Liu Y,Gu X P.Skeleton-network reconfiguration based on topological characteristics of scale-free networks and discrete particle swarm optimization[J]. IEEE Transactions on Power Systems,2007,22 (3):1267-1274.
[2]
周云海,闵勇,杨滨.黑启动及其决策支持系统[J].电力系统自动化,2001,25(15):43-46.Zhou Yunhai,Min Yong,Yang Bin.Decision support system for black-start[J].Automation of Electric Power Systems,2001,25(15):43-46(in Chinese).
[3]
Ebert A,Eppel M,Genthe S,et al.System restoration of a transmission network[C]//International Conference on Energy Management and Power Delivery.1995:91-95.
[4]
Liu C C,Liou K L,Chu R F,et al.Generation capability dispatch for bulk power system restoration:a knowledge-based approach[J].IEEE Transactions on Power Systems,1993,8(1):316-325.
[5]
Islam S,Chowdhury N.A case-based Windows graphic package for the education and training of power system restoration[J].IEEE Transactions on Power Systems,2001,16(2):181-187.
[6]
Nagata T,Sasaki H.A multi-agent approach to power system restoration[J].IEEE Transactions on Power Systems,2002,l7(2):457-462.
[7]
Yen J,Yan Y H,Contreras J,et a1.Multi-agent Approach to the Planning of Power Transmission Expansion[J].Decision Support System,2000,28(3):279-290.
[8]
赵达维,刘天琪,李兴源.电力系统恢复控制在线决策方法[J].电网技术,2013,37(10):2762-2770.Zhao Dawei,Liu Tianqi,Li Xingyuan.An on-line decision-making method applicable to power system restoration control[J].Power System Technology,2013,37(10):2762-2770(in Chinese).
[9]
谢夏慧,汪沨,卢鸣凯,等.大停电后初期基于分布式电源的配电网局部自我恢复方案[J].电网技术,2013,37(7):1834-1840.XieXiahui,Wang Feng,Lu Mingkai,et al.A distributed generation-based local self-recovery scheme for distribution network at post- blackout early stage of power grid restoration [J].Power System Technology,2013,37(7):1834-1840 (in Chinese).
[10]
刘艳,顾雪平.基于节点重要度评价的骨架网络重构[J].中国电机工程学报,2007(10):20-27.Liu Yan,GuXueping.Node important assessment based skeleton-network reconfiguration[J].Proceedings of the CSEE,2007,27(10):20-27(in Chinese).
[11]
张国松,刘俊勇,魏震波,等.兼顾拓扑优先与路径电气影响的骨架网络重构[J].电力系统保护与控制,2011,39(17):1-6.Zhang Guosong,Liu Junyong,Wei Zhenbo,et al.Skeleton-network reconfiguration based on topology priority and path electrical effects[J].Power System Protection and Control,2011,39(17):1-6(in Chinese).
[12]
林济铿,李童飞,赵子明,等.基于熵权模糊综合评价模型的电力系统黑启动方案评估[J].电网技术,2012,36(2):115-120.Lin Jikeng,Li Tongfei,Zhao Ziming,et al.Assessment on power system black-start schemes based on entropy-weighted fuzzy comprehensive evaluation model [J].Power System Technology,2012,36(2):115-120(in Chinese).
[13]
王亮,刘艳,顾雪平,等.综合考虑节点重要度和线路介数的网络重构[J].电力系统自动化,2010,34(12):29-33.Wang Liang,Liu Yan,GuXueping,et al.Skeleton network reconfiguration based on node importance and line betweenness[J].Automation of Electric Power Systems,2010,34(12):29-33(in Chinese).
[14]
梁海平,顾雪平.基于谱聚类的黑启动子系统划分[J].电网技术,2013,37(2):372-377.Liang Haiping,GuXueping.Black-start network partitioning based on spectral clustering[J].Power System Technology,2013,37(2):372-377(in Chinese).
[15]
张璨,林振智,文福拴,等.基于后悔思想的网络重构两步策略[J].电力系统自动化,2013,37(8):46-52.Zhang Can,Lin Zhenzhi,Wen Fushuan,et al.A two-stage strategy for network reconfiguration based on concept of repret[J].Automation of Electric Power Systems,2013,37(8):46-52(in Chinese).
[16]
林振智,文福拴.基于加权复杂网络模型的恢复路径优化方法[J].电力系统自动化,2009,33(6):11-15,103.Lin Zhenzhi,Wen Fushuan.A new optimization method for determining restoration paths based on weighted complex network model[J].Automation of Electric Power Systems,2009,33(6):11-15,103(in Chinese).
[17]
Gu X,Zhong H.Optimisation of network reconfiguration based on a two-layer unit-restarting framework for power system restoration[J].Generation,Transmission & Distribution,IET,2012,6(7):693-700.
[18]
梁海平,郝杰,顾雪平.计及节点恢复成功率的黑启动分区恢复方案优化[J].电工技术学报,2012(11):230-238.Liang Haiping,HaoJie,GuXueping.Optimization of system partitioning schemes for black-start restoration considering the successful rate of node restoration[J].Transactions of China Electrotechnical Society,2012,27(11):230-238(in Chinese).
[19]
朱冬雪,顾雪平,钟慧荣.电力系统大停电后机组恢复的多目标优化方法[J].电网技术,2013,37(3):814-820.Zhu Dongxue,GuXueping,ZhongHuirong.A multi-objective optimization method for post-blackout unit restoration[J].Power System Technology,2013,37(3):814-820(in Chinese).
[20]
逯怀东,郭志红,王辉,等.基于500kV网架的电网黑启动试验分析[J].电网技术,2013,37(7):1895-1901.Lu Huaidong,GuoZhihong,Wang Hui,et al.Power system black-start analysis based on 500 kV power grid[J].Power System Technology,2013,37(7):1895-1901 (in Chinese).