[1] | 浙江大学发电教研组直流输电科研组.直流输电[M].北京:电力工业出版社,1982:6-17.
|
[2] | 戴熙杰.直流输电基础[M].北京:水利电力出版社,1990:1-12.
|
[3] | 赵畹君.高压直流输电技术[M].北京:中国电力出版社,2004:1-25.
|
[4] | 韩民晓,文俊,徐永海.高压直流输电原理与运行[M].北京:机械工业出版社,2008:7-18.
|
[5] | 朱韬析,王超.天广直流输电系统的基本控制策略[J].电网技术,2007,31(27):22-26.
|
[6] | Zhu Taoxi,Wang Chao.Basic control technique for HVDC transmission system from Tianshengqiao to Guangzhou[J].Power System Technology,2007,31(27):22-26(in Chinese).
|
[7] | 丁钊,韩伟强.天广直流输电系统双极运行情况总结[J].电网技术,2003,27(9):49-54.
|
[8] | 曹鸿,李书勇.天广直流输电工程两起极闭锁故障的原因分析及其反措[J].电力系统保护与控制,2008,36(24),93-96.
|
[9] | Cao Hong,Li Shuyong.The investigation of two times pole-blocked and its countermeasure in Tian-Guang HVDC transmission project[J].Power System Protection and Control,2008,36(24),93-96(in Chinese).
|
[10] | 韩民晓,丁辉,陈修宇,等.高压直流输电系统电磁暂态建模[J].电力系统及其自动化学报,2008,20(4),7-11.
|
[11] | Han Minxiao,Ding Hui,Chen Xiuyu,et al.Electromagnetic transient modeling of HVDC system[J].Proceedings of the CSU-EPSA,2008,20(4):7-11(in Chinese).
|
[12] | 聂定珍,郑劲.灵宝换流站交流暂态过电压研究[J].高电压技术,2005,31(4):54-56.
|
[13] | Nie Dingzhen,Zheng Jin.AC transient overvoltage of HVDC converter station[J].High voltage Engineering,2005,31(4):54-56(in Chinese).
|
[14] | 聂定珍,郑劲.灵宝换流站直流暂态过电压研究[J].高电压技术,2004,30(11):50-51.
|
[15] | Nie Dingzhen,Zheng Jin.DC transient overvoltage of Lingbao BtB HVDC converter station[J].High voltage Engineering,2004,30(11):50-51(in Chinese).
|
[16] | SIEMENS.Insulation Coordination Study Report,Part 1:Tian-Guang HVDC Transmission Project[R].Erlangen:SIEMENS,1997.
|
[17] | SIEMENS.Main Data Study Report,Tian-Guang HVDC Transmission Project[R].Erlangen:SIEMENS,1997.
|
[18] | Ding Zhao,Han Weiqiang.Summary of bipolar operation situation of Tian-Guang DC power transmission system[J].Power System Technology,2003,27(9):49-54(in Chinese).
|
[19] | 荆勇,任震,杨晋柏,等.天广直流输电系统运行过电压的研究[J].高电压技术,2002,28(4):1-3.
|
[20] | Jing Yong,Ren Zhen,Yang Jinbo,et al.Study on overvoltage of Tian-Guang HVDC transmission[J].High voltage Engineering,2002,28(4):1-3(in Chinese).
|
[21] | 任达勇.天广直流工程历年双极闭锁事故分析[J].高电压技术,2006,32(9):173-175.
|
[22] | Ren Dayong.Analysis of bipole block events over the years of Tian-Guang HVDC Project[J].High voltage Engineering,2006,32(9):173-175(in Chinese).
|
[23] | SIEMENS.Equipment Specifications,Surge Arresters,Type B[R].Erlangen:SIEMENS,1997.
|
[24] | SIEMENS.Equipment Specifications,Surge Arresters,Type D[R].Erlangen:SIEMENS,1997.
|
[25] | SIEMENS.Equipment Specifications,Surge Arresters,Type E[R].Erlangen:SIEMENS,1997.
|
[26] | 饶宏,蔡希鹏,傅闯,等.贵广二回高压直流逆变站无通信紧急跳闸试验的仿真分析[J].南方电网技术,2007,1(2):1-3.
|
[27] | Rao Hong,Cai Xipeng,Fu Chuang,et al.Simulation analysis on the abnormal results of the manual ESOF test to Gui-Guang II HVDC link system[J].Southern Power System Technology,2007,1(2):1-3(in Chinese).
|
[28] | 娄彦涛,吕金壮,苟锐锋,等.直流输电系统紧急停运方式对系统过电压的影响[J].南方电网技术,2009,3(6):13-17.
|
[29] | Lou Yantao,Lü Jinzhuang,Gou Ruifeng,et al.Influence of the ESOF strategy on HVDC system overvoltage[J].Southern Power System Technology,2009,3(6):13-17(in Chinese).
|