[1] | 刘树勇,顾强,张丽娟,等.“十一五”期间天津500/220 kV电网分区供电方案[J].电网技术,2008,32(9):51-55.
|
[2] | Liu Shuyong,Gu Qiang,Zhang Lijuan,et al.Research on power supply scheme based on partitioning of 500/220 kV Tianjin power grid during the 11th five-year plan[J].Power System Technology,2008,32(9):51-55(in Chinese).
|
[3] | Kong Tao,Wang Hongtao,Liu Yutian,et al.On opening 500 kV-
|
[4] | 22 0 kV electromagnetic loop circuit[J].Electric Power Automation Equipment,2003,23(12):13-16(in Chinese).
|
[5] | 王华昕,习贺勋,汤广福,等.谐振型限流器最优投切策略研究[J].电网技术,2008,32(4):36-39.
|
[6] | Wang Huaxin,Xi Hexun,Tang Guangfu,et al.Study on optimized switching on/off strategy for resonant-type fault current limiter [J].Power System Technology,2008,32(4):36-39(in Chinese).
|
[7] | 孙树敏,刘洪顺,李庆民,等.电力系统故障限流器研究综述[J].电网技术,2008,32(21):75-79.
|
[8] | 郭新志,乞建勋,李星梅.基于改进模糊层次分析法的火电厂选址综合评价方法研究[J].现代电力,2007,24(3):67-71.
|
[9] | Guo Xinzhi,Qi Jianxun,Li Xingmei.Synthetic evaluation method of site selection for thermal power plants based on improved fuzzy-AHP[J].Modern Electric Power,2007,24(3):67-71(in Chinese).
|
[10] | 郑雅楠,李庚银,周明.大用户模糊优化购电组合策略的研究[J].中国电机工程学报,2010,30(10):98-104.
|
[11] | Zheng Yanan,Li Gengyin,Zhou Ming.Studies of electricity procurement strategy for large consumers based on fuzzy optimization [J].Proceedings of the CSEE,2010,30(10):98-104(in Chinese).
|
[12] | 满若岩,付忠广.基于模糊综合评判的火电厂状态评估[J].中国电机工程学报,2009,29(5):5-10.
|
[13] | Man Ruoyan,Fu Zhongguang.Condition assessment of fossil-fired power plant based on fuzzy comprehensive evaluation [J].Proceedings of the CSEE,2009,29(5):5-10(in Chinese).
|
[14] | 黄文杰,傅砾,肖盛. 采用改进模糊层次分析法的风速预测模型[J].电网技术,2010,34(7):164-168.
|
[15] | Huang Wenjie,Fu Li,Xiao Sheng.A predictive model of wind speed based on improved fuzzy analytical hierarchy process[J].Power System Technology,2010,34(7):164-168(in Chinese).
|
[16] | 袁娟,刘文颖,董明齐,等.西北电网短路电流的限制措施[J].电网技术,2007,31(10):42-45.
|
[17] | Yuan Juan,Liu Wenying,Dong Mingqi,et al.Application of measures limiting short circuit currents in northwest China power grid[J].Power System Technology,2007,31(10):42-45(in Chinese).
|
[18] | 孔涛,王洪涛,刘玉田,等.500 kV-220 kV电磁环网开环研究[J].电力自动化设备,2003,23(12):13-16.
|
[19] | Sun Shumin,Liu Hongshun,Li Qingmin,et al.A summarization of research on fault current limiter of power system[J].Power System Technology,2008,32(21):75-79(in Chinese).
|
[20] | 于化鹏,陈水明,杨鹏程,等.220 kV变压器中性点经小电抗接地方式[J].电网技术,2011,35(1):146-151.
|
[21] | Yu Huapeng,Chen Shuiming,Yang Pengcheng,et al.Neutral grounding via small reactance for 220 kV power transformers [J].Power System Technology,2011,35(1):146-151(in Chinese).
|
[22] | 陈丽莉,黄民翔,张弘,等.电网限流措施的优化配置.电力系统自动化,2009,33(11):38-42.
|
[23] | Chen Lili,Huang Minxiang,Zhang Hong,et al.An optimization strategy for limiting short circuit current[J].Automation of Electric Power Systems,2009,33(11):38-42(in Chinese).
|
[24] | 张永康,蔡泽祥,李爱民,等.限制500 kV电网短路电流的网架调整优化算法[J].电力系统自动化,2009,33(22):34-39.
|
[25] | Zhang Yongkang,Cai Zexiang,Li Aimin,et al.An optimization algorithm for short-circuit current limitation of 500 kV power grid by adjusting power grid configuration[J].Automation of Electric Power Systems,2009,33(22):34-39(in Chinese).
|
[26] | Sarmiento H G,Castellanos R,Pampin G,et al.An example in controlling short circuit levels in a large metropolitan area [C]//Proceedings of 2003 Power Engineering Society General Meeting.Toronto,Canada:IEEE Power & Energy Society,2003:589-594.
|
[27] | 杨冬,刘玉田,牛新生.分区电网限流运行方式的综合决策方法[J].电力系统自动化,2010,34 (12):34-38.
|
[28] | Yang Dong,Liu Yutian,Niu Xinsheng.Integrated decision method of operation schemes for limiting short-circuit currents in district grids[J].Automation of Electric Power Systems,2010,34(12):34-38(in Chinese).
|
[29] | 张吉军.模糊层次分析法[J].模糊系统与数学,2000,16(2):80-88.
|
[30] | Zhang Jijun.Fuzzy analytical hierarchy process[J].Fuzzy Systems and Mathematics,2000,16(2):80-88(in Chinese).
|