电网技术  2015 

有源重要用户供电风险评估方法研究

DOI: 10.13335/j.1000-3673.pst.2015.01.006, PP. 35-41

Keywords: 用户需求,供电风险,梯形模糊数,马氏距离

Full-Text   Cite this paper   Add to My Lib

Abstract:

为切实保障有源重要用户的利益,挖掘供电过程中可能诱发用户安全、优质性和效益这3个方面需求不被满足从而产生风险的供电风险因素,归纳分类形成供电风险元。基于风险元传递思想,利用梯形相似模糊数建立了供电风险与用户需求风险之间的映射关系,定义了期望值函数使模糊数精确化,通过专家意见得到用户需求风险指标下的风险评估矩阵。考虑到用户需求风险指标之间具有很高的相关度,采用马氏距离代替传统的欧式距离求解每个供电风险元与正负理想解之间的距离,计算出每个风险元的风险值,根据TOPSIS思想对供电风险元威胁大小进行排序,排序结果可以很好地帮助供电公司辨识重要风险,制定规避策略。最后通过对比分析证明了所提方法的科学性和合理性。

References

[1]  Ranjan Kumar Bose,Megha Shukla,Leena Srivastava,et al.Cost of unserved power in Karnataka,India[J].Energy Policy,2006,34(12):1434-1447.
[2]  Chowdhury A A,Mielnik T C,Lawton L E,et al.System reliability worth assessment at a midwest utility:survey results for residential customers[J].International Journal of Electrical Power & Energy Systems,2005,27(9-10):669-673.
[3]  Sullivan M J,Vardell T,Johnson M.Power interruption costs to industrial and commercial consumers of electricity[J].IEEE Transactions on Industry Applications,1997,33(6):1448-1558.
[4]  李蕊,李跃,苏剑,等.配电网重要电力用户停电损失及应急策略[J].电网技术,2011,35(10):170-176.Li Rui,Li Yue,Su Jian,et al.Power supply interruption cost of important power consumers in distribution network and its emergency management[J].Power System Technology,2011,35(10):170-176(in Chinese).
[5]  Dzobo O,Alvehag K,Gaunt C T,et al.Multi-dimensional customer segmentation model for power system reliability-worth analysis[J].International Journal of Electrical Power & Energy Systems,2014,62:532-539.
[6]  王彬,何光宇,陈颖,等.智能电网评估指标体系中电力用户需求指标集的构建[J].电网技术,2012,36(6):21-26.Wang Bin,He Guangyu,Chen Ying,et al.Construction of power consumers’ demand index set in assessment index system of smart grid[J].Power System Technology,2012,36(6):21-26(in Chinese).
[7]  张健,蒲天骄,王伟,等.智能电网示范工程综合评价指标体系[J].电网技术,2011,35(6):5-9.Zhang Jian,Pu Tianjiao,Wang Wei,et al.A comprehensive assessment index system for smart grid demonstration projects[J].Power System Technology,2011,35(6):5-9(in Chinese).
[8]  孙强,葛旭波,刘林,等.智能电网多属性网络层次组合评价法及其应用研究[J].电网技术,2012,36(10):49-54.Sun Qiang,Ge Xubo,Liu Lin,et al.Multi-attribute network process comprehensive evaluation method for smart grid and its application[J].Power System Technology,2012,36(10):49-54(in Chinese).
[9]  韩震焘,黄志伟,葛少云,等.城市配电网综合评价体系[J].电网技术,2012,36(8):95-99.Han Zhentao,Huang Zhiwei,Ge Shaoyun,et al.A comprehensiveevaluation system of urban distribution network[J].Power SystemTechnology,2012,36(8):95-99(in Chinese).
[10]  张心洁,葛少云,刘洪,等.智能配电网综合评估体系与方法[J].电网技术,2014,38(1):40-46.Zhang Xinjie,Ge Shaoyun,Liu Hong,et al.Comprehensive assessment system and method of smart distribution grid[J].Power System Technology,2014,38(1):40-46(in Chinese).
[11]  高新华,严正,基于主成分聚类分析的智能电网建设综合评价[J].电网技术,2013,37(8):2238-2243.Gao Xinhua,Yan Zheng.Comprehensive assessment of smart grid construction based on principal component analysis and cluster analysis[J].Power System Technology,2013,37(8):2238-2243(in Chinese).
[12]  Chan-Kook P,Hyun-Jae K,Yang-Soo K.A study of factors enhancing smart grid consumer engagement[J].Energy Policy,2014,72:211-218.
[13]  Jan Willem Eising,Tom van Onna,Floortje Alkemade.Towards smart grids:Identifying the risks that arise from the integration of energy and transport supply chains[J].Applied Energy,2014,123:448-455.
[14]  Rice E B,Anas AIMajali.Mitigating the risk of cyber attack on smart grid systems[J].Procedia Computer Science,2014,28:575-582.
[15]  Schuyler Matteson.Methods for multi-criteria sustainability and reliability assessments of power systems[J].Energy,2014,71(15):130-136.
[16]  Jonas Johansson,Henrik Hassel,Enrico Zio.Reliability and vulnerability analyses of critical infrastructures:comparing two approaches in the context of power systems[J].Reliability Engineering & System Safety,2013,120:27-38.
[17]  刘琳.我国供电企业服务质量外部评价及管理研究[D].北京:华北电力大学,2010.
[18]  刘志强.基于广义梯形模糊数的模糊风险分析[D].广州:广州大学,2013.
[19]  Deng H,Yeh C H,Willis R J.Inter-company comparison using modified TOPSIS with objective weights[J].Computers and Operations Research,2000,27(4):963-973.
[20]  Jahanshahloo G R,Hosseinzadeh Lotfi F,Izadikhah M.An algorithmic method to extend TOPSIS for decision-making problems with interval data[J].Applied Mathematics and Computation,2006,175(2):1375-1384.
[21]  Jin Han Park,Il Young Park,Young Chel Kwun,et al.Extension of the TOPSIS method for decision making problems under interval- valued intuitionistic fuzzy environment[J].Applied Mathematical Modelling,2011,35(5):2544-2556.
[22]  Mokhtarian M N,Sadi-nezhad S,Makui A.A new flexible and reliable IVF-TOPSIS method based on uncertainty risk reduction in decision making process[J].Applied Soft Computing,2014,23:509-520.
[23]  李彦斌,于心怡,王致杰.采用灰色关联度与TOPSIS法的光伏发电项目风险评价研究[J].电网技术,2013,37(6):1514-1519.Li Yanbin,Yu Xinyi,Wang Zhijie.Risk assessment on photovoltaic power generation project by grey correlation analysis and TOPSIS method[J].Power System Technology,2013,37(6):1514-1519(in Chinese).
[24]  胡元潮,阮羚,阮江军,等.基于改进逼近理想点法的变电站智能化改造评估[J].电网技术,2012,36(10):42-48.Hu Yuanchao,Ruan Ling,Ruan Jiangjun,et al.Evaluation on intelligent renovation of substations based on improved TOPSIS[J].Power System Technology,2012,36(10):42-48(in Chinese).
[25]  王先甲,汪磊.基于马氏距离的改进型TOPSIS在供应商选择中的应用[J].控制与决策,2012,27(10):1566-1570.Wang Xianjia,Wang Lei.Applications of TOPSIS improved based on Mahalanobis distance in supplier selection[J].Control and Decision,2012,27(10):1566-1570.