张毅威,丁超杰,闵勇,等.欧洲智能电网项目的发展与经验[J].电网技术,2014,38(7):1717-1723.Zhang Yiwei,Ding Chaojie,Min Yong,et al.Development and experiences of smart grid projects in Europe[J].Power System Technology,2014,38(7):1717-1723(in Chinese).
[2]
宋亚奇,周国亮,朱永利.智能电网大数据处理技术现状与挑战[J].电网技术,2013,37(4):927-935.Song Yaqi,Zhou Guoliang,Zhu Yongli.Present status and challenges of big data processing in smart grid[J].Power System Technology,2013,37(4):927-935(in Chinese).
[3]
刘晓胜,张良,周岩,等.低压电力线通信人工蛛网结构的可靠性分析[J].中国电机工程学报,2012,32(28):142-149.Liu Xiaosheng,Zhang Liang,Zhou Yan,et al.Reliability analysis of artificial cobweb structure for power-line communication of low-voltage distribution networks[J].Proceedings of the CSEE,2012,32(28):142-149(in Chinese).
[4]
荆孟春,王继业,程志华,等.电力物联网传感器信息模型研究与应用[J].电网技术,2014,38(2):532-537.Jing Mengchun,Wang Jiye,Cheng Zhihua,et al.Research and application of sensor information model in power internet of things [J].Power System Technology,2014,38(2):532-537(in Chinese).
[5]
Stanislav Mudriievskyi.Power line communications:state of the art in research,development and application[J].AEU-International Journal of Electronics and Communications,2014,68(7):575-577.
[6]
戚佳金,陈雪萍,刘晓胜.低压电力线载波通信技术研究进展[J].电网技术,2010,34(5):161-172.Qi Jiajin,Chen Xueping,Liu Xiaosheng.Advances of research on low-voltage power line communication technology[J].Power System Technology,2010,34(5):161-172(in Chinese).
[7]
刘晓胜,戚佳金,宋其涛,等.基于蚁群算法的低压配电网电力线通信组网方法[J].中国电机工程学报,2008,28(1):71-76.Liu Xiaosheng,Qi Jiajin,Song Qitao,et al.Method of constructing power line communication networks over low-voltage distribution networks based on ant colony optimization[J].Proceedings of the CSEE,2008,28(1):71-76(in Chinese).
[8]
Ahmed M,Lampe L.Power line communications for low-voltage power grid tomography[J].IEEE Transactions on Communications,2013,61(12):5163-5175.
[9]
李春阳,黑勇,乔树山.OFDM电力线载波通信系统的定时同步和模式识别[J].电力系统自动化,2012,36(8):58- 60.Li Chunyang,Hei Yong,Qiao Shushan.Timing synchronization and mode identification for OFDM based power line communication systems[J].Automation of Electric Power Systems,2012,36(8):58- 60(in Chinese).
[10]
Martin Hoch.Comparison of PLC G3 and PRIME[C]//2011 IEEE International Symposium on Power Line Communications and Its Applications (ISPLC).Udine,Italy:IEEE,2011:165-169.
[11]
Razazian K,Kamalizad A,Umari M,et al.G3-PLC field trials in US distribution grid:initial results and requirements[C]//2011 IEEE International Symposium on Power Line Communications and Its Applications (ISPLC).Udine,Italy:IEEE,2011:153-158.
[12]
张童飞,郭静波.高速窄带 OFDM 电力线通信实时动态频谱分配[J].中国电机工程学报,2014,34(4):695- 701.Zhang Tongfei,Guo Jingbo.Real-time dynamic spectrum management in OFDM-based high-data rate narrowband power line communications[J].Proceedings of the CSEE,2014,34(4):695-701(in Chinese).
[13]
梁栋,张保会,牛东文,等.用于多用户宽带电力线通信的同步信号的设计与实现[J].中国电机工程学报,2014,34(1):197-205.Liang Dong,Zhang Baohui,Niu Dongwen,et al.Design and implementation of the synchronization signal based for multi-user broadband power line communications[J].Proceedings of the CSEE,2014,34(1):197-205(in Chinese).
[14]
Razazian K,Umari M,Kamalizad A,et al.G3-PLC specification for power line communication: overview,system simulation and field trial results[C]//2010 IEEE International Symposium on Power Line Communications and Its Applications (ISPLC).Rio de Janeiro:IEEE,2010:313-318.
[15]
Patti G,Alderisi G,Lo Bello L.Performance assessment of the PRIME MAC layer protocol[C]//2013 11th IEEE International Conference on Industrial Informatics(INDIN).Bochum:IEEE,2013:158- 164.
[16]
Saif A,Othman M,et al.An Optimized A-MSDU frame aggregation with subframe retransmission in IEEE 802.11n wireless networks[J].Procedia Computer Science,2012,4(9):812- 821.
[17]
Frohn S,Gübner S,Lindemann C.Analyzing the effective throughput in multi-hop IEEE 802.11n networks[J].Computer Communications,2011,34(16):1912-1921.
[18]
Saif A,Othman M.SRA-MSDU:enhanced A-MSDU frame aggregation with selective retransmission in 802.11n wireless networks[J].Journal of Network and Computer Applications,2013,36(4):1219-1229.
[19]
戚佳金,刘晓胜,张良.一种低压配电网电力线载波通信网络中继算法[J].电力系统保护与控制,2010,38(14):73-78.Qi Jiajin,Liu Xiaosheng,Zhang Liang.A power line communication relay algorithm for low voltage distribution[J].Power System Protection and Control,2010,38(14):73-78(in Chinese).
[20]
冉庆华,吴玉成,祁美娟.低压电力线载波通信网络自动组网方法研究[J].电力系统保护与控制,2011,39(10):53-58.Ran Qinghua,Wu Yucheng,Qi Meijuan.Research on automatic routing method of low voltage power line communication network[J].Power System Protection and Control,2011,39(10):53-58(in Chinese).
[21]
Montenegro G,Kushalnagar N,Hui J,et al.RFC4944[J].Transmission of IPv6 packets over IEEE,2007,802(4):1-30.
[22]
Kushalnagar N,Montenegro G,Schumacher C.IPv6 over low-power wireless personal area networks (6LoWPANs):overview,assumptions,problem statement,and goals[J].Network Working Group Request for Comments:RFC4919,2007,802(3):1-12.
[23]
殷树刚,张成文,田海亭,等.载波侦听/冲突检测机制应用于低压电力线载波通信的适应性分析[J].电网技术,2012,36(8):233-238.Yin Shugang,Zhang Chengwen,Tian Haiting,et al.Adaptability analysis on application of CSMA/CD in low-voltage power line communication system[J].Power System Technology,2012,36(8):233-238(in Chinese).
[24]
Chauvenet C,Tourancheau B,Genon-Catalot D,et al.A communication stack over PLC for multi physical layer IPv6 Networking[C]//2010 First IEEE International Conference on Smart Grid Communications.Gaithersburg,MD:IEEE,2010:250-255.
[25]
Kim K,Park S D,Montenegro G,et al.6LoWPAN ad hoc on-demand distance vector routing (LOAD)[J].Network Working Group Internet Draft(work in progress),2007,802(1):1-17.
[26]
Razazian K,Niktash A,Loginov V,et al.Enhanced 6LoWPAN Ad hoc routing for G3-PLC[C]// 2013 17th IEEE International Symposium on Power Line Communications and Its Applications (ISPLC).Johannesburg:IEEE,2013:137-142.