[1] | 袁清云.特高压直流输电技术现状及在我国的应用前景[J].电网技术,2005,29(14):1-3.
|
[2] | Yuan Qingyun.Present state and application prospect of ultra HVDC transmission in China[J].Power System Technology,2005,29(14):1-3(in Chinese).
|
[3] | 范建斌,于永清,刘泽洪,等.800 kV 特高压直流输电标准体系的建立[J].电网技术,2006,30(14):13-18.
|
[4] | Fan Jianbin,Yu Yongqing,Liu Zehong,et al.Introduction of ?800?kV HVDC transmission standards system[J].Power System Technology,2006,30(14):13-18(in Chinese).
|
[5] | 常浩,樊纪超.特高压直流输电系统成套设计及其国产化[J].电网技术,2006,30(16):5-9.
|
[6] | Chang Hao,Fan Jichao.System design and its localization of UHVDC transmission project[J].Power System Technology,2006,30(16):5-9(in Chinese).
|
[7] | 刘振亚,舒印彪,张文亮,等.直流输电系统电压等级序列研究[J].中国电机工程学报,2008,28(10):1-8.
|
[8] | Liu Zhenya,Shu Yinbiao,Zhang Wenliang,et al.Study on voltage class series for HVDC transmission system[J].Power System Technology,2005,28(10):1-8(in Chinese).
|
[9] | 汤广福.2004年国际大电网会议系列报道:高压直流输电和电力电子技术发展现状及展望[J].电力系统自动化,2005,29(7):125.
|
[10] | Tang Guangfu.A review of 2004 CIGRE on application status and perspective in HVDC and power electronics[J].Automation of Electric Power Systems,2005,29(7):125(in Chinese).
|
[11] | IEC 60700—1(1998) Thyristor valves for high voltage direct current(HVDC) power transmission,Part 1:electrical testing[S].
|
[12] | IEEE Std 857—1990 IEEE guide for test procedures for hvdc thyristor valves[S].
|
[13] | 查鲲鹏,汤广福,温家良,等.灵活用于SVC和HVDC阀运行试验的新型联合试验装置[J].电力系统自动化,2005,29(17):72-75.
|
[14] | Zha Kunpeng,Tang Guangfu,Wen Jialiang,et al.New synthetic test equipment for the operational test of SVC and HVDC valves[J].Automation of Electric Power Systems,2005,29(17):72-75(in Chinese).
|
[15] | 温家良,汤广福,查鲲鹏,等.高压晶闸管阀运行试验方法与试验装置的研究与开发[J].电网技术,2006,30(21):26-31.
|
[16] | Wen Jialiang,Tang Guangfu,Zha Kunpeng,et al.Operational test method of high voltage thyristor valves and development of its synthetic test equipment[J].Power System Technology,2006,30(21):26-31(in Chinese).
|
[17] | 周会高,许钒,黄超,等.特高压直流输电换流阀运行试验合成回路研究[J].高电压技术,2006,32(12):158-163.
|
[18] | Zhou Huigao,Xu Fan,Huang Chao,et al.Research of synthetic test circuit for operational test of UHVDC thyristor valves[J].High Voltage Apparatus,2006,32(12):158-163(in Chinese).
|
[19] | 盛宝良,Jansson E,Blomberg A,等.用于HVDC晶闸管模块运行试验的新合成试验回路[J].高压电器,2002,38(5):1-4.
|
[20] | Sheng Baoliang,Jansson E,Blomberg A,et al.A new synthetic test circuit for the operational test of hvdc thyristor modules[J].High Voltage Apparatus,2002,38(5):1-4(in Chinese).
|
[21] | 赵婉君.高压直流输电工程技术[M].北京:中国电力出版社,2004:301-303.
|
[22] | 格尔赫拉 W.晶闸管[M].北京:机械工程出版社.1984:6-27.
|
[23] | Woodhouse M L.Volatage and current stresses on HVDC vlaves[J].IEEE Transactions on Power Delivery,1987,2(1):199-206.
|
[24] | 高冲,温家良,于坤山.反向恢复电荷分散性对直流换流阀的影响[J].中国电机工程学报,2008,28(28):1-5.
|
[25] | Gao Chong,Wen Jialiang,Yu Kunshan.Influence of thyristor reverse recovery charge dispersity on HVDC valves[J].Proceedings of the CSEE,2008,28(28):1-5(in Chinese).
|
[26] | 蓝元良,汤广福,印永华,等.串联晶闸管反向恢复状态的研究[J].电网技术,2006,30(16):15-19.
|
[27] | Lan Yuanliang,Tang Guangfu,Yin Yonghua,et al.Study on transient of reverse recovery of series thyrisotrs[J].Power System Technology,2006,30(16):15-19(in Chinese).
|
[28] | 刘国友,黄建伟,舒丽辉,等.六英寸高压晶闸管的研制[J].电网技术,2007,31(2):90-92.
|
[29] | Liu Guoyou,Huang Jianwei,Shu Lihui,et al.Study on developing 6 inch high voltage thyristor[J].Power System Technology,2007,31(2):90-92(in Chinese).
|
[30] | Lips H P,Pauli M.Gating system for high voltage thyristor valves[J].IEEE Transactions on Power Delivery,1989,3(3):978-983.
|
[31] | Chang W L,Song B P.Design of a thyristor snubber circuit by considering the reverse recovery process[J].IEEE Transactions on Power Electronics,1988,3(4):440-446.
|
[32] | 贺恒鑫,何俊佳.用于高压直流输电的晶闸管阀运行试验回路等价性比较[J].高压电器,2006,42(3):201-204.
|
[33] | He Hengxin,He Junjia.Equivalence evaluation of operational test circuit of HVDC thyristor valves[J].High Voltage Apparatus,2006,42(3):201-204(in Chinese).
|