Zhu Yiying,Jiang Weiping,Yin Yonghua.General situation of power system hybrid simulation center[J].Power System Technology,2008,32(22):1-5(in Chinese).
Nan Jiang,Gao Chao,Zheng Borui.Eficiency of parallel computing of Altix 450 in 3D steady-state N-S viscous flow numerical simulation[J].Aeronautical Computing Technique,2010,40(2):46-48(in Chinese).
Gao Yuan,Chen Yunping,Liu Huijin.Joint physico digital real-time simulation of power system[J].Power System Technology,2005,29(12):77-80(in Chinese).
[12]
Saini S,Jespersen D C,Talcott D,et al.Performance comparison of SGI Altix 4700 and SGI Altix 3700 Bx2 parallel and distributed processing[C]//IEEE International Symposium on 2008.Miami:IEEE,2008:1-8.
[13]
Saini S,Talcott D,Jespersen D,et al.Scientific application-based performance comparison of SGI Altix 4700,IBM POWER5+ and SGI ICE 8200 supercomputers[C]//Proceedings of the 2008 ACM/IEEE Conference on Supercomputing.Texas:IEEE,2008:1-12.
Hu Tao,Yin Yonghua,Jiang Weiping,et a1.Digital/analog hybrid real-time simulation system and its application in study on ultra-high voltage AC/DC power grid[J].Power System Technology,2008,32(17):1-5(in Chinese).
Hu Tao,Zhu Yiying,Zhang Xing,et a1.Power connection technology for full-digital real-time simulator and analogue simulator[J].Power System Technology,2010,34(1):51-55(in Chinese).
Yang Jingping,Xu Zheng.Application of dynamic equivalence based on identification of coherent generator group in engineering[J].Power System Technology,2005,29(17):67-7l(in Chinese).
[20]
Sybille G,Giroux P.Simulation of FACTS controllers using the Matlab power system blockset and hHypersim real-time simulator[C]//Proceedings of 2002 Power Engineering Society Winter Meeting.New York:IEEE,2002:488-491.
[21]
Larose C,Guerette S,Guay F.A fully digital real-time power system simulator based on PC-cluster[J].Mathematics and Computers in Simulation,2003,63(5):151-159.