电网技术  2011 

基于马尔可夫状态空间图法的换流变系统可靠性评估

, PP. 71-78

Keywords: 高压直流,输电,换流变系统,可靠性评估,马尔可夫状态空间图

Full-Text   Cite this paper   Add to My Lib

Abstract:

换流变压器可靠性对整个高压直流(highvoltagedirectcurrent,HVDC)输电系统可靠性的影响非常大,因而有必要加强对换流变系统的可靠性评估。提出了单12脉波接线的换流变系统状态间转移率(故障率、修复率和安装率)的确定方法,采用等值元件组模型建立了不计和计及备用换流变时的换流变子系统的马尔可夫状态空间图。分析了换流变备用方案成本与单12脉波接线的换流变系统可靠性的关系,总成本最小的备用方案即为最优备用方案。算例结果验证了该方法的有效性,根据各方案可靠性评估结果可确定最优备用方案。

References

[1]  张静伟,任震,黄雯莹.直流系统可靠性故障树评估模型及应用[J].电力自动化设备,2005,25(6):62-65.
[2]  Zhang Jingwei,Ren Zhen,Huang Wenying.FTA models and its application in HVDC system evaluation[J].Electric Power Automation Equipment,2005,25(6):62-65(in Chinese).
[3]  周家启,陈炜骏,谢开贵,等.高压直流输电系统可靠性灵敏度分析模型[J].电网技术,2007,31(19):18-23.
[4]  Zhou Jiaqi,Chen Weijun,Xie Kaigui,et al. A sensitivity analysis model of HVDC transmission system reliability evaluation[J].Power System Technology,2007,31(19):18-23(in Chinese).
[5]  Billinton R,Sankarakrishnan A.Adequacy assessment of composite power systems with HVDC links using Monte Carlo simulation[J].IEEE Trans on Power Systems,1994,9(3):1626-1633.
[6]  Wang Longjun,Wang Gang,Li Bo.Reliability evaluation of UHVDC systems using monte carlo simulation[C]//IEEE Power and Energy Society General Meeting.Calgary:IEEE,2009:1-6.
[7]  蒋金良,王遂,任震.基于蒙特卡罗法的高压直流输电系统可靠性评估[J].华南理工大学学报:自然科学版,2008,36(2):128-132.
[8]  Jiang Jinliang,Wang Sui,Ren Zhen.Reliability evaluation of HVDC transmission system based on Monte Carlo method[J].Journal of South China University of Technology:Natural Science Edition,2008,36(2):128-132(in Chinese).
[9]  陈永进,任震.模型组合及其在直流输电系统可靠性评估中的应用[J].电网技术,2004,28(13):18-22.
[10]  Chen Yongjin,Ren Zhen.Models combination and its application in reliability evaluation for HVDC systems[J].Power System Technology,2004,28(13):18-22(in Chinese).
[11]  陈永进,任震,梁振升,等.高压直流输电系统可靠性评估的容量模型研究[J].电网技术,2005,29(10):9-13.
[12]  胡博,黄莹,谢开贵,等.高压直流输电系统最优备用分析[J].高电压技术,2009,35(9):2286-2291.
[13]  Hu Bo,Huang Ying,Xie Kaigui,et al.Optimal spare analysis for HVDC transmission systems[J].High Voltage Engineering,2009,35(9):2286-2291(in Chinese).
[14]  Neudorf E G,Kiguel D L,Hamoud G A,et al.Cost-Benefit analysis of power system reliability:Two utility case studies[J].IEEE Trans on Power Systems,1995,10(3):1667-1675.
[15]  Kindler.Availability and reliability study report (Guizhou-Guangdong ±500 kV DC transmission project)[R].Munich:Siemens,2002.
[16]  任震,冉立.高压直流输电系统可靠性评估[M].北京:中国电力出版社,1996:1-60.
[17]  中国电力可靠性管理中心.2008年全国直流输电系统可靠性分析报告[R].北京:中国电力可靠性管理中心,2009.
[18]  任震,武娟,陈丽芳,等.高压直流输电系统可靠性评估的等效模型[J].电力系统自动化,1999,23(9):38-41.
[19]  Ren Zhen,Wu Juan,Chen Lifang,et al.Equivalent model for HVDC reliability evaluation[J].Automation of Electric Power Systems,1999,23(9):38-41(in Chinese).
[20]  Kuruganty S.Effect of reliability HVDC component enhancement on overall system reliability performance[J].IEEE Trans on Power Delivery,1994,9(1):343-351.
[21]  Chen Yongjin,Ren Zhen,Liang Zhensheng,et al.Study on capacity model for reliability evaluation of HVDC system[J].Power System Technology,2005,29(10):9-13(in Chinese).
[22]  任震,何建军,谌军,等.交直流网络系统可靠性评估的Monte Carlo—FD混合法[J].电网技术,2000,24(5):13-19.
[23]  Ren Zen,He Jianjun,Chen Jun,et al.Monte Carlo-FD comprehensive method for reliability evaluation of AC/DC hybrid networks systems[J].Power System Technology,2000,24(5):13-19(in Chinese).
[24]  王遂,任震,蒋金良.混合法在高压直流输电系统可靠性评估中的应用[J].电网技术,2007,31(12):42-46.
[25]  Wang Sui,Ren Zhen,Jiang Jinliang.Application of hybrid reliability evaluation method for HVDC transmission sytems[J]. Power System Technology,2007,31(12):42-46(in Chinese).
[26]  赵畹君.高压直流输电工程技术[M].北京:中国电力出版社,2004:290-325.
[27]  Leelaruji. R.Availability assessment of HVDC converter transformers using Markov modeling[D].Stockholm:School of Electrical Engineering,2007.
[28]  周家启,卢继平,胡小正,等.电力系统风险评估模型、方法和应用[M].北京:科学出版社,2006:23-33.
[29]  周家启,黄雯莹,吴继伟,等.工程系统可靠性评估—原理和方法[M].重庆:科技文献出版社重庆分社,1986:234-287.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133