Orfanos George A,GeorgilakisPavlos S,Hatziargyriou Nikos D.Transmission expansion planning of systems with increasing wind power integration[J].IEEE Transactions on Power Systems,2013,28(2):1355-1362.
[2]
范宏,程浩忠,唐永红,等.相关机会二层规划法在输电网扩展规划中的应用[J].电力自动化设备,2013,33(11):59-63.Fan Hong,Cheng Haozhong,Tang Yonghong,et al.Application of dependent-chance bilevel programming in transmission network expansion planning[J].Electric Power Automation Equipment,2013,33(11):59-63(in Chinese).
[3]
高赐威,吴天婴,何叶,等.考虑风电接入的电源电网协调规划[J].电力系统自动化,2012,36(22):30-35.GaoCiwei,Wu Tianying,He Ye,et al.Generation and transmission coordinated planning considering wind power integration[J].Automation of Electric Power Systems,2012,36(22):30-35(in Chinese).
[4]
Gu Yang,McCalley James D,Ni Ming.Coordinating large-scale wind integration and transmission planning[J].IEEE Transactions on Sustainable Energy,2012,3(4):652-659.
[5]
Subcommittee PM.IEEE reliability test system[J].IEEE Transactions on Power Apparatus and Systems,1979,PAS-98(6):2047-2054.
刘铠滢,蔡述涛,张尧.基于风险评判的电网规划方法[J].中国电机工程学报,2007,27(22):69-73.Liu Kaiying,CaiShutao,Zhang Yao.The power network planning method based on risk evaluation[J].Proceedings of the CSEE,2007,27(22):69-73(in Chinese).
[9]
乔嘉赓,徐飞,鲁宗相,等.基于相关机会规划的风电并网容量优化分析[J].电力系统自动化,2008,32(10):84-87.QiaoJiageng,XuFei,Lu Zongxiang,et al.Optimization analysis model of grid-connected wind capacity based on dependent chance programming[J].Automation of Electric Power Systems,2008,32(10):84-87(in Chinese).
[10]
陈斌,赵国波,刘天琪,等.基于灰色机会约束规划的输电系统规划[J].电网技术,2009,33(1):22-25.Chen Bin,Zhao Guobo,Liu Tianqi,et al.Power transmission system planning based on grey chance constrained programming[J].Power System Technology,2009,33(1):22-25(in Chinese).
[11]
曾鸣,吕春泉,邱柳青,等.风电并网时基于需求侧响应的输电规划模型[J].电网技术,2011,35(4):129-134.Zeng Ming,LüChunquan,QiuLiuqing,et al.A demand-side response-based transmission planning model with grid-connected wind farms[J].Power System Technology,2011,35(4):129-134(in Chinese).
[12]
符杨,孟令合,胡荣,等.改进多目标蚁群算法在电网规划中的应用[J].电网技术,2009,33(18):57-62.Fu Yang,MengLinghe,Hu Rong,et al.Application of improved multi-objective ant colony algorithm in power network planning[J].Power System Technology,2009,33(18):57-62(in Chinese).
[13]
曾鸣,田廓,薛松,等.基于混沌量子蜜蜂算法的机会约束输电规划[J].电力系统保护与控制,2010,38(22):1-7.Zeng Ming,TianKuo,Xue Song,et al.Chance constrained transmission planning method based on chaos quantum honey bee algorithm [J].Power System Protection and Control,2010,38(22):1-7(in Chinese).
[14]
曹承栋,常鲜戎,刘艳.考虑地理因素的改进量子粒子群算法在多目标电网规划中的应用[J].电网技术,2012,36(3):134-139.Cao Chengdong,Chang Xianrong,Liu Yan.Application of improved quantum particle swarm optimization in power network planning considering geography factor[J].Power System Technology,2012,36(3):134-139(in Chinese).
[15]
Billinton Roy,WangdeeWijarn.Reliability-based transmission reinforcement planning associated with large-scale wind farms[J].IEEE Transactions on Power Systems,2007,22(1):34-41.
[16]
于晗,钟志勇,黄杰波,等.考虑负荷和风电出力不确定性的输电系统机会约束规划[J].电力系统自动化,2009,33(2):20-24.Yu Han,Chung C Y,Wong K P,et al.A chance constrained transmission network expansion planning method associated with load and wind farm variations[J].Automation of Electric Power Systems,2009,33(2):20-24(in Chinese).
[17]
UgranliFaruk,KaratepeEngin.Transmission expansion planning for wind turbine integrated power systems considering contingencies[C]// 2014 IEEE International Symposium on,Innovations in Intelligent Systems and Applications (INISTA) Proceedings.Alberobello,Italy:IEEE,2014:350-355.