer considering risk in power market[J].Proceedings of the CSEE,2009,29(28):95-101(in Chinese).
|
[6] | 廖胜利,程春田,李刚,等.机组检修优化的最小缺电量模型[J].电网技术,2010,34(10):38-42.
|
[7] | 于大洋,韩学山,赵建国.发输电协调检修计划的主从规划模型与分区搜索算法[J].电网技术,2010,34(4):88-93.
|
[8] | Yu Dayang,Han Xueshan,Zhao Jianguo.A bilevel programming model and partition searching algorithm for integrated maintenance scheduling[J].Power System Technology,2010,34(4):88-93(in Chinese).
|
[9] | 丁明,冯永青.发电机组检修计划的可靠性和经济性研究[J].中国电力,2001,34(7):22-25.
|
[10] | Ding Ming,Feng Yongqing.Review of reliability and economy problems in generator maintenance scheduling[J].Electric Power,2001,34(7):22-25(in Chinese).
|
[11] | Kendall M,Stuart A.The advanced theory of statistics[M].London:Charles Griffin,1977:1-10.
|
[12] | Tian W D,Sutanto D,Lee Y B,et al.Cumulant based probabilistic power system simulation using Laguerre polynomials[J].IEEE Transactions on Energy Conversion,1989,4(4):567-574.
|
[13] | Stremel J P,Jenkins R T.Maintenance scheduling under uncertainty [J].IEEE Trans on Power Apparatus and Systems,1981,100(2):460-465.
|
[14] | Booth R R.Power system simulation model based on probability analysis[J].IEEE Trans on Power Apparatus and Systems,1972,91(1):62-69.
|
[15] | Rau N S,Toy P,Schenk K F.Expected energy production costs by the method of moments[J].IEEE Trans on Power Apparatus and Systems,1980,99(5):1908-1917.
|
[16] | 陈刚.一种制订孤立系统和辐射形互联系统机组检修计划的新方法[J].中国电机工程学报,1989,9(3):34-40.
|
[17] | Chen Gang.A new method of generating unit maintenance scheduling for isolated and radically interconnected systems[J].Proceedings of the CSEE,1989,9(3):34-40(in Chinese).
|
[18] | 苏慧玲,王淳,秦茹静,等.基于GA改进算法的多目标机组优化检修计划[J].电力系统及其自动化学报,2008,20(6):27-30.
|
[19] | Su Huiling,Wang Chun,Qin Rujing,et al.Multi-objective optimization of unit maintenance scheduling based on improved GA[J].Proceedings of the CSU-EPSA,2008,20(6):27-30(in Chinese).
|
[20] | 李川,姚建刚,张红旭.机组检修计划的改进多蚁群伪并行寻优算法[J].电力系统及其自动化学报,2009,21(4):120-124.
|
[21] | Li Chuan,Yao Jiangang,Zhang Hongxu.Improved multi-ant colony virtual parallel optimization algorithm of generator maintenance schedule[J].Proceedings of the CSU-EPSA,2009,21(4):120-124(in Chinese).
|
[22] | 冯长有,王锡凡,别朝红,等.考虑机组故障的系统机组检修计划模型[J].电力系统自动化,2009,33(13):32-36.
|
[23] | Liao Shengli,Cheng Chuntian,Li Gang,et al.A minimum power deficiency model for optimization of unit maintenance scheduling[J].Power System Technology,2010,34(10):38-42 (in Chinese).
|
[24] | 院晓涛,姚建刚,陈亮基.基于改进蚁群算法的发电机组检修计划优化[J].电网技术,2008,32(21):42-46.
|
[25] | Yuan Xiaotao,Yao Jiangang,Chen Liangji.Solving unit maintenance scheduling problem by use of improved ant colony algorithm[J].Power System Technology,2008,32(21):42-46(in Chinese).
|
[26] | Subcommittee P M.IEEE reliability test system[J].IEEE Trans on Power Apparatus and Systems,1979,98(6):2047-2054.
|