[1] | 刘敏,吴复立.电力市场环境下发电商电能分配策略研究[J].中国电机工程学报,2008,28(25):111-117.
|
[2] | Liu Min,Wu Fuli.Trading strategy of generation companies in electricity Market[J].Proceedings of the CSEE,2008,28(25):111-117(in Chinese).
|
[3] | 喻洁,李扬,夏安邦.兼顾环境保护与经济效益的发电调度分布式优化策略[J].中国电机工程学报,2009,29(16):63-68.
|
[4] | Yu Jie,Li Yang,Xia Anbang.Distributed optimization of generation dispatch schedule considering environmental protection and economic profits[J].Proceedings of the CSEE,2009,29(16):63-68(in Chinese).
|
[5] | 周纬,彭昱,孙辉,等.含风电场的电力系统动态经济调度[J].中国电机工程学报,2009,29(25):13-18.
|
[6] | Zhou Wei,Peng Yu,Sun Hui,et al.Dynamic economic dispatch in wind power integrated system[J].Proceedings of the CSEE,2009,29(25):13-18(in Chinese).
|
[7] | 孙元章,吴俊,李国杰,等.基于风速预测和随机规划的含风电场电力系统动态经济调度[J].中国电机工程学报,2009,29(4):41-47.
|
[8] | Sun Yuanzhang,Wu Jun,Li Guojie,et al.Dynamic economic dispatch considering wind power penetration based on wind speed forecasting and stochastic programming[J].Proceedings of the CSEE,2009,29(4):41-47(in Chinese).
|
[9] | 黎静华,韦化.求解机组组合问题的领域搜索法[J].中国电机工程学报,2008,28(13):33-40.
|
[10] | Li JingHua,Wei Hua.Unit commitment via local search point method [J].Proceedings of the CSEE,2008,28(13):33-40(in Chinese).
|
[11] | 韦化,吴阿琴,白晓清.一种求解机组组合问题的内点半定规划方法[J].中国电机工程学报,2008,28(1):35-40.
|
[12] | Wei Hua,Wu Aqin,Bai Xiaoqing.An interior point semi definite programming for unit commitment problems[J].Proceedings of the CSEE,2008,28(1):35-40(in Chinese).
|
[13] | 黎静华,韦化.基于模式搜索算法的电力系统机组组合问题[J].电工技术学报,2009,24(6):123-128.
|
[14] | Li Jinghua,Wei hua.A general pattern search algorithm for electric power system unit commitment problems[J].Transactions of China Electrotechnical Society,2009,24(6):123-128(in Chinese).
|
[15] | 黎静华,韦化.适合于机组组合问题的贪婪随机自适应搜索模型[J].电网技术,2010,34(4):119-123.
|
[16] | Li Jinghua,Wei Hua.A greedy randomized adaptive searching model for unit commitment problems[J].Proceedings of the CSEE,2010,34(4):119-123(in Chinese).
|
[17] | 杨俊杰,周建中,喻菁,等.一种求解大规模机组组合问题的混合智能遗传算法[J].电网技术,2004,28(19):47-50.
|
[18] | Yang Junjie,Zhou Jianzhong,Yu Jing,et al.A hybrid intelligent genetic algorithm for large-scale unit commitment[J].Power System Technology,2004,28(19):47-50(in Chinese).
|
[19] | 杨朋朋,韩学山.基于改进拉格朗日乘子修正方法的逆序排序机组组合[J].电网技术,2006,30(9):40-45.
|
[20] | Yang Pengpeng,Han Xueshan.Unit decommitment based on improved lagrangian multiplier modification method[J].Power System Technology,2006,30(9):40-45(in Chinese).
|
[21] | 汪新星,张明.基于改进微粒群算法的水火电力系统短期发电计划优化[J].电网技术,2004,28(12):16-19.
|
[22] | Wang Xinxing,Zhang Ming.Short-tern scheduling optimization of hydro-thermal power systems based on refined particle swarm algorithm[J].Power System Technology,2004,28(12):16-19(in Chinese).
|
[23] | 孙闻,房大中.考虑系统可靠性和经济性的机组组合方法[J].电网技术,2008,32(6):47-51.
|
[24] | 王喆,余贻鑫,张弘鹏.社会演化算法在机组组合中的应用[J].中国电机工程学报,2004,24(4):12-17.
|
[25] | Wang Zhe,Yu Yixin,Zhang Hongpeng.Social evolutionary programming based unit commitment[J].Proceedings of the CSEE,2004,24(4):12-17(in Chinese).
|
[26] | 余廷芳,林中达.部分解约束算法在机组组合负荷优化组合中的应用[J].中国电机工程学报,2009,29(2):107-112.
|
[27] | Yu Tingfang,Liu Zhongda.Application of float genetic algorithms-partially solved combined with punishing function in power plant units commitment problem[J].Proceedings of the CSEE,2009,29(2):107-112(in Chinese).
|
[28] | 郭三刚,管晓宏,翟桥柱.具有爬升约束机组组合的充分必要条件[J].中国电机工程学报,2005,25(24):14-19.
|
[29] | Guo Sangang,Guan Xiaohong,Zhai Qiaozhu.A new necessary and sufficient condition for checking feasibility of a solution to unit commitment problems with ramp rate constraints[J].Proceedings of the CSEE,2005,25(24):14-19(in Chinese).
|
[30] | 李学斌.火电厂厂级负荷分配的多目标优化和决策研究[J].中国电机工程学报,2008,28(35):102-107.
|
[31] | Li Xuebin.Study of multi-objective optimization an multi-attribute decision making of economic load dispatch problem[J].Proceedings of the CSEE,2008,28(35):102-107(in Chinese).
|
[32] | 路志英,葛少云,王成山.基于粒子群优化的加权伏罗诺伊图变电站规划[J].中国电机工程学报,2009,29(16):35-41.
|
[33] | Lu Zhiying,Ge Shaoyun,Wang Chengshan.Substation location planning of the weighted voronoi diagram based on particle swarm optimization algorithm[J].Proceedings of the CSEE,2009,29(16):35-41(in Chinese).
|
[34] | McArthur S D J,Davidson E M,Catterson V M,et al.Multi-agent systems for power engineering applications—part II:technologies,standards,and tools for building multi-agent systems[J].IEEE Trans on Power Systems,2007,22(4):1753-1759.
|
[35] | Zhao B,Guo C X,Cao Y J.A multi-agent-based particle swarm optimization approach for optimal reactive power dispatch[J].IEEE Trans on Power Systems,2005,20(2):1070-1078.
|
[36] | Nordman M M,Lehtonen M.Distributed agent-based state estimation for electrical distribution networks[J].IEEE Trans on Power Systems,2005,20(2):652-658.
|
[37] | Sun Wen,Fang Dazhong.Unit commitment considering system reliablility and economy[J].Power System Technology,2008,32(6):47-51(in Chinese).
|
[38] | 胡家声,郭创新,曹一家.一种适合于电力系统机组组合问题的混合粒子群优化算法[J].中国电机工程学报,2004,24(4):24-28.
|
[39] | Hu Jiasheng,Guo Chuangxin,Cao Yijia.A hybrid particle swarm optimization method for unit commitment problem[J].Proceedings of the CSEE,2004,24(4):24-28(in Chinese).
|
[40] | 孙力勇,张焰,蒋传文.基于矩阵实数编码遗传算法求解大规模机组组合问题[J].中国电机工程学报,2006,26(2):82-87.
|
[41] | Sun Liyong,Zhang Yan,Jiang Chuanwen.A solution to the unit commitment problem based on matrix real-coded genetic algorithm [J].Proceedings of the CSEE,2006,26(2):82-87(in Chinese).
|
[42] | Dimeas A L,Hatziargyriou N D.Operation of a multi-agent system for microgrid control[J].IEEE Trans on Power Systems,2006,20(3):1447-1455.
|
[43] | 黎静华,韦化,夏小琴.智能电网下节能发电调度多Agent系统的研究[J].电力系统保护与控制,2010,38(21):96-103.
|
[44] | Li Jinghua,Wei Hua,Xia Xiaoqin.Multi-Agent model and method for units commitment in energy-saving generation dispatching[J].Power System Protection and Control,2010,38(21):96-103(in Chinese).
|